You are on page 1of 23

Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.

MAPCO LLC Field Quarantine Unit


Abu Dhabi, Page 1

General Project Data Input


General Project Information
Project file name: D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field
Quarantine Unit - G+3.CHV
Project title: Field Quarantine Unit
Project date: Monday, 23 March, 2020
Weather reference city: AD DAWHAH, QATAR
Client name: ASHGHAL
Barometric pressure: 1009.219 mbar
Altitude: 9.7536 meters
Latitude: 25 Degrees
Mean daily temperature range: 0 Degrees
Starting & ending time for HVAC load calculations: 1am - 12am
Number of unique zones in this project: 2

Building Default Values


Calculations performed: Both heating and cooling loads
Lighting requirements: 15.00 Watts per square meter
Equipment requirements: 5.00 Watts per square meter
People sensible load multiplier: 65 Watts per person
People latent load multiplier: 30 Watts per person
Zone sensible safety factor: 0 %
Zone latent safety factor: 0 %
Zone heating safety factor: 0 %
People diversity factor: 100 %
Lighting profile number: 0
Equipment profile number: 0
People profile number: 0
Building default ceiling height: 3.50 meters
Building default wall height: 3.50 meters

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 2

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grams In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
August 46 30 50% 23 11.64 19
Winter 12 24

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 8 0.738 No No

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 B 0.517 D

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 1.079 15 0

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.800 0.630 0.250 1 0.000

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 3

Air Handler Input


Air Handler Number 1 Input Data
Name: PU-FQU-1
Terminal type: Constant Volume
Method for CV Proportion
Supply fan type: Draw-thru fan
Calculations performed: Cooling loads only
Excess supply air: Reserve
Occurrences: 1
People profile number: 0
Lighting profile number: 0
Equipment profile number: 0
Exhaust may not exceed supply air: No
Leaving heating coil temp (deg.C): 25.0
Leaving cooling coil temp (deg.C): 13.0
Cooling coil L/s 14,000
Misc. Watts gain - supply side: 0
Misc. Watts gain - return side: 0
Combined fan & motor efficiency: 70
Static pressure across fan (kPa): 0.00
Summer supply duct temp rise (deg.C): 1.000
Summer return duct temp rise (deg.C): 1.000
Winter supply duct temp drop (deg.C): 0.000
Winter return duct temp drop (deg.C): 0.000
Chilled water temp difference (deg.C): 0.000
Hot water temp difference (deg.C): 0.000
Cooling ventilation: 2 AC/Hr
Cooling infiltration: 0 AC/Hr
Heating ventilation: 0 L/s/Pr
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.C): 0
Pretreated air Summer WB (deg.C): 0
Pretreated air Winter DB (deg.C): 0

Design Outdoor Outdoor Indoor Indoor Grams In/Outdoor


Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
August 46 30 50% 24 11.09 18
Winter 12 24

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 4

Zone Input
Zone 1: PU-FQU-1 (1200 sq.m) (Group 0)
Air Handler number: 1 Zone occurrences: 1
Zone length: (meters) 100.00 Zone width (meters): 12.00
Lighting Watts: 18,000 Equipment Watts: 6,000
Number of people in zone: 71 People profile number: 0
Lighting profile number: 0 Equipment profile number: 0
Ceiling height (meters): 3.50 Heating safety factor (%): 0
Sensible safety factor (%): 0 Latent safety factor (%): 0
Sensible heat per person (Watts): 65 Latent heat per person (Watts): 30
Cooling ventilation method: AC/Hr Cooling ventilation value: 2.000
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: L/s/Pr Heating ventilation value: 0.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air L/s: 0 Summer exhaust air L/s: 0
Minimum supply L/s: 0 Latent Watts equipment load: 0
Ceil. exposed to plenum (sq.m): 1,200 Exposed floor slab perimeter (m): 0
Cooling loads only are calculated for this zone.

Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil


1 1 8 0.738 No 100.00 12.00 1,200.0 No

Wall Type ASHRAE# U-Factor Color Height Width Area Direction


1 1 B 0.517 D 3.50 200.00 700.0 E
2 1 B 0.517 D 3.50 24.00 84.0 W

Glass Type S.U-F. Shd C. Height Width Occur. Area Shade Tilt Ref
1 1 1.800 0.250 1.50 50.00 1 75.0 0 90 1

Zone 2: PU-FQU-1 (1200 sq.m) (Group 0)


Air Handler number: 1 Zone occurrences: 1
Zone length: (meters) 100.00 Zone width (meters): 12.00
Lighting Watts: 18,000 Equipment Watts: 6,000
Number of people in zone: 71 People profile number: 0
Lighting profile number: 0 Equipment profile number: 0
Ceiling height (meters): 3.50 Heating safety factor (%): 0
Sensible safety factor (%): 0 Latent safety factor (%): 0
Sensible heat per person (Watts): 65 Latent heat per person (Watts): 30
Cooling ventilation method: AC/Hr Cooling ventilation value: 2.000
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: L/s/Pr Heating ventilation value: 0.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air L/s: 0 Summer exhaust air L/s: 0
Minimum supply L/s: 0 Latent Watts equipment load: 0
Ceil. exposed to plenum (sq.m): 1,200 Exposed floor slab perimeter (m): 0
Cooling loads only are calculated for this zone.

Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil


1 1 8 0.738 No 100.00 12.00 1,200.0 No

Wall Type ASHRAE# U-Factor Color Height Width Area Direction


1 1 B 0.517 D 3.50 200.00 700.0 E
2 1 B 0.517 D 3.50 24.00 84.0 W

Glass Type S.U-F. Shd C. Height Width Occur. Area Shade Tilt Ref
1 1 1.800 0.250 1.50 50.00 1 75.0 0 90 1

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 5

Building Summary Loads


Building peaks in August at 7pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 2,400 0 0.00 0 58,662 58,662 11.99
Wall 1,418 0 0.00 0 23,999 23,999 4.90
Glass 150 0 0.00 0 6,510 6,510 1.33
Floor Slab 0 0 0.00 0 0 0 0.00
Skin Loads 0 0.00 0 89,172 89,172 18.22
Lighting 36,000 0 0.00 0 36,000 36,000 7.36
Equipment 12,000 0 0.00 0 12,000 12,000 2.45
People 142 0 0.00 4,260 9,230 13,490 2.76
Partition 0 0 0.00 0 0 0 0.00
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 4,667 0 0.00 152,630 126,134 278,764 56.96
Heat. Vent. 0 0 0.00 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 1,393 1,393 0.28
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 24,199 24,199 4.94
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 17,199 17,199 3.51
Return Duct 0 0 0.00 0 17,199 17,199 3.51
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 0 0.00 156,890 332,527 489,417 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0.00 152,630 126,134 278,764 56.96
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 0 0.00 4,260 170,601 174,861 35.73
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 0 0.00 0 35,792 35,792 7.31
Building Totals 0 0.00 156,890 332,526 489,417 100.00

Check Figures
Total Building Supply Air (based on a 11° TD): 13,999 L/s
Total Building Vent. Air (33.33% of Supply): 4,667 L/s
Total Conditioned Air Space: 2,400 Sq.m
Supply Air Per Unit Area: 5.8331 L/s/Sq.m
Area Per Cooling Capacity: 4.9038 Sq.m/kW 17.2459 Sq.m/Ton
Cooling Capacity Per Area: 0.2039 kW/Sq.m 0.0580 Tons/Sq.m
Heating Capacity Per Area: 0.00 Watts/Sq.m
Total Heating Required With Outside Air: 0.00 kW
Total Cooling With Outside Air: 489.42 kW 139.16 Tons

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 6

Building Summary Loads (G)


Building peaks in August at 7pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 2,400 0 0.00 0 58,662 58,662 11.99
Wall 1,418 0 0.00 0 23,999 23,999 4.90
Glass 150 0 0.00 0 6,510 6,510 1.33
Floor Slab 0 0 0.00 0 0 0 0.00
Skin Loads 0 0.00 0 89,172 89,172 18.22
Lighting 36,000 0 0.00 0 36,000 36,000 7.36
Equipment 12,000 0 0.00 0 12,000 12,000 2.45
People 142 0 0.00 4,260 9,230 13,490 2.76
Partition 0 0 0.00 0 0 0 0.00
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 4,667 0 0.00 152,630 126,134 278,764 56.96
Heat. Vent. 0 0 0.00 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 1,393 1,393 0.28
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 24,199 24,199 4.94
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 17,199 17,199 3.51
Return Duct 0 0 0.00 0 17,199 17,199 3.51
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 0 0.00 156,890 332,527 489,417 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0.00 152,630 126,134 278,764 56.96
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 0 0.00 4,260 170,601 174,861 35.73
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 0 0.00 0 35,792 35,792 7.31
Building Totals 0 0.00 156,890 332,526 489,417 100.00

Check Figures
Total Building Supply Air (based on a 11° TD): 13,999 L/s
Total Building Vent. Air (33.33% of Supply): 4,667 L/s
Total Conditioned Air Space: 2,400 Sq.m
Supply Air Per Unit Area: 5.8331 L/s/Sq.m
Area Per Cooling Capacity: 4.9038 Sq.m/kW 17.2459 Sq.m/Ton
Cooling Capacity Per Area: 0.2039 kW/Sq.m 0.0580 Tons/Sq.m
Heating Capacity Per Area: 0.00 Watts/Sq.m
Total Heating Required With Outside Air: 0.00 kW
Total Cooling With Outside Air: 489.42 kW 139.16 Tons

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 7

Air Handler #1 - PU-FQU-1 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.L/s Clg.L/s S.Exh Req.L/s Req.L/s
Volume L/s/Sqm L/s/Sqm W.Exh Act.L/s Act.L/s
1 PU-FQU-1 1,200 0 73,201 2,130 None 2/Hr
7pm August 71 0 7,000 0 0 2,333
4,200 0.00 5.83 0 0 2,333

2 PU-FQU-1 1,200 0 73,201 2,130 None 2/Hr


7pm August 71 0 7,000 0 0 2,333
4,200 0.00 5.83 0 0 2,333
Zone Peak Totals: 2,400 0 146,402 4,260
Total Zones: 2 142 0 13,999 0 0 4,667
Unique Zones: 2 8,400 0.00 5.83 0 0 4,667

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 8

Air Handler #1 - PU-FQU-1 - Total Load Summary


Air Handler Description: PU-FQU-1 Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 1.40 kW
Fan Input: 70% motor and fan efficiency with 0 kPa across the fan
Sensible Heat Ratio: 0.98 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in August.
Outdoor Conditions: 46° DB, 30° WB, 20.40 grains
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Watts
Infiltration sensible loss: 0 Watts 0 L/s
Outside Air sensible loss: 0 Watts 0 L/s
Supply Duct sensible loss: 0 Watts
Return Duct sensible loss: 0 Watts
Return Plenum sensible loss: 0 Watts
Total System sensible loss: 0 Watts
Heating Supply Air: 0 / (.999 X 1.21 X 0) = 0 L/s
Winter Vent Outside Air (0.0% of supply) = 0 L/s
Zone space sensible gain: 146,402 Watts
Infiltration sensible gain: 0 Watts
Draw-thru fan sensible gain: 1,393 Watts
Supply duct sensible gain: 17,199 Watts
Reserve sensible gain: 24,199 Watts
Total sensible gain on supply side of coil: 189,193 Watts
Cooling Supply Air: 189,193 / (.999 X 1.23 X 11) = 13,999 L/s
Summer Vent Outside Air (33.3% of supply) = 4,667 L/s
Return duct sensible gain: 17,199 Watts
Return plenum sensible gain: 0 Watts
Outside air sensible gain: 126,134 Watts 4,667 L/s
Blow-thru fan sensible gain: 0 Watts
Total sensible gain on return side of coil: 143,333 Watts
Total sensible gain on air handling system: 332,526 Watts
Zone space latent gain: 4,260 Watts
Infiltration latent gain: 0 Watts
Outside air latent gain: 152,630 Watts
Total latent gain on air handling system: 156,890 Watts
Total system sensible and latent gain: 489,417 Watts

Check Figures
Total Air Handler Supply Air (based on a 11° TD): 13,999 L/s
Total Air Handler Vent. Air (33.33% of Supply): 4,667 L/s
Total Conditioned Air Space: 2,400 Sq.m
Supply Air Per Unit Area: 5.8331 L/s/Sq.m
Area Per Cooling Capacity: 4.9038 Sq.m/kW 17.2459 Sq.m/Ton
Cooling Capacity Per Area: 0.2039 kW/Sq.m 0.0580 Tons/Sq.m
Heating Capacity Per Area: 0.00 Watts/Sq.m
Total Heating Required With Outside Air: 0.00 kW
Total Cooling With Outside Air: 489.42 kW 139.16 Tons

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 9

Air Handler #1 - PU-FQU-1 - Summary Loads for Groups (G)


Gr Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Group Peak Time People Htg.L/s Clg.L/s S.Exh Req.L/s Req.L/s
Volume L/s/Sqm L/s/Sqm W.Exh Act.L/s Act.L/s
0 Group 0 2,400 0 146,402 4,260 n/a n/a
7pm August 142 0 13,999 0 0 4,667
8,400 0.00 5.83 0 0 4,667
Group Peak Totals: 2,400 0 146,402 4,260
Total Groups: 1 142 0 13,999 0 0 4,667
8,400 0.00 5.83 0 0 4,667

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 10

Air Handler #1 - PU-FQU-1 - Summary Loads for Zones (G)


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Group Peak Time People Htg.L/s Clg.L/s S.Exh Req.L/s Req.L/s
Volume L/s/Sqm L/s/Sqm W.Exh Act.L/s Act.L/s
1 PU-FQU-1 1,200 0 73,201 2,130 None 2/Hr
7pm August 71 0 7,000 0 0 2,333
4,200 0.00 5.83 0 0 2,333

2 PU-FQU-1 1,200 0 73,201 2,130 None 2/Hr


7pm August 71 0 7,000 0 0 2,333
4,200 0.00 5.83 0 0 2,333
Zone Peak Totals: 2,400 0 146,402 4,260
Total Zones: 2 142 0 13,999 0 0 4,667
8,400 0.00 5.83 0 0 4,667

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 11

Air Handler #1 - PU-FQU-1 - Total Load Summary (G)


Air Handler Description: PU-FQU-1 Constant Volume - Proportion
Supply Air Fan: Draw-Thru with program estimated horsepower of 1.40 kW
Fan Input: 70% motor and fan efficiency with 0 kPa across the fan
Sensible Heat Ratio: 0.98 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in August.
Outdoor Conditions: 46° DB, 30° WB, 20.40 grains
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Watts
Infiltration sensible loss: 0 Watts 0 L/s
Outside Air sensible loss: 0 Watts 0 L/s
Supply Duct sensible loss: 0 Watts
Return Duct sensible loss: 0 Watts
Return Plenum sensible loss: 0 Watts
Total System sensible loss: 0 Watts
Heating Supply Air: 0 / (.999 X 1.21 X 0) = 0 L/s
Winter Vent Outside Air (0.0% of supply) = 0 L/s
Zone space sensible gain: 146,402 Watts
Infiltration sensible gain: 0 Watts
Draw-thru fan sensible gain: 1,393 Watts
Supply duct sensible gain: 17,199 Watts
Reserve sensible gain: 24,199 Watts
Total sensible gain on supply side of coil: 189,193 Watts
Cooling Supply Air: 189,193 / (.999 X 1.23 X 11) = 13,999 L/s
Summer Vent Outside Air (33.3% of supply) = 4,667 L/s
Return duct sensible gain: 17,199 Watts
Return plenum sensible gain: 0 Watts
Outside air sensible gain: 126,134 Watts 4,667 L/s
Blow-thru fan sensible gain: 0 Watts
Total sensible gain on return side of coil: 143,333 Watts
Total sensible gain on air handling system: 332,526 Watts
Zone space latent gain: 4,260 Watts
Infiltration latent gain: 0 Watts
Outside air latent gain: 152,630 Watts
Total latent gain on air handling system: 156,890 Watts
Total system sensible and latent gain: 489,417 Watts

Check Figures
Total Air Handler Supply Air (based on a 11° TD): 13,999 L/s
Total Air Handler Vent. Air (33.33% of Supply): 4,667 L/s
Total Conditioned Air Space: 2,400 Sq.m
Supply Air Per Unit Area: 5.8331 L/s/Sq.m
Area Per Cooling Capacity: 4.9038 Sq.m/kW 17.2459 Sq.m/Ton
Cooling Capacity Per Area: 0.2039 kW/Sq.m 0.0580 Tons/Sq.m
Heating Capacity Per Area: 0.00 Watts/Sq.m
Total Heating Required With Outside Air: 0.00 kW
Total Cooling With Outside Air: 489.42 kW 139.16 Tons

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 12

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-PU-FQU-1 peaks (sensible) in August at 7pm, Air Handler 1 (PU-FQU-1), Group 0, 100.0 x 12.0,
Construction Type: 1 (Light)
Roof-1-8-No.Clg-L 1,200 0.50 33.1 0.738 29,331 9.022 10,827
Wall-1-E-B-D 625 1 33.1 0.517 10,693 6.315 3,947
Wall-2-W-B-D 84 1 30.1 0.517 1,307 6.315 530
Gls-E-1-90-Tran 75.0 1.000 24 1.800 3,255 7.700 577
0%S-0-WS-Solar 75.0 0.000 694 0.060 0
Lights-Prof=0 18,000 1.000 18,000
Equipment-Prof=0 6,000 1.000 6,000 0
People-Prof=0 71.0 1.000 4,615 2,130
Sub-total 73,201 2,130 0
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 73,201 2,130 0

Zone 2-PU-FQU-1 peaks (sensible) in August at 7pm, Air Handler 1 (PU-FQU-1), Group 0, 100.0 x 12.0,
Construction Type: 1 (Light)
Roof-1-8-No.Clg-L 1,200 0.50 33.1 0.738 29,331 9.022 10,827
Wall-1-E-B-D 625 1 33.1 0.517 10,693 6.315 3,947
Wall-2-W-B-D 84 1 30.1 0.517 1,307 6.315 530
Gls-E-1-90-Tran 75.0 1.000 24 1.800 3,255 7.700 577
0%S-0-WS-Solar 75.0 0.000 694 0.060 0
Lights-Prof=0 18,000 1.000 18,000
Equipment-Prof=0 6,000 1.000 6,000 0
People-Prof=0 71.0 1.000 4,615 2,130
Sub-total 73,201 2,130 0
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 73,201 2,130 0

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 13

Building Load Profiles


Note: Only the peak hour and month were calculated because 'fast peak determination' was used.
Bldg. August (None) (None) (None) (None) (None)
Hour Sen. Load Sen. Load Sen. Load Sen. Load Sen. Load Sen. Load
1am 0 0 0 0 0 0
2am 0 0 0 0 0 0
3am 0 0 0 0 0 0
4am 0 0 0 0 0 0
5am 0 0 0 0 0 0
6am 0 0 0 0 0 0
7am 0 0 0 0 0 0
8am 0 0 0 0 0 0
9am 0 0 0 0 0 0
10am 0 0 0 0 0 0
11am 0 0 0 0 0 0
12pm 0 0 0 0 0 0
1pm 0 0 0 0 0 0
2pm 0 0 0 0 0 0
3pm 0 0 0 0 0 0
4pm 0 0 0 0 0 0
5pm 0 0 0 0 0 0
6pm 0 0 0 0 0 0
7pm 332,526 0 0 0 0 0
8pm 0 0 0 0 0 0
9pm 0 0 0 0 0 0
10pm 0 0 0 0 0 0
11pm 0 0 0 0 0 0
12am 0 0 0 0 0 0
Bldg. August (None) (None) (None) (None) (None)
Hour Lat. Load Lat. Load Lat. Load Lat. Load Lat. Load Lat. Load
1am 0 0 0 0 0 0
2am 0 0 0 0 0 0
3am 0 0 0 0 0 0
4am 0 0 0 0 0 0
5am 0 0 0 0 0 0
6am 0 0 0 0 0 0
7am 0 0 0 0 0 0
8am 0 0 0 0 0 0
9am 0 0 0 0 0 0
10am 0 0 0 0 0 0
11am 0 0 0 0 0 0
12pm 0 0 0 0 0 0
1pm 0 0 0 0 0 0
2pm 0 0 0 0 0 0
3pm 0 0 0 0 0 0
4pm 0 0 0 0 0 0
5pm 0 0 0 0 0 0
6pm 0 0 0 0 0 0
7pm 156,890 0 0 0 0 0
8pm 0 0 0 0 0 0
9pm 0 0 0 0 0 0
10pm 0 0 0 0 0 0
11pm 0 0 0 0 0 0
12am 0 0 0 0 0 0
Bldg.(G) August (None) (None) (None) (None) (None)
Hour Sen. Load Sen. Load Sen. Load Sen. Load Sen. Load Sen. Load
1am 0 0 0 0 0 0
2am 0 0 0 0 0 0

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 14

Building Load Profiles (cont'd)


