You are on page 1of 10
“Memorandum containing inventory of Road Structures in connection with Up-gradation of ‘Salaikhurd-Nawegaon-Tirora, From Existing Km 120+100 (Salaikhurd) To Km 163+200 {(Tirora) [Design Km. 44.000 to Km. 87.000] Excluding 0.80 Km. Length From Km. 58+700 To Km, 594500 (ROB At Tumsar) (42.200 Km) of NH-753 To Two Lane With Paved Shoulder configuration in the state of Maharashtra, Job No. Referance : NH-753-MAH-2017-18-1201 41] Chief Engineer (Zone IV ) Ministry of Road Transport & Highways , Govt of India, ‘Transport Bhavan,1 Parliament Street , New Delhi Letter No. RW-12014/126/2017- ‘MAH Dated 29th March 2018 2] Executive Engineer, National Highway Division, Nagpur LetterNo. NH/Tender/2018/1694 Dated 09.05.2018 The Concession Agreement of the above mentioned ' Project Work" ‘was signed in between Chief Engineer, National Highway, Navi Mumbai and M/S. Barbrik Project Limited, A-24, Ashoka Millenium,Ring Road No.1 Near Rajendra Nagar Raipur-492001(CG). As such, M/S. Barbrik Project Limited, A-24, Ashoka Millenium,Ring Road No.1 Near Rajendra Nagar Raipur-492001(CG)., was intimated vide letter under referance at Sr, No. 2 for the ‘joint inspection of the streatch on 16th May 2018 with regards to handing over of the section for EPC Mode Execution.’ Accordingly vide Article 8 of "Consession Agreement’, joint inspection of rom existing km 120+100 (Salaikhurd) to Km 162+200 [Design km.44.000 to km. 87.000} (42.000 km) of NH-753 is carried out today i.e. on 16th May 2018 by Natinal Highway, Nagpur's officials and authorized representative of M/S. Barbrik Project Limited, Raipur The said section of National Highway i.e. Saleikhurd-Nawegaon-Tirora, From Existing Km 120+100 (Salaikhurd) To Km 163+200 (Tirora) [Design Km. 44,000 to Km. 87.000} Excluding 0.80 Km. Length From Km. 58+700 To Km. 59+500 (ROB At Tumsar) (42.200 Km) of NH-753 To Two Lane With Paved ‘Shoulder configuration in the state of Maharashtra is hereby handed over to M/S. Barbrik Project Limited, Raipur, on 16th May 2018 for ‘EPC Mode Construction Purpose.’ The detailed inventry of the National Highway Assets is appended herewith. sen Handed OVE amen ~Taken Over —-— ye : g Musode \ (N. T. Labhane) 8. Sakharwade) Be ob \3 Assistant Engineer GR. | Executive Engineer National Highway Sub Division _Nattional Highway Division —_ M/s. Barbrik Project Limited 22 Bhandara Nagpur Raipur Existing Culverts Details of (PKG -2 Site includes the following Culverts No. x Span/ Opening with [Span Length (m)| Existing Chainage (Km) ‘Type of Culvert (Slab/Box) [es | [waver | sitbcuver [bas [toa | [weegor [sib Cutven_[ 39s | [4 La 1534640, Shbcuver | 50 | EP Culverts: - 120 Nos. oe No. x Span / + Sit eaieel | eoeate wan Chainage Structure With Span | Clear Width _[Overalt with Pipe Culvert Pipe Culvert 1x12 1x0.9 10.2 [of 07 S g 1334307 Culvert 143 a CT ET a I | eC a | ia [rises [Pipe Catver [nos sa a [oases | Ppecuten [is | 0 | 9s | [oissn [Pecan [nos [990s [ora | Pipecates [nos | or i07 a a [ripe caver [wo | 103 | [Cre cuver [no | [ripe caver [09 | 7 Pipe Culvert 1x0.7 Pipe Culver [1x06 | . [sa | tatines [Pipe Gunes [x04 [so [ 1481230 [Pipe Cutven_[noas [92 [si [ 1481330 | Pipe Culver [xa [io [o. | _1veva27 [Pipe culver [ix0as_ [tor 07 [-o._| 1ersa7__|_Pipocuiver_ | xoas [io [tos [os. [1487600 [Pipe cutver_ | ixoas [toa os. | sero | Pipscuver_| ons [tos Tt [os] users | Pipecuven | xs [oz [08 [aes | PipeGuiver_[ boas [es ea 6. 1494575. [tsosa37 [Pipe Cutvers [ix075 [ion 70. 150+333 a | 1504538 Pipe Culvert 1X06 iss [is | | 74 : P| [-76_|_1517553__[ Pipe Cutvers | ixos [2 tos [cr [isie7s2__ | Pipecutverr _[xoas toto [7 [1511920 [Pipe Cuver_[~hoas [os ta [7 [ 152120 | PipeCutven_| oe [oz [08 Pips Culvert | ings [99 105 [ar [__1521557_ | Pipe Cues _[ixos [9s toa [w. [1528613 | PipeCawer_|ixog [02 ios [x3] 1524674 | PipeCunerr | txoas [ior 07 [ex | 1521428 [Pipe Culver [104s [oan [s5._| 152978 | Pipecuver | x9 [tee a | [a6 | 153+082__ | PipeCuver_ [wap [oe 2 [87] 153208 | Pipecuver [3x09 [03 as [se] 1531268 | PipeCulven [toasts Ys. [e._[ 153495 | Pipe Cuiver_[axog_ [io ios [90 [153492 [Pipe Cuiver [075 [02 os [9 [153997 _[ Pinecuver_[~txo7s [gas a A [93._ [1541870 | Pipe Cuver [075 [i006 [on [154897 | Pipe Cutverr_[ xo [99 as [95 | _iseeiae [Pipe Cutver [xo [or ior [96 [16297 [Pipe Gutver_[ixo7s [as Ys [97 | _1561685 [Pipe Cuiven [07s [asa fas [98] 157281 | PipeCunen [a9 Tos Yt [99 | _157876 | Pipecuver [xg [too [-ioo._ [158-035 [_ PineCuiver | ixiz [oz tos [ or. [ 1585085 [Pipe Cutver | 2xra_ [e208 [os os a BE) [-_159-700__[ Pipe Culver [ti [sa Ps [—1or260 [Pipe Cuver_| 07s [es 72 158+455 Pipe Culvert 110. [in| es | [—iaorese [Pe caver | ; es Lo [ie [tera | ine cuven_[ xo | 203 [209 [ais —16rs320 [Pipe Gover_[ 07s [15s TS Lie [erase | Pipe Cover [boo [| 53] 59 | [oi7_|__1623247 [Pipe Culvert [130.75 [iis[ 16395 [Pipe Culver | 0.45 [| 9s toa [19._[1624875 J Pipe Culvert [—ix075_ [| toa [a0 [1632025 [Pipe Culvet_| 1x09 Ps ss Handed Over —- (N.T. Labhane) (SS. Sakhanvade) bl (3 Assistant Engineer GR. | Executive Engineer N. H. Sub Division National Highway Division Ms, Barbrik Project Limited —at- Bhandara Nagpur Raipur Existing Major Bridges Details of (PKG -2) Site includes the following Major Bridges ‘Type of Structure ‘Width (m) Ane py ‘Wain’ 138+900 weston] ce | as | » | ganga wr | iver 187+570 - Bada a =a aes ar ane No.of Spans with Span Vast [carmen | Existing | Taken Over ee 2 ‘Sakharwade) ) 6o| 12 estan Engineer GR. | Executive Engineer N. H, Sub Division National Highway Division Ms. Barbrik Project Limited = Bhandara Nagpur Raipur Existing Minor Bridges Details of ( PKG - 2 Site includes the following Minor Bridges ‘Not ‘Not le ‘Not lat Visible RCC Wall RCC Wall | RCC Soli slab RCC Wall [RCC Solid| yp b RCC Wall [RCC type RCC Wall | RCC p Gi (N.T. Lat Assistant Engineer GR. | NN, H. Sub Division Bhandara_ ane) (8. S. Sakharwade) Executive Engineer National Highway Division Nagpur ‘Width (m) Clear Width 8.4m(9.1mSkew) 10.40 (Normal) s Over all Width 18 z ‘Taken Over ——- i AGN M/s. Barbrik Project Limited Raipur Statement showing Area Available for the project with details of ROW & TCS on the date of handing over of the section to EPC Contractor i.e Dt. Sr [From | To [Length [Width (m) Land | Land | Land to be No.| Km } Km | (Km) [Existing | Proposed | Available ) Required | acquired Row | Row (additional) if/2 [3 a 3 6 7 8 9 | 4000 j 45190 | 1190 8 23| 27370) 27370 0 | #3600 | 46250 | 650 23 23) 44950] 14950 0 | 2470 50750) 4280 B 2 980, 98440 0 1 | 58310 | 53650 | 2540 2 24] seréo] 56160 0 | 23900 | 54000 | 100 24 2a} 2400, 2400 0 | 35080 | 5e820 [1770 cry 2a] 42080 | 42480) 0 7 | 57030 | 57060 ] 30 m4 74 720 720 0 | 57700 | Sei60 | 460 Fy 2a a1080 [11040 0 9 | 58600 | 58720] 120 a 24| 2880/2880 0 yo | 39630 | 60100 | ~ 3070 wa 2a 25680 | 25680 ° 14 | 60500 [61390] 680 24 24] 16560 16860 0 4p | 01820 | 6a610 | 7790 Fry 24] 66960 | 66960 0 13 | 68800 | 65610] 810 a 24) 19aa0 [19440 0 14 | 69800 [ 68600 | 2800 2 24] 6720067200 0 a5 | 08080 | 69300] 250 24 | 2a} 6000{ 6000 0 ag | 70200 | 73290} 3090 m4 2a) 74160) 74160 0 7 | 73540 | 74240 | 600 Ey zat 14400 | 14400 0 ag | 74750 | 74860 | 310 Py 2a| 2640; 2640 0 39 | 78800 | 79200 | 400 2 24] 9600; 9600 0 ao | 7376 | 80300 | 540 26 26] aaa [14040 0 9g | 80880 | 83000 | 320 26 26; 8320[ «8320 0 i200 | 85450 | 4250 2B 23) 97750} 9750 0 16 2] 6560) 9430 2870 [46 2/3520; 5060 1540 10 24] 5600] 13440 7840 8 24) 4500 6000 1500 atohgzoe \ Sr. | From] To ]Length | width (m) Land | Land | Land tobe No.| Km | Km | (Km) [xisting | Proposed | Available | Required | acquired Row | Row (additionan TL? 73s [4 5 6 7 8 9 «| 54000 | $5050 | 1050 2 24 | 23400) 25200 7100 «g | 26820) 57030 | 210 3 zm] i890|~ 5040 3150 | 57060 | 57700 | 640 8 24| 11520) 18360 3840 | 58160 $8600} 440 7 24) 7480] 10560 3080 og | 38720 | 59030) 310 5 24/4650] 7440 2790 130 | 09100 | 60500 | 400 31 43] 12400| 17200 4800 13 | 61490 | 61820 | 680 i7 2 107i | 14490 3780 19 | 64810 | 68800 | 150 R 2a| 2280] 4560 2380 13 | 05510 | 65800 | 190 16 2a) -3040|~ 4560 1520 4a | 08500 | 69050 | 450 5 | 6750) 10800 4050 45 | 09300 | 70200 | 900 20 24] 18000 [21600 3600 ae | 22? | 7 | 250 20 24] 5000; 6000 1000 1p | HO | 74750 | 840 a7 2a{ 10370 14640 4270 ag | 7860 | 77050] 2190 20 24) 43800” 52560 8760 ag | 72250 | 76800 | 450 2B 26] 1038043700 1350 a0 | 79200 | 79400 | 200 5 26| 3000) 5200 2200 aa | 72400 | 78760) 360 20 23/7200 8280 1080 ap | 80800 | 80680 | 380 8 26) 68009880 3080 93 | 81000 | 81200 | 200 i 26 | 2200/5200 3000 9g | 85450 | 85920 470 FT) %| a700|[ _10810 6110 Percentage of Right of way handed over on appointed date = 91.10% ~ ~ Handed Over neem (N.T. tabhane) {S.S. Sakharwade) M/s. Barbrik Projéct Limited Assistant EngineerGR.! _Executive Engineer Ralpur IN. H, Sub Division National Highway Division eas Bhandara Nagpur Ape doe 7 ‘Memorandum containing inventory of Road Structures in connection with Up- gradation of Salalkhurd-Nawegaon-Tirora, From Existing Km 120+100 (Salaikhurd) Jo Km 1634200 (Tirora) [Design Km. 44,000 to Km. 87,000] Excluding 0.80 Km. Length From Km. 68+700 To Km. 89+500 (ROB At Tumsar) (42.200 Km) of NH-753, To Two Lane With Paved Shoulder configuration In the state of Maharashtra. [1] As perschedule A the land in realingment portion will be handed over within 365 days from the date of appointed date. [2] In the above section the total number of trees coming are 2557 nos. {3} In the above section the electric poles 440 nos are need to be shifted. [a] In the above section the water pipe line of Maharashtra Jivan Pradhikeran Department & Zilla Parisad Rular Water supply are need to be shifted. Handed Over -——--—--- Taken Over ~~ Wt — Bitiwade. 4 5 (NT. Labhane) (SS. ‘Sakharwade) Assistant Engineer GR. \ Executive Engineer ob \ \ N. H. Sub Division National Highway Division Mis. Barbrik Project Limited Bhandara Nagpur Raipur

You might also like