Professional Documents
Culture Documents
Pel TP 00 Ins DS 004
Pel TP 00 Ins DS 004
TABLE OF CONTENT
CLIENT APPROVAL
REV DATE DESCRIPTION PREPARED CHECKED APPROVED
BY DATE
0 8-Aug-16 IFB YF DW BA
1 6-Feb-17 IFB ND DW BA
NOTE :
* Vendor to Advise
1 Pressure Safety Valve shall be pre-assembled, leak test in accordance with API RP 527 and pressure test accordance to API 526
2 Calculation shall be confirmed and provided by vendor.
3 Pressure Safety Valve shall be applied in accordance with PEL-TP-00-INS-SP-001 (General Specification for Instruments).
4 All instrument shall be supplied with a 316 SS name plate with instrument tag no and model no, permanenly inscribed.
5 Manufacturer's documentation to be include, material certificates for wetted parts, pop test certificate, hydrotest report, installation
operation and maintenance instruction, spare part list, documentation drawing.
6 Vendor shall be responsible for correct model and type selection.
p
CLIENT APPROVAL
REV DATE DESCRIPTION PREPARED CHECKED APPROVED
BY DATE
0 8-Aug-16 IFB YF DW BA
1 6-Feb-17 IFB ND DW BA
P&ID No.
No Tag Number Line / Equipment Number Relief Case Material Class
PEL-TP-00-PRO-
1 PSV-009 L-005 DWG-001 SHEET 5 OF 11 Fire Case Not Classified
2 PSV-010 R-005 DWG-001 SHEET 5 OF 11 Fire Case Not Classified
3 PSV-011 L-006 DWG-001 SHEET 5 OF 11 Fire Case Not Classified
4 PSV-012 R-006 DWG-001 SHEET 5 OF 11 Fire Case Not Classified