“Memorandum containing inventory of Road Structures in connection with Up-gradation of
‘Salaikhurd-Nawegaon-Tirora, From Existing Km 120+100 (Salaikhurd) To Km 163+200
{(Tirora) [Design Km. 44.000 to Km. 87.000] Excluding 0.80 Km. Length From Km. 58+700 To
Km, 594500 (ROB At Tumsar) (42.200 Km) of NH-753 To Two Lane With Paved Shoulder
configuration in the state of Maharashtra,
Job No.
Referance :
NH-753-MAH-2017-18-1201
41] Chief Engineer (Zone IV ) Ministry of Road Transport & Highways , Govt of India,
‘Transport Bhavan,1 Parliament Street , New Delhi Letter No. RW-12014/126/2017-
‘MAH Dated 29th March 2018
2] Executive Engineer, National Highway Division, Nagpur LetterNo.
NH/Tender/2018/1694 Dated 09.05.2018
The Concession Agreement of the above mentioned ' Project Work"
‘was signed in between Chief Engineer, National Highway, Navi Mumbai and M/S.
Barbrik Project Limited, A-24, Ashoka Millenium,Ring Road No.1 Near Rajendra
Nagar Raipur-492001(CG).
As such, M/S. Barbrik Project Limited, A-24, Ashoka Millenium,Ring
Road No.1 Near Rajendra Nagar Raipur-492001(CG)., was intimated vide letter
under referance at Sr, No. 2 for the ‘joint inspection of the streatch on 16th May
2018 with regards to handing over of the section for EPC Mode Execution.’
Accordingly vide Article 8 of "Consession Agreement’, joint inspection
of rom existing km 120+100 (Salaikhurd) to Km 162+200 [Design km.44.000 to km.
87.000} (42.000 km) of NH-753 is carried out today i.e. on 16th May 2018 by
Natinal Highway, Nagpur's officials and authorized representative of M/S. Barbrik
Project Limited, Raipur
The said section of National Highway i.e. Saleikhurd-Nawegaon-Tirora,
From Existing Km 120+100 (Salaikhurd) To Km 163+200 (Tirora) [Design Km.
44,000 to Km. 87.000} Excluding 0.80 Km. Length From Km. 58+700 To Km.
59+500 (ROB At Tumsar) (42.200 Km) of NH-753 To Two Lane With Paved
‘Shoulder configuration in the state of Maharashtra is hereby handed over to M/S.
Barbrik Project Limited, Raipur, on 16th May 2018 for ‘EPC Mode Construction
Purpose.’
The detailed inventry of the National Highway Assets is appended herewith.
sen Handed OVE amen
~Taken Over —-—
ye : g Musode \
(N. T. Labhane) 8. Sakharwade) Be ob \3
Assistant Engineer GR. | Executive Engineer
National Highway Sub Division _Nattional Highway Division —_ M/s. Barbrik Project Limited
22 Bhandara Nagpur RaipurExisting Culverts Details of (PKG -2
Site includes the following Culverts
No. x Span/
Opening with
[Span Length (m)|
Existing
Chainage (Km)
‘Type of Culvert
(Slab/Box)
[es |
[waver | sitbcuver [bas [toa |
[weegor [sib Cutven_[ 39s |
[4
La
1534640, Shbcuver | 50 |
EP Culverts: - 120 Nos. oe
No. x Span /
+ Sit eaieel | eoeate wan
Chainage Structure
With Span | Clear Width _[Overalt with
Pipe Culvert
Pipe Culvert 1x12
1x0.9 10.2
[of 07
S
g1334307 Culvert 143
a CT ET
a I |
eC
a |
ia
[rises [Pipe Catver [nos sa a
[oases | Ppecuten [is | 0 | 9s |
[oissn [Pecan [nos [990s
[ora | Pipecates [nos | or i07
a
a
[ripe caver [wo | 103 |
[Cre cuver [no |
[ripe caver [09 | 7
Pipe Culvert 1x0.7
Pipe Culver [1x06 |
.
[sa | tatines [Pipe Gunes [x04
[so [ 1481230 [Pipe Cutven_[noas [92
[si [ 1481330 | Pipe Culver [xa [io
[o. | _1veva27 [Pipe culver [ix0as_ [tor 07
[-o._| 1ersa7__|_Pipocuiver_ | xoas [io [tos
[os. [1487600 [Pipe cutver_ | ixoas [toa
os. | sero | Pipscuver_| ons [tos Tt
[os] users | Pipecuven | xs [oz [08
[aes | PipeGuiver_[ boas [es ea
6.1494575.
[tsosa37 [Pipe Cutvers [ix075 [ion
70. 150+333 a |
1504538 Pipe Culvert 1X06
iss [is |
| 74 : P|
[-76_|_1517553__[ Pipe Cutvers | ixos [2 tos
[cr [isie7s2__ | Pipecutverr _[xoas toto
[7 [1511920 [Pipe Cuver_[~hoas [os ta
[7 [ 152120 | PipeCutven_| oe [oz [08
Pips Culvert | ings [99 105
[ar [__1521557_ | Pipe Cues _[ixos [9s toa
[w. [1528613 | PipeCawer_|ixog [02 ios
[x3] 1524674 | PipeCunerr | txoas [ior 07
[ex | 1521428 [Pipe Culver [104s [oan
[s5._| 152978 | Pipecuver | x9 [tee a |
[a6 | 153+082__ | PipeCuver_ [wap [oe 2
[87] 153208 | Pipecuver [3x09 [03 as
[se] 1531268 | PipeCulven [toasts Ys.
[e._[ 153495 | Pipe Cuiver_[axog_ [io ios
[90 [153492 [Pipe Cuiver [075 [02 os
[9 [153997 _[ Pinecuver_[~txo7s [gas
a A
[93._ [1541870 | Pipe Cuver [075 [i006
[on [154897 | Pipe Cutverr_[ xo [99 as
[95 | _iseeiae [Pipe Cutver [xo [or ior
[96 [16297 [Pipe Gutver_[ixo7s [as Ys
[97 | _1561685 [Pipe Cuiven [07s [asa fas
[98] 157281 | PipeCunen [a9 Tos Yt
[99 | _157876 | Pipecuver [xg [too
[-ioo._ [158-035 [_ PineCuiver | ixiz [oz tos
[ or. [ 1585085 [Pipe Cutver | 2xra_ [e208
[os os
a BE)
[-_159-700__[ Pipe Culver [ti [sa Ps
[—1or260 [Pipe Cuver_| 07s [es 72
158+455 Pipe Culvert110.
[in| es |
[—iaorese [Pe caver | ;
es Lo
[ie [tera | ine cuven_[ xo | 203 [209
[ais —16rs320 [Pipe Gover_[ 07s [15s TS
Lie [erase | Pipe Cover [boo [| 53] 59 |
[oi7_|__1623247 [Pipe Culvert [130.75
[iis[ 16395 [Pipe Culver | 0.45 [| 9s toa
[19._[1624875 J Pipe Culvert [—ix075_ [| toa
[a0 [1632025 [Pipe Culvet_| 1x09 Ps ss
Handed Over —-
(N.T. Labhane) (SS. Sakhanvade) bl (3
Assistant Engineer GR. | Executive Engineer
N. H. Sub Division National Highway Division Ms, Barbrik Project Limited
—at- Bhandara Nagpur RaipurExisting Major Bridges Details of (PKG -2)
Site includes the following Major Bridges
‘Type of Structure
‘Width (m)
Ane py ‘Wain’
138+900 weston] ce | as | » | ganga
wr | iver
187+570 - Bada
a =a aes ar ane
No.of
Spans
with
Span
Vast [carmen |
Existing
|
Taken Over
ee 2 ‘Sakharwade) ) 6o| 12
estan Engineer GR. | Executive Engineer
N. H, Sub Division National Highway Division Ms. Barbrik Project Limited
= Bhandara Nagpur RaipurExisting Minor Bridges Details of ( PKG - 2
Site includes the following Minor Bridges
‘Not
‘Not
le
‘Not
lat
Visible
RCC Wall
RCC Wall | RCC Soli
slab
RCC Wall [RCC Solid|
yp b
RCC Wall [RCC
type
RCC Wall | RCC
p Gi
(N.T. Lat
Assistant Engineer GR. |
NN, H. Sub Division
Bhandara_
ane)
(8. S. Sakharwade)
Executive Engineer
National Highway Division
Nagpur
‘Width (m)
Clear Width
8.4m(9.1mSkew)
10.40 (Normal)
s
Over all Width
18
z
‘Taken Over ——-
i
AGN
M/s. Barbrik Project Limited
RaipurStatement showing Area Available for the project with details
of ROW & TCS on the date of handing over of the section to
EPC Contractor i.e Dt.
Sr [From | To [Length [Width (m) Land | Land | Land to be
No.| Km } Km | (Km) [Existing | Proposed | Available ) Required | acquired
Row | Row (additional)
if/2 [3 a 3 6 7 8 9
| 4000 j 45190 | 1190 8 23| 27370) 27370 0
| #3600 | 46250 | 650 23 23) 44950] 14950 0
| 2470 50750) 4280 B 2 980, 98440 0
1 | 58310 | 53650 | 2540 2 24] seréo] 56160 0
| 23900 | 54000 | 100 24 2a} 2400, 2400 0
| 35080 | 5e820 [1770 cry 2a] 42080 | 42480) 0
7 | 57030 | 57060 ] 30 m4 74 720 720 0
| 57700 | Sei60 | 460 Fy 2a a1080 [11040 0
9 | 58600 | 58720] 120 a 24| 2880/2880 0
yo | 39630 | 60100 | ~ 3070 wa 2a 25680 | 25680 °
14 | 60500 [61390] 680 24 24] 16560 16860 0
4p | 01820 | 6a610 | 7790 Fry 24] 66960 | 66960 0
13 | 68800 | 65610] 810 a 24) 19aa0 [19440 0
14 | 69800 [ 68600 | 2800 2 24] 6720067200 0
a5 | 08080 | 69300] 250 24 | 2a} 6000{ 6000 0
ag | 70200 | 73290} 3090 m4 2a) 74160) 74160 0
7 | 73540 | 74240 | 600 Ey zat 14400 | 14400 0
ag | 74750 | 74860 | 310 Py 2a| 2640; 2640 0
39 | 78800 | 79200 | 400 2 24] 9600; 9600 0
ao | 7376 | 80300 | 540 26 26] aaa [14040 0
9g | 80880 | 83000 | 320 26 26; 8320[ «8320 0
i200 | 85450 | 4250 2B 23) 97750} 9750 0
16 2] 6560) 9430 2870
[46 2/3520; 5060 1540
10 24] 5600] 13440 7840
8 24) 4500 6000 1500
atohgzoe \Sr. | From] To ]Length | width (m) Land | Land | Land tobe
No.| Km | Km | (Km) [xisting | Proposed | Available | Required | acquired
Row | Row (additionan
TL? 73s [4 5 6 7 8 9
«| 54000 | $5050 | 1050 2 24 | 23400) 25200 7100
«g | 26820) 57030 | 210 3 zm] i890|~ 5040 3150
| 57060 | 57700 | 640 8 24| 11520) 18360 3840
| 58160 $8600} 440 7 24) 7480] 10560 3080
og | 38720 | 59030) 310 5 24/4650] 7440 2790
130 | 09100 | 60500 | 400 31 43] 12400| 17200 4800
13 | 61490 | 61820 | 680 i7 2 107i | 14490 3780
19 | 64810 | 68800 | 150 R 2a| 2280] 4560 2380
13 | 05510 | 65800 | 190 16 2a) -3040|~ 4560 1520
4a | 08500 | 69050 | 450 5 | 6750) 10800 4050
45 | 09300 | 70200 | 900 20 24] 18000 [21600 3600
ae | 22? | 7 | 250 20 24] 5000; 6000 1000
1p | HO | 74750 | 840 a7 2a{ 10370 14640 4270
ag | 7860 | 77050] 2190 20 24) 43800” 52560 8760
ag | 72250 | 76800 | 450 2B 26] 1038043700 1350
a0 | 79200 | 79400 | 200 5 26| 3000) 5200 2200
aa | 72400 | 78760) 360 20 23/7200 8280 1080
ap | 80800 | 80680 | 380 8 26) 68009880 3080
93 | 81000 | 81200 | 200 i 26 | 2200/5200 3000
9g | 85450 | 85920 470 FT) %| a700|[ _10810 6110
Percentage of Right of way handed over on appointed date = 91.10%
~ ~ Handed Over neem
(N.T. tabhane) {S.S. Sakharwade) M/s. Barbrik Projéct Limited
Assistant EngineerGR.! _Executive Engineer Ralpur
IN. H, Sub Division National Highway Division
eas Bhandara Nagpur
Ape doe 7‘Memorandum containing inventory of Road Structures in connection with Up-
gradation of Salalkhurd-Nawegaon-Tirora, From Existing Km 120+100 (Salaikhurd)
Jo Km 1634200 (Tirora) [Design Km. 44,000 to Km. 87,000] Excluding 0.80 Km.
Length From Km. 68+700 To Km. 89+500 (ROB At Tumsar) (42.200 Km) of NH-753,
To Two Lane With Paved Shoulder configuration In the state of Maharashtra.
[1] As perschedule A the land in realingment portion will be handed over within 365
days from the date of appointed date.
[2] In the above section the total number of trees coming are 2557 nos.
{3} In the above section the electric poles 440 nos are need to be shifted.
[a] In the above section the water pipe line of Maharashtra Jivan Pradhikeran
Department & Zilla Parisad Rular Water supply are need to be shifted.
Handed Over -——--—--- Taken Over ~~
Wt — Bitiwade. 4 5
(NT. Labhane) (SS. ‘Sakharwade)
Assistant Engineer GR. \ Executive Engineer ob \ \
N. H. Sub Division National Highway Division Mis. Barbrik Project Limited
Bhandara Nagpur Raipur