Safe Mock Test 1docx PDF
Safe Mock Test 1docx PDF
Systems
KPI
Decisions
Feedback
According to principle #6 - Visualize and Limit
Limit WIP reduce batch size,
size, and manage queue length -
the emphasis is to optimize the solution which decreases delays, reduce waste and increases
predictability of outcomes
Question 2
Flow
Feedback
Empirical process control, help us to solve complex problems. Empirical process control talks about
three main ideas of transparency, inspection, and adaptation.
Question 3
SAFe enterprise implements DevOps to break down silos and empower each Agile Release Train
(ART) and solution Train to deliver new features to their end users continuously. Over ti me, the
separation between the development and operations
ope rations is significantly reduced and trains operate with
an automated, continuous delivery pipeline.
Question 4
Question 5
Question 6
Question 7
Question 8
Question 9
Leader as conductor
Leader as servant
Correct answer
Leader as the developer of people
Feedback
Learning, growth, and mutual influence is supported by #3 - Develop People action. for more details,
please refer: http://www.scaledagileframework.com/lean-agile-leaders/
Question 10
When the team agreed on PI objectives? *
1/1
During Solution Planning
During PI Planning
Question 11
Question 12
What are the two problems that can be understood from the Program
Board? (Choose Two) *
0/1
Too many features are placed in a team’s swim lane with no strings
Too many dependencies leading to a single program milestone
Events for future PIs
Correct answer
Too many dependencies leading to a single program milestone
A significant dependency leading to a Feature
Feedback
Too many dependencies and significant dependency leading to a feature can be understood from
the Program board.
Reference: http://www.scaledagileframework.com/pi-planning/
Question 13
PO Sync
Test First
Feedback
In case features shows separate feature branches, then program is not ready for system demo.
Continuous Integration helps to ready for deployment
d eployment and release. It is the process of taking features
from the Program Backlog and developing testing, integrating, and validating them in a staging
environment.
Question 14
A system is observ
observing
ing faster and lower variability with the small batch
size. Then which two statements are true about batch size? (Choose
Two) *
0/1
Co-Location enables
enables small batch size
Batch Size cannot influence the behaviour
Good infrastructure enables large batches
Low utilization increases variability
Correct answer
Co-Location enables
enables small batch size
Severe project slippage is the most likely result of large batches.
Feedback
Small Batch size goes through the system faster, and with less variability, which fosters faster
learning. The faster speed is obvious;
o bvious; the variability increases because of the a ccumulated variability
of the items in the b atch.
The economically optimal batch size is dependent upon both the holding cost (the cost for delaying
feedback and value)and the transaction cost (the cost of implementing and testing and
an d the batch)
'The Co-Location helps in getting faster feedback (decreases holding cost), and the batches are
tested and implemented fast (decreasing transaction cost)
http://www.scaledagileframework.com/visualize-and-limit-wip-reduce-batch-sizes-and-manage-
queue-lengths/
Question 15
Question 16
Cross functional team work together for the common goal and they can collectively define, build,
buil d, and
test a feature or component. The communication is the key to deliver the value.
Question 17
Feedback
Enterprise Agility aligns the organization usi ng a set of lightweight
ligh tweight practices. By doing that, the
organization as a whole can adapt quickly as the market changes.
Question 18
Which three types of decisions should remain centralized even in a
decentralized decision-making
decision-making environment? (Choose Three) *
0/1
Frequent and common decisions
Infrequent decisions
Decisions with significant economies of scale
Correct answer
Long lasting decisions
Infrequent decisions
Decisions with significant economies of scale
Feedback
According to the principle #9 - delivering value in the shortest sustainable lead time requires
requires
decentralized decision making. Any decisions that must be escalated to higher levels of authority
introduces a delay in delivery. Also, escalated decisions can decrease decision fidelity due to the
lack of local context, plus changes to fact patterns that occur during the waiting period.
However, this is not to say, that all d ecisions should be decentralized. Some decisions are strategic,
have far reaching impact and are largely outside of the purview of the teams. Normally strategic
decisions are centralized.
Question 19
Question 20
Which statement is true about program events? *
1/1
Team events run inside the Program events, and the Program events create a
closed loop system
The inspect and Adapt is the only Program event required to create a closed
loop system
The Daily Stand-Up is a Program event that requires the Scrum of Scrums
and Program Owner Sync involvement in the closed loop system
Program events run inside the Team events, and the team events create a
closed loop system
Feedback
When it comes to the execution, a sequence of program events creates a closed-loop
closed-loo p system to
"keep the train on the tracks"
Question 21
Feedback
Agile Manifesto has following four values:
values:
• Individuals and Interactions Over Processes and Tools
• Working Software Over Comprehensive Documentation
• Customer Collaboration Over Contract Negotiation
• Responding to Change Over Following a Plan
Question 22