Bldg.(G) August (None) (None) (None) (None) (None)
Hour Sen. Load Sen. Load Sen. Load Sen. Load Sen. Load Sen. Load
3am 0 0 0 0 0 0
4am 0 0 0 0 0 0
5am 0 0 0 0 0 0
6am 0 0 0 0 0 0
7am 0 0 0 0 0 0
8am 0 0 0 0 0 0
9am 0 0 0 0 0 0
10am 0 0 0 0 0 0
11am 0 0 0 0 0 0
12pm 0 0 0 0 0 0
1pm 0 0 0 0 0 0
2pm 0 0 0 0 0 0
3pm 0 0 0 0 0 0
4pm 0 0 0 0 0 0
5pm 0 0 0 0 0 0
6pm 0 0 0 0 0 0
7pm 332,526 0 0 0 0 0
8pm 0 0 0 0 0 0
9pm 0 0 0 0 0 0
10pm 0 0 0 0 0 0
11pm 0 0 0 0 0 0
12am 0 0 0 0 0 0
Bldg.(G) August (None) (None) (None) (None) (None)
Hour Lat. Load Lat. Load Lat. Load Lat. Load Lat. Load Lat. Load
1am 0 0 0 0 0 0
2am 0 0 0 0 0 0
3am 0 0 0 0 0 0
4am 0 0 0 0 0 0
5am 0 0 0 0 0 0
6am 0 0 0 0 0 0
7am 0 0 0 0 0 0
8am 0 0 0 0 0 0
9am 0 0 0 0 0 0
10am 0 0 0 0 0 0
11am 0 0 0 0 0 0
12pm 0 0 0 0 0 0
1pm 0 0 0 0 0 0
2pm 0 0 0 0 0 0
3pm 0 0 0 0 0 0
4pm 0 0 0 0 0 0
5pm 0 0 0 0 0 0
6pm 0 0 0 0 0 0
7pm 156,890 0 0 0 0 0
8pm 0 0 0 0 0 0
9pm 0 0 0 0 0 0
10pm 0 0 0 0 0 0
11pm 0 0 0 0 0 0
12am 0 0 0 0 0 0

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 15

Building Profile Graphs


Note: Only the peak hour and month were calculated because 'fast peak determination' was used.

Building Sensible Load


400,000

300,000

Watts 200,000 August

100,000

0
1am 2am 3am 4am 5am 6am 7am 8am 9am 10am 11am 12pm 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm 10pm 11pm 12am

Hours of Operation August

Building Latent Load


200,000

150,000

Watts 100,000 August

50,000

0
1am 2am 3am 4am 5am 6am 7am 8am 9am 10am 11am 12pm 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm 10pm 11pm 12am

Hours of Operation August

Building Sensible Load (G)


400,000

300,000

Watts 200,000 August

100,000

0
1am 2am 3am 4am 5am 6am 7am 8am 9am 10am 11am 12pm 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm 10pm 11pm 12am

Hours of Operation August

Building Latent Load (G)


200,000

150,000

Watts 100,000 August

50,000

0
1am 2am 3am 4am 5am 6am 7am 8am 9am 10am 11am 12pm 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm 10pm 11pm 12am

Hours of Operation August

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 16

Air System #1 (PU-FQU-1) Psychrometric Analysis


System Load Analysis Latent Grams Sensible Temp L/s
Leaving Coil Condition 9.232 13.000
Draw-Thru Fan 1,393 0.081 103
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 17,199 1.000 1,273
Zone Loads 4,260 0.103 146,402 8.512 10,833
Sensible Reserve 24,199 1.407 1,791
Zone Condition 4,260 9.335 189,193 24.000 13,999
Return Air Duct 17,199 1.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 4,667 L/s 152,630 3.688 126,134 7.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 156,890 13.022 332,526 32.000 13,999

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 1010.387)
TSH = PR x 1.23 x L/s x (DB entering - DB leaving)
TLH = PR x 2.96 x L/s x (g/kg entering - g/kg leaving)
GTH = PR x 1.20 x L/s x (Enthalpy entering - Enthalpy leaving)

TSH = 0.999 x 1.23 x 13,999 x( 32.000 - 13.000 )= 326,793 Watts


TLH = 0.999 x 2.96 x 13,999 x( 13.022 - 9.232 )= 156,892 Watts
----------
SUM = 483,684 Watts
GTH = 0.999 x 1.20 x 13,999 x( 65.589 - 36.464 )= 488,718 Watts
Total System Load = 489,417 Watts

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling L/s = 488,718 / ( 0.00 x 4,179 ) = 0.0 L/s
Heating L/s = 0 /( 0.00 x 4,179 ) = 0.0 L/s
Steam Req. = 0 / 970 = 0.00 kg./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 32.00 Dry bulb temperature: 24.00
Wet bulb temperature: 22.36
Relative humidity: 43.66
Enthalpy: 65.59 kJ/kg

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 13.00 Dry bulb temperature: 24.00
Wet bulb temperature: 12.89
Relative humidity: 98.82
Enthalpy: 36.46 kJ/kg

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 17

Air System #1 (PU-FQU-1) Psychrometric Analysis (G)


System Load Analysis Latent Grams Sensible Temp L/s
Leaving Coil Condition 9.232 13.000
Draw-Thru Fan 1,393 0.081 103
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 17,199 1.000 1,273
Zone Loads 4,260 0.103 146,402 8.512 10,833
Sensible Reserve 24,199 1.407 1,791
Zone Condition 4,260 9.335 189,193 24.000 13,999
Return Air Duct 17,199 1.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 4,667 L/s 152,630 3.688 126,134 7.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 156,890 13.022 332,526 32.000 13,999

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 1010.387)
TSH = PR x 1.23 x L/s x (DB entering - DB leaving)
TLH = PR x 2.96 x L/s x (g/kg entering - g/kg leaving)
GTH = PR x 1.20 x L/s x (Enthalpy entering - Enthalpy leaving)

TSH = 0.999 x 1.23 x 13,999 x( 32.000 - 13.000 )= 326,793 Watts


TLH = 0.999 x 2.96 x 13,999 x( 13.022 - 9.232 )= 156,892 Watts
----------
SUM = 483,684 Watts
GTH = 0.999 x 1.20 x 13,999 x( 65.589 - 36.464 )= 488,718 Watts
Total System Load = 489,417 Watts

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling L/s = 488,718 / ( 0.00 x 4,179 ) = 0.0 L/s
Heating L/s = 0 /( 0.00 x 4,179 ) = 0.0 L/s
Steam Req. = 0 / 970 = 0.00 kg./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 32.00 Dry bulb temperature: 24.00
Wet bulb temperature: 22.36
Relative humidity: 43.66
Enthalpy: 65.59 kJ/kg

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 13.00 Dry bulb temperature: 24.00
Wet bulb temperature: 12.89
Relative humidity: 98.82
Enthalpy: 36.46 kJ/kg

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 18

Air System #1 (PU-FQU-1) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 19

Air System #1 (PU-FQU-1) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 20

Building Pie Charts


Building peaks in August at 7pm.

Return Duct - 3.51%


Roof - 11.99% Supply Duct - 3.51%
Reserve Cap. - 4.94%
Draw-Thru Fan - 0.28%
Wall - 4.90%
Glass - 1.33%

Building
Lighting - 7.36%
Net
Gain Equipment - 2.45%
489,417
Watts People - 2.76%

Cool. Vent. - 56.96%

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 21

Building Pie Charts (G)


Building peaks in August at 7pm.

Return Duct - 3.51%


Roof - 11.99% Supply Duct - 3.51%
Reserve Cap. - 4.94%
Draw-Thru Fan - 0.28%
Wall - 4.90%
Glass - 1.33%

Building
Lighting - 7.36%
Net
Gain Equipment - 2.45%
489,417
Watts People - 2.76%

Cool. Vent. - 56.96%

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 22

Zone #1 Pie Charts


Zone #1 peaks in August at 7pm

People - 8.95%

Equipment - 7.96%

Roof - 38.94%
Zone
#1
Net
Gain
75,331 Lighting - 23.89%
Watts

Glass - 4.32%
Wall - 15.93%

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
MAPCO LLC Field Quarantine Unit
Abu Dhabi, Page 23

Zone #2 Pie Charts


Zone #2 peaks in August at 7pm

People - 8.95%

Equipment - 7.96%

Roof - 38.94%
Zone
#2
Net
Gain
75,331 Lighting - 23.89%
Watts

Glass - 4.32%
Wall - 15.93%

D:\Engr. A D N A N\FQU Field Quarantine Unit\Calculations\Field Quarantine Unit - G+3.CHV Monday, 23 March, 2020, 2:26 PM

You might also like