Actuator 1
Actuator 2
Figure 2. Basic idea of the input load signal for the actuators (Bian et al. 2014)
2. Budget considerations
The budget for the suggested solution depends on the following:
1. Construction of track structure
2. The railway sleepers.
3. At least one hydraulic actuator to be purchased.
4. Sensors, data acquisition system to be purchased.
5. Reserving area for testing time.
6. Workmanship for setting up of test facility and during testing.