ENERGYPAC POWER GENERATION LIMITED

(115 MW HFO Based Power Plant)


EPVTL Project, Thakurgaon.

MATERIAL REQUISITION FOR RACK & TOOL BOX MAKING

Unit/Project Name Purpose of Goods/Service Required Date


EPVTL, Thakurgaon Engine assemble 06.03.2020 Delivery Address thakurgaon project
Cost Control Head Sub Control Head Allocated Budget
Mechanical Contact Person Md. Abdul Motaleb
PR Number Type of PR PR Date Phone: 1719468585
e-mail: motaleb.ped@energypac.com

Current Quantity Goods/Service Details Specification/Size/Model/Country of Estimated/Budgested Cost


S/N Unit
Stock Required Category Origin/ Grade or any other details Unit Price Total Cost
1 200 mtr MS angle L 38X38X3thk 107.34 21468
2 32 mtr Hollow Box 50X50X2thk 296 9472
3 62 CFT Wooden Block (5X20X1.5thk) inch 300 18600
4 2 Pcs Tool box 1000X500X1500 (LXWXH) 17000 34000
5 4 Nos Rack Making Charge 2000 8000

Suggested Total
Estimated cost are given from local Market survey. Err:522
Supplier/Remarks: Estimated Cost

Prepared By Approved By Received By

Name: Md Abdul Motaleb Name: Gazi Muhammmad Mahtab Hussa Name:

Signature: Signature: Signature:

Department: Mechanical Department: Project Management Department: