Professional Documents
Culture Documents
Moving axle_1
As it is calibrated material properties.
T=20 degrees.
Boundary condition as initial one. U3 restrained along the long side of the box.
Load type=Moving axle
New nodes for accelerometers 37
2. Moving axle_2
As it is calibrated material properties.
T=23 degrees. Set-5 created to apply temperature load
Boundary condition as initial one. U3 restrained along the long side of the box.
Load type=Moving axle
New nodes for accelerometers 37.
3. Moving_axle_BC
As it is calibrated material properties.
T=23 degrees. Set-5 created to apply temperature load
Boundary condition changed. U3 free along the long side of the box from the asphalt
level. Till base level it is restrained.
Load type=Moving axle
New nodes for accelerometers 37.
4. Ricker pulse
As it is calibrated material properties.
T=21 degrees. Set-5 created to apply temperature load
Boundary condition changed for second time. The single layer of nodes common to
asphalt and base layer are freed now in all directions.
Load type=Ricker pulse.
New nodes for accelerometers37.
5. Ricker_ pulse_2
As it is calibrated material properties.
T=22 degrees. Set-5 created to apply temperature load
Boundary condition changed for second time. The single layer of nodes common to
asphalt and base layer are freed now in all directions.
Load type=Ricker pulse.
New nodes for accelerometers37.
Time increment made smaller to 1e-04. [Simulation did not converge]
6. Ricker_ pulse_3
As it is calibrated material properties.
T=22 degrees. Set-5 created to apply temperature load
Boundary condition changed for second time. The single layer of nodes common to
asphalt and base layer are freed now in all directions.
Load type=Ricker pulse.
New nodes for accelerometers37.
Time increment made 4e-04.
7. Ramp load
As it is calibrated material properties.
T=22 degrees. Set-5 created to apply temperature load
Boundary condition changed for second time. The single layer of nodes common to
asphalt and base layer are freed now in all directions.
Load type=Ramp load.
New nodes for accelerometers37.
Time increment made 0.002.