You are on page 1of 3

PT.

TAKENAKA INDONESIA MATERIAL APPROVAL & EQUIPMENT SCHEDULE


AXIA 3 SA PROJECT & COMMERCIAL DATA
A NORTH TOWER
SPEC/ MATERIAL LOCATION SUPPLIER PRODUCT ORIGIN DELIVERY REV DESCRIPTION PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL
No. ITEM TYPE / CATEGORY
SUBMIT APPROVED ORDER PO ETA ONSITE

MECHANICAL EQUIPMENT

1 AIR CONDITIONING SYSTEM


a Air Conditioning Unit AC Wall Mounted Type Inverter Thoshiba / Carrier 2nd. ~ 9th. Fl. PT. Berca Carrier Indonesia Thailand Japan 3,5 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 29-Aug-2020 10-Sep-2020
b Air Conditioning Unit VRV System Thoshiba / Carrier Public 1st. Fl. PT. Berca Carrier Indonesia Thailand Japan 3,5 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 29-Aug-2020 10-Sep-2020
c Air Conditioning Unit All Fresh VRV System Toshiba / Carrier Public 1st. Fl. PT. Berca Carrier Indonesia Thailand Japan 3,5 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 29-Aug-2020 10-Sep-2020
d Cooper pipe Refrigerant Pipe Mueller General PT. Adimas Isolasitama Australia Australia 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
e Pipe Insulation Tube Insulation 13 ~ 20mm thk Insuflex General PT. Adimas Isolasitama Thailand Thailand 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
f PVC pipe SNI (10kg/cm2) - AW Pralon General PT. Laksamana Karya Adiyasa Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
g Galvanize Steel Sheet Thicness 0.5 ~ 1.0 mm Lokfom General PT. Adimas Solasitama Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
h Duct Insulation Glass Wool, Density 24 ~ 32Kg/M3 ABB Wool General PT. Adimas Solasitama Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020

2 VENTILATING SYSTEM
a Wall Fan Wall Mounted Type Panasonic General PT. Aneka Bina Citra Indonesia Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Ceiling Fan Ceiling Cassette Type Panasonic General PT. Aneka Bina Citra Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
c Range Hood Wall Mounted Type MODENA General PT. INDOMO MULIA Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
d Galvanize Steel Sheet Thickness 0,5 ~ 1mm Lokfom General PT. Adimas Solasitama Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
e PVC pipe (5kg/cm2) - D Pralon General PT. Laksamana Karya Adiyasa Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
f Grille / Diffuser Custom, Aluminium Sheet, Naturally AMST General PT. Anugerah Multi Solusi Technic Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
g Vent Cap Custom, G.I. Sheet w/ Powder Coating AMST General PT. Anugerah Multi Solusi Technic Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
h Pop - up Fresh Air Wall Mounted Type Sylpha General PT. Ishiguro Indonesia Japan Japan 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020

3 WATER SUPPLY & DRAINAGE SYSTEM


a Pompa Unit Inline Multi Stage Grundfos Pump Room PT. Sahabat Mandiri Sejahtera Indonesia Italy 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
b Sand Filter Unit Mild Steel Cylinder Tank GLS Pump Room GLS Indonesia Indonesia 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
c Catridge Filter Unit SUS Cylinder Tank GLS Pump Room GLS USA USA 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
d Panel Tank FRP TANK Local Pump Room GLS Indonesia Indonesia 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
e HI - PVC Pipe JIS K 6742, HI-VP Class Kubota Chemix Main Line Normally Water System PT. Figo Teknik Japan Japan 3,5 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 17-Jun-2020 24-Jun-2020
f C - PVC Pipe ASTM F411, Schedule 40 Class Flow Guard Residence Line; Normally and Hot Water System PT. Senindo Karya Abadi USA USA 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
g PVC Pipe JIS 10K, VP Class Pralon Drainage System PT. Laksamana Karya Adiyasa Indonesia Indonesia 2 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-Apr-2020 30-May-2020
h Valves Bronze 150 PSI KITZ Underground PT. Sinar mas Sakti China China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
i Foot Valve SUS 304 ARITA Pump Room PT. Arita Prima Indonesia Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
j Pressure Reducting Valve Bronze 150 PSI Itap General PT. Aneka Bina Citra Italy Italy 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
k Water Meter SNI Certificate, 150 psi Class Lois Victor General PT. Figo Teknik China China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
l Floor Drain/ Clean out Bronze Plated w/ Chromium Batur General PT. Batur Artha Yulis Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
m Manhole Cover Medium and Haevy Cast Iron Batur General PT. Batur Artha Yulis Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 8-Jun-2020
n Mini Manhole PVC Manhole Kubota General PT. Figo Teknik Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
o C-Trap Transparant FRP material Kondo FRP General PT. Ishiguro Indonesia Japan Japan 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
p Water Heater Cap 100 L ARISTON/Rheem unit room PT. Global Bintang Sejahtera Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
q Water Tigh PAN FRP material Tech Notech General PT. Ishiguro Indonesia Japan Japan 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
r Sanitary Fixture Body and Fitting Toto General PT. Indokeramikatama Perkasa Indonesia Indonesia 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
s Sanitary Fixture Body and Fitting GROHE unit room PT. Indokeramikatama Perkasa Indonesia Indonesia 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
t Bath Tub Body and Fitting kohler unit room PT. Indokeramikatama Perkasa Indonesia Indonesia 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
u Sewage Treatment Plant FRP Tank, Aerob and Anaerob System Bio-home General PT. Alam Hijau Indonesia Indonesia 2 month 8-Jan-2020 8-Jan-2020 15-Jan-2020 14-Feb-2020 22-Jan-2020 30-Jan-2020 29-Feb-2020 30-Mar-2020

4 FIRE FIGHTING SYSTEM


a Main Hydrant Pump Horizontal Split Case Pump SPP Pump Room PT. Armeitsu USA USA 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
b Jockey Pump Inline Multi Stage Grunfos Pump Room PT. Armeitsu Italy Italy 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
c Sprinkler Head Standard Response, Pendent Type Tyco General PT. United Flow Control USA USA 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
d Hydrant Box, Pillar, Siamese Box Type B 750 x 180 x 1,250 x 1.2t OZEKI General Centra Bina Citra mandiri Indonesia China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
e Fire Extinguiser Portable Powder, A.B.C type 3.5 Kg VIKING General Centra Bina Citra mandiri Indonesia China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
f Black Steel Pipe Sch.40 - E.R.W ASTM A 53 Grade A. SPINDO General PT. Mentari Suplindo Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
g Valves Cast Iron 150 ~ 300 PSI KITZ General PT. Sinar mas Sakti China China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
h Foot Valve SUS 304 ARITA Pump Room PT. Arita Prima Indonesia Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
i Pressure Reducting Valve Ductile Iron 150 ~ 300 PSI Klasse General PT. Figo Teknik China China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020

5 SWIMMING POOL SYSTEM


a Sand Filter Swimming Pool Hayward Pump Room PT. Aneka Bina Citra USA USA 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Pump Inline Multi Stage Grundfos Pump Room PT. Sahabat Mandiri Sejahtera Indonesia Italy 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
c Plate Heat Exchanger Cap. 100 ~ 200 Liter Themowave Pump Room Rekuvindo Italy Italy 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
d Inlet Fitting FRP Material Hayward General PT. Aneka Bina Citra USA USA 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
e PVC Pipe JIS 10K, VP Class Pralon Normally Water System PT. Laksamana Karya Adiyasa Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
f C - PVC Pipe ASTM F411, Schedule 40 Class Flow Guard Hot Water System PT. Senindo Karya Abadi USA USA 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
g Valves Cast Iron 150 ~ 300 PSI KITZ General PT. Sinar mas Sakti China China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
h BTU Meter Flange 150 psi Class Danfoss General PT. Niaga Berkat Lautan Denmark Denmark 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020

6 ELECTRICAL EQUIPMENT

SUBSTATION SYSTEM
a Transformer Oil Type, Indoor (1250 kVA) Trafoindo Substation PT Tafoindo Prima Perkasa Indonesia Indonesia 3,5 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 17-Jun-2020 24-Jun-2020
b MV Panel Medium Voltage Mitraida Substation PT Mitraida Indonesia Indonesia 3,5 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 17-Jun-2020 24-Jun-2020
c MV Protection VCB Protection Schneider Substation PT Mitraida Indonesia Indonesia 3,5 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 17-Jun-2020 24-Jun-2020
d Local Panel Low Voltage Mitraida Substation PT Mitraida Indonesia Indonesia 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
e LV Protection MCCB,ACB Terasaki Substation PT Mitraida Indonesia Indonesia 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
f Cable Rack SLW Onaji General PT Onaji Triindo Indonesia Indonesia 1 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
g Cable N2XSEBY, N2XSY, NYY, NYA 4 besar General PT Jawa Electric Indonesia Indonesia 2 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020

