TIME SHEET FOR WORK ON SITE

PCP JOB REFERENCE : KX6F


CUSTOMER :
SITE : 400/220_KV_GIS KADHARPUR SITE
ENGINEER ‘S NAME: BHARATH SAI.L MONTH : JULY YEAR : 2019
JOB UNDERTAKEN : SAS TROUBLESHOOTING

DATE WORKING TIME OVERTIME Bay No Activity Performed


FROM TO HOURS FROM TO HOURS
Travelling to site
23-07-18
24-07-18 ,
Reached site checked the schme

25-07-18 10:00a 7:00pm 9hours Ring formation has been done from400kv
m to control room

26-07-2018
PC’s has been arranged at site
27-07-2018 Inverter has been arranged, power supply
has been given
28-07-2018 Di cards has been tested internally

29-07-2018 Lans cables has been crimped

30-07-2018 Ring formation has been done from400kv


to control room
31-07-2018 Waiting for approval for upgrading DS
agile to 6.2.0.4
SIGNATURE DATE SIGNATURE DATE
31/07/2018 31/07/2018

ENGINEER ‘S NAME: Mr. SRIKANTH CUSTOMER‘S REP NAME : Mr. Rajesh Singh

GE T&D India Limited. DESIGNATION : SITE INCHARGE

CUSTOMER : M/S GE SOLUTIONS NOIDA