We have received the drawings for your corporate office prepared by Ar
Datta Ekbote. We want to clarify following mentioned points from you nad Mr. Ekbote 1. As per section there are 11 slabs+ machine room/water tank. Should we design the structure for 12 slabs? Please give us drawings which are going to be actually executed. 2. Is there any slab to be designed for parking loading? 3. The staircase is half circular in plan without any column in circular portion. Then we will have take columns on grid D-2b, E-2b, D-2d, E- 2d and there will be continuous one piece beam on these columns circular in plan supporting staircase. 4. As we are taking columns on grid F-2b, F-2d; we should take columns on grid F-1, F-2, F-3 and F-4 so that the toilets on cantilever beams are avoided. These columns will also support the overhead water tank shown in roof plan. 5. We will need structural beam between columns C-2 and C-3 at all floors above temple. With this beam we may not take the columns as L columns. 6. We will be providing RCC walls for lift, which is going to provide sheer wall effect to total structure sustaining all horizontal forces due to wind and earthquake. But presently the lift walls are totally separated from main structural frame. If two columns on junction of lift horizontal wall and office wall are taken, this problem will be solved. This will also help in reducing size of columns on grid E-2, E- 3. These columns will not foul on any floor except on ground floor. 7. There will be beams on grid C and E which is not shown in section BB 8. The cupboards will be designed as cantilever slab from beam with wall load as point load. 9. As per building permission the side margin for high rise buildings should be 1/3 of the height building. 10.What should be the capacity of overhead water tank? With new pressure pumps, overhead tanks are avoided. (Already used in hotel Tripursundari and working very well.) 11.As the span of beam supporting gutter is 6800, the depth will be similar to other beams, which is not considered in section CC 12.Section through chajjas on corner windows is required. Whether chajjas through beam bottom is required. 13.Why one extra floor of cabin below machine room is provided? 14.Beam cross section is visible in elevation A. We can avoid the same by stopping the beam inside wall and only slab strip supporting the exposed brick wall will be visible. Please clarify these points so that we will proceed with STAAD analysis and detail design. Regards.