7 GENERATOR SYSTEM
a Generator Silent Type ( 1200 kVA ) Mitsubishi Genarator room PT Berkat Manunggal Energi Indonesia Indonesia 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
b Local Panel ACB/ MCCB Mitraida Generator room PT Mitraida Indonesia Indonesia 3 month 17-Feb-2020 24-Feb-2020 2-Mar-2020 9-Mar-2020 30-May-2020 10-Jun-2020
c Cable NYY, NYA 4 besar General PT Jawa Electric Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020
d Cable Rack SLW Onaji General PT Onaji Triindo Indonesia Indonesia 1 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 26-Mar-2020 3-Apr-2020

8 MAIN FEEDER SYSTEM


a Local Panel ACB/ MCCB Mitraida General PT Mitraida Indonesia Indonesia 3 month 17-Feb-2020 24-Feb-2020 2-Mar-2020 9-Mar-2020 30-May-2020 10-Jun-2020
b Cable NYY, Cable Branch, FRC, NYA, NYFGBY 4 besar, Cable Branch General PT. Jawel Electric/ PT. Berkah Eka Perkasa Indonesia/ Malaysia Indonesia/ Malaysia 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
c Cable Rack SLW Onaji General PT Onaji Triindo Indonesia Indonesia 1 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 26-Mar-2020 3-Apr-2020
d KWH Meter Thera Mitraida Unit Room PT Mitraida Indonesia Indonesia 1 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 26-Mar-2020 3-Apr-2020
PT. TAKENAKA INDONESIA MATERIAL APPROVAL & EQUIPMENT SCHEDULE
AXIA 3 SA PROJECT & COMMERCIAL DATA

9 LIGHTING FIXTURE SYSTEM


a Lighting fixture Downlight TDE Public1F FOH TDE Indonesia Indonesia 2,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jun-2020 24-Jun-2020
Square Base Odelic Public1F FOH PT Hikari Japan Japan 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
LED 46 W SurfaceMounted Odelic Unit Room PT Hikari Japan Japan 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
Base lamp,Emergency,EXIT Lamp Philips General PT Hikari Japan
Street light Philips External PT Hikari Japan
Garden lamp Philips External PT Hikari China Belanda 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020
Pool Lamp Hayward Public1F FOH PT. Aneka Bina Citra USA USA 3,5 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 17-Jul-2020 24-Jul-2020

b Cable NYM,NYRGBY 4 besar General PT Jawa Electric Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020

10 FIRE ALARM SYSTEM


a FACP Semi Addressible Hochiki General PT Draco International Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Detector ROR Heat detector, Smoke detector Hochiki General PT Draco International Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
Fix Detector Hochiki General PT Draco International Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Cable Nyyhy, Twisted Cable Jembo & First Cable General PT. Jawa Electric Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020
c Cable Tray STC Tipe Onaji General PT. Onaji Triindo Indonesia Indonesia 1 month 17-Feb-2020 24-Feb-2020 2-Mar-2020 9-Mar-2020 30-May-2020 10-Jun-2020

11 PUBLIC ADDRES SYSTEM


a Main unit Amplifier 360 watt TOA General PT Galva Tegnologies Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
b Speaker Box Speaker & Ceiling Speaker TOA General PT Galva Tegnologies Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
c Cable Nyyhy jembo General PT. Jawa Electric Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020

12 TELEPHONE SYSTEM
a Main PABX Out of Scope KDDI
b Telephone Outlet Out of Scope KDDI
c Cable ITC 4 besar/Jembo General PT. Jawa Electric Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020
d Cable Tray STC Tipe Onaji General PT. Onaji Triindo Indonesia Indonesia 1 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 26-Mar-2020 3-Apr-2020

13 SECURITY SYSTEM
a CCTV Ceiling type Panasonic General PT Secom japan japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Cable UTP Belden General PT. Jawa Electric Indonesia Indonesia 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020

14 LIGHTNING PROTECTION SYSTEM


a Lightning Protection R 100 Prevectron ROOF PT Kuarta Putra Pratama Perancis Perancis 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Cable NYY 4 Besar General PT. Jawa Electric Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

15 ACCES CONTROL SYSYTEM


a Acces Control Smart Card Reader Secom General PT Secom Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Key Lock MIWA UNIT PT. Bhineka Ciria Artana Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020

16 VIDEO INTERPHONE SYSTEM


a Video Interphone System Process Aiphone General Process Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020

