Professional Documents
Culture Documents
Umbac Layout2 PDF
Umbac Layout2 PDF
+0.000
FIREWALL
+0.800
3 TOP OF ROOM BEAM FIREWALL
+.3000 +6.000
3 TOP OF ROOM BEAM
FIREWALL
+2.700 +2.700
3 TOP OF ROOM BEAM 3 TOP OF ROOM BEAM
+3.000
+3.300 2 SECOND FLOOR
2 SECOND FLOOR
±0.300
1 GROUND FLOOR
±0.030
1 GROUND FLOOR
4 3 2 1 1 2 3 4
4 ROOF LEVEL
TOP OF ROOM BEAM
+.3000
4 ROOF LEVEL +.3000
3 TOP OF ROOM BEAM
+2.700
4 ROOF LEVEL +2.700
3 TOP OF ROOM BEAM
+3.300
2 SECOND FLOOR
+3.300
2 SECOND FLOOR
Concrete Canopy
±0.030
1 GROUND FLOOR
±0.030
1 GROUND FLOOR
PROFESSIONAL CIVIL ENGINEER IMPORTANT: PROJECT TITLE PROJECT OWNER SHEET CONTENT SHEET NO.
THESE DRAWINGS AND SPECIFICATIONS DULY SIGNED,
1.FRONT ELEVATION
GROUP 2 STAMPED OR SEALED AS INSTRUMENT OF SERVICE ARE THE
PROPERTY AND DOCUMENTS OF THE ENGINEER, WHETHER THE 2. REAR ELEVATION
1
CIVIL ENGINEER OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT