GT 42 - FF Update 10.09.19

You might also like

You are on page 1of 1

Job: Muara Tawar GT 41 / 800531 / SGT5-2000E(6) Type: Inspection Status Report

Start: 10.09.19 Overview of Findings

Prüfpunkt
PCM
Checklist
Befund-Bezeichnung Befund Empfehlungen Nummer PCM Titel
item
Title of Finding Finding Recomendation PCM PCM title
number
Design group inspection according to Siemens
6.9 Flame Cylinder
OEM guidelines indicates following findings:
Perform overlay welding per Welding Process
Flame Cylinder, Tile Material thinning and scuffing or hammering marks Specification and restore specified contour
6.9.9
Support Ring observed on the outside dia of the tile support ring NDE for crack-free surface using dye penetrant
examination.
Ceramic Heat Shield in the A total of 68 tiles found with breakouts, cracks and
6.9.12 Replace affected CHS with new.
Installed Condition erosion above tolerance.
Flame Cylinder, Transition
from Flame Cylinder Sporadic cracks and scaling observed on the F-
6.9.17 Leave as found.
Region to Combustion ring
Chamber Shield (F-ring)
Design group inspection according to Siemens
7.9 Flame Cylinder
OEM guidelines indicates following findings:
Perform overlay welding per Welding Process
Flame Cylinder, Tile Material thinning and scuffing or hammering marks Specification and restore specified contour
7.9.9
Support Ring observed on the outside dia of the tile support ring NDE for crack-free surface using dye penetrant
examination.

Frei verwendbar Liste aktualisiert am: Befundaufnehmer: Page:


List updated on: 10/09/2019 Fact Finder: Viren Gandhi Seite:1
DRAFT DRAFT DRAFT

You might also like