ELEVATOR EQUIPMENT
17 a Passenger Elevator Capacity 11 Person/ 825 kg PT. Mitsubishi Jaya Elevator & escalator Thailand Japan 8 month 10-Mar-2020 20-Mar-2020 30-Mar-2020 30-Nov-2020
b Fire Elevator Capacity 14 Person/ 1050 kg MITSUBISHI General
c Service Elevator Capacity 11 Person/ 825 kg
PT. TAKENAKA INDONESIA MATERIAL APPROVAL & EQUIPMENT SCHEDULE
AXIA 3 SA PROJECT & COMMERCIAL DATA

B COMMERCIAL BUILDING
Spec / Material Location Supplier Product Origin Delivery Rev Description Date
No. Sub Item Type/Category
Submit approved Order PO ETA On site

MECHANICAL

1 VENTILATING SYSTEM
a Wall Fan Wall Mounted Type Panasonic General PT. Aneka Bina Citra Indonesia Japan 3 month 2-Mar-2020 4-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Ceiling Fan Ceiling Cassette Type Panasonic General PT. Aneka Bina Citra Japan Japan 3 month 2-Mar-2020 4-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
c Galvanize Steel Sheet Thicness 0.5 ~ 1.0 mm Lokfom General PT. Adimas Solasitama Indonesia Indonesia 2 month 2-Mar-2020 4-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
d PVC pipe (5kg/cm2) - D Pralon General PT. Laksamana Karya Adiyasa Indonesia Indonesia 2 month 2-Mar-2020 4-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
e Grille / Diffuser Custom, Aluminium Sheet, Naturally AMST General PT. Anugerah Multi Solusi Technic Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
f Vent Cap Custom, G.I. Sheet w/ Powder Coating AMST General PT. Anugerah Multi Solusi Technic Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

2 WATER SUPPLY & DRAINAGE SYSTEM


a HI - PVC Pipe JIS K 6742, HI-VP Class Kubota Chemix Main Line Normally Water System PT. Figo Teknik Japan Japan 3,5 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 17-Jun-2020 24-Jun-2020
b C - PVC Pipe ASTM F411, Schedule 40 Class Flow Guard Branch Line; Normally Water System PT. Senindo Karya Abadi USA USA 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
c PVC Pipe JIS 10K, VP Class Pralon Drainage System PT. Laksamana Karya Adiyasa Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020
d Valves Bronze 150 PSI KITZ Underground PT. Sinar mas Sakti China China 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
e Water Meter SNI Certificate, 150 psi Class Lois Victor General PT. Figo Teknik China China 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
f Floor Drain/ Clean out Bronze Plated w/ Chromium Batur General PT. Batur Artha Yulis Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020
g Manhole Cover Medium and Haevy Cast Iron Batur General PT. Batur Artha Yulis Indonesia Indonesia 2 month 1-Feb-2020 11-Feb-2020 18-Feb-2020 25-Feb-2020 20-Apr-2020 28-Apr-2020
h Mini Manhole PVC Manhole Kubota General PT. Figo Teknik Japan Japan 3 month 1-Feb-2020 7-Feb-2020 14-Feb-2020 21-Feb-2020 30-May-2020 8-Jun-2020
i Sanitary Fixture Body and Fitting Toto General PT. Indokeramikatama Perkasa Indonesia Indonesia 3 month 17-Feb-2020 24-Feb-2020 2-Mar-2020 9-Mar-2020 30-May-2020 10-Jun-2020
j Sewage Treatment Plant FRP Tank, Aerob and Anaerob System Bio-home General PT. Alam Hijau Indonesia Indonesia 2 month 8-Jan-2020 15-Jan-2020 22-Jan-2020 30-Jan-2020 29-Feb-2020 30-Mar-2020

3 a FIRE FIGHTING SYSTEM


b Hydrant Box, Pillar, Siamese Box Type B 750 x 180 x 1,250 x 1.2t OZEKI General Centra Bina Citra mandiri Indonesia China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
c Fire Extinguiser Portable Powder, A.B.C type 3.5 Kg VIKING General Centra Bina Citra mandiri Indonesia China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
d Black Steel Pipe Sch.40 - E.R.W ASTM A 53 Grade A. SPINDO General PT. Mentari Suplindo Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
e Valves Cast Iron 150 ~ 300 PSI KITZ General PT. Sinar mas Sakti China China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
f Pressure Reducting Valve Ductile Iron 150 ~ 300 PSI Klasse General PT. Figo Teknik China China 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020

4 LPG SYSTEM
a BS Pipe SCH 40 Seamless Sch.40 - E.R.W ASTM A 53 Grade A. China Pump Room PT. Mentari Suplindo USA USA 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
b Valve LPG Piping system Rub Lpg Room PT. Mandiri Berkat Abadi Italy Italy 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
c LPG Regulator LPG Piping system Itokoki Lpg Room PT. Mandiri Berkat Abadi Japan Japan 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020
d Panel Alarm LPG Piping system Local Lpg Room PT. Mandiri Berkat Abadi Indonesia Indonesia 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020

5 ELECTRICAL
SUBSTATION SYSTEM
a Transformer Oil Type, Indoor (500 kVA) Trafoindo Substation PT Tafoindo Prima Perkasa Indonesia Indonesia 3,5 month 1-Apr-2020 26-Feb-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 29-Aug-2020 10-Sep-2020
b MV Panel LBS ( Incoming ) Mitraida Substation PT Mitraida Indonesia Indonesia 3,5 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 29-Aug-2020 10-Sep-2020
Local Panel ACB / MCCB Mitraida General PT Mitraida Indonesia Indonesia 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
c Cable Rack SLW Onaji General PT Onaji Triindo Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
d Cable N2XSEBY, N2XSY, NYY, NYA 4 besar General PT Jawa Electric Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

6 GENERATOR SYSTEM
a Generator Silent Type ( 150 kVA ) Perkins Substation PT. Duta tata Ecoindo / PT. Fajar Gemilang Wilson Indonesia Indonesia 3,5 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 29-Aug-2020 10-Sep-2020
b Local Panel ACB/ MCCB Mitraida Substation PT Mitraida Indonesia Indonesia 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
c Cable NYY, NYA 4 besar General PT Jawa Electric Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
d Cable Rack SLW Onaji General PT Onaji Triindo Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

7 MAIN FEEDER SYSTEM


a Local Panel ACB/ MCCB Mitraida Substation PT Mitraida Indonesia Indonesia 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
b Cable NYY, NYA 4 besar, Cable Branch General PT. Jawel Electric/ PT. Berkah Eka Perkasa Indonesia/ Malaysia Indonesia/ Malaysia 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
c Cable Rack SLW Onaji General PT Onaji Triindo Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

8 LIGHTING FIXTURE SYSTEM


a Lighting fixture V-shape, Weather proof, Downlight Philips General PT Hikari China Belanda 3,5 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 29-Aug-2020 10-Sep-2020
Street light, Exit light, Reflektor type

b Cable NYM,NYRGBY 4 besar General PT. Jawa Electric Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

9 FIRE ALARM SYSTEM


a FACP 10 ZONE Hochiki General PT Draco International Japan Japan 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
b Detector ROR Heat detector, Smoke detector Hochiki General PT Draco International Japan Japan 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020

b Cable Nyyhy jembo General PT. Jawa Electric Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
c Cable Tray STC Tipe Onaji General PT. Onaji Triindo Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

10 PUBLIC ADDRES SYSTEM


a Main unit Amplifier 360 watt TOA General PT Galva Tegnologies Japan Japan 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
b Speaker Box Speaker, Ceiling Speaker & Horn Speaker TOA General PT Galva Tegnologies Japan Japan 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
c Cable Nyyhy jembo General PT. Jawa Electric Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

11 TELEPHONE SYSTEM
a Telephone Outlet Wall Type Panasonic General PT. Darma Dari Purna Japan Japan 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
b Cable ITC 4 besar/Jembo General PT. Jawa Electric Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020
c Cable Tray STC Tipe Onaji General PT. Onaji Triindo Indonesia Indonesia 2 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-May-2020 15-Jun-2020

12 SECURITY SYSTEM
a CCTV Ceiling Type Panasonic General PT. SECOM japan japan 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
b Cable UTP Belden General PT. Panca Inti Sentosa Indonesia Indonesia 3 month 2-Mar-2020 9-Mar-2020 16-Mar-2020 23-Mar-2020 30-Jun-2020 7-Jul-2020

13 LIGHTNING PROTECTION SYSTEM


a Lightning Protection R 100 Prevectron General PT Kuarta Putra Pratama Perancis Perancis 3 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jul-2020 7-Aug-2020
b Cable NYY 4 Besar General PT. Jawa Electric Indonesia Indonesia 2 month 1-Apr-2020 7-Apr-2020 14-Apr-2020 21-Apr-2020 30-Jun-2020 7-Jul-2020