You are on page 1of 23

The journey of ballastless track - Global Railway Review

RECOMMENDED tes On-demand webinar: Exploring next generation track maintenanc

Privacy Overview
This website uses cookies to improve your experience while you navigate
through the website. Out of these cookies, the cookies that are
categorized as necessary are stored on your browser as they are as

Show more

About us | Advertise with us | Contact us   


Necessary Always Enabled

Search...
Login | Subscribe Free | Email Sign-up

 MENU

DIGITALISATION FREIGHT INFRASTRUCTURE REGS & LEGS

ROLLING STOCK SAFETY & SECURITY SIGNALLING SUSTAINABILITY

THE PASSENGER THE WORKFORCE

ARTICLE

The journey of ballastless track

7
SHARES

a d k s v 1

Posted: 23 August 2005 | | No comments yet

When the new high speed line Nüremberg-Ingolstadt is opened for service in
2006, more than 800km of ballastless track will be in operation in Germany.
The different systems have undergone extensive laboratory and field tests
before implementation on grade, bridges and in tunnels. Available
measurement results indicate the expected favourable structural behaviour

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

and prove the low maintenance requirements.

When the new high speed line Nüremberg-Ingolstadt is opened for service in 2006, more than 800km of ballastless track will be in
operation in Germany. The different systems have undergone extensive laboratory and field tests before implementation on grade,
bridges and in tunnels. Available measurement results indicate the expected favourable structural behaviour and prove the low
maintenance requirements.

When the new high speed line Nüremberg-Ingolstadt is opened for service in 2006, more than 800km of
ballastless track will be in operation in Germany. The different systems have undergone extensive
laboratory and field tests before implementation on grade, bridges and in tunnels. Available measurement
results indicate the expected favourable structural behaviour and prove the low maintenance requirements.

Advantages of ballastless track

With increasing speed and a lay-out of lines with extreme track parameters – e.g. to achieve a routing in
parallel to existing motorways which has great advantages in respect of environmental aspects (e.g. less
efforts for reduction of noise emission due to close neighbourhood) – the use of conventional ballasted
track structure is limited. For example, the lay-out parameters of the 155km long ballastless track section of
the Frankfurt-Cologne high speed line (Vmax = 300km/h) with a regular track radius of 3.350m, a cant of
170mm and a gradient of 40 per cent scarcely could have been realised with a conventional ballasted track
structure according to the design standards of DB.

The infrastructure of the HSL Zuid in The Netherlands is built according to a so-called DBFM (Design,
Build, Finance, Maintain) contract, and the availability has to be guaranteed at a specified high level of 99
per cent for 25 years1. Therefore, the awarded consortium, INFRASPEED, decided to perform a ballastless

track in spite of the existing poor subgrade conditions.

For evaluation purposes, it is necessary to take into consideration the interaction between vehicle and
track. Passengers have always assessed riding comfort in a train by their individual impressions. Old
definitions from 1928 (Figure 1) could still be valid today when riding on the first and third generation of ICE
along existing old ballasted tracks or on new high speed lines in Germany with ballastless track and trying
to write in a notebook. However, there are still objective criteria to assess comfort, security and danger of
distress of track components by measurement of forces and accelerations (Figure 2). Low axle loads (ICE
3 <170 kN compared with 198 kN for the ICE 1 and ICE 2) and low dynamic forces, which depend on
unsprung mass and suspension systems as well as on maintenance intervals for reprofiling of wheel rims
are required. The resistance against lateral track displacement (Prud’homme value SY) could be critical for
a ballasted track with wooden sleepers due to its low dead weight, but not for a concrete slab track,

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

especially when constructed continuously reinforced and herewith owing a very high moment of inertia in
lateral direction.

The rail temperature also has to be taken into consideration as a security criterion in respect of the danger
of track buckling. The ICE 3 uses linear eddy current brakes, which heat up the rails. An analysis by the
equations in Figure 3 demonstrates that the critical temperature rise DTo for buckling of a conventional
concrete sleeper track is exceeded if the extra heat from eddy current brakes sums up to 18 K. If eight
trains per hour activate a braking force of 80 kN per rail at the same track section the addition temperature
rise would be 25 K2, i.e. a conventional ballasted track would not be suitable. But for a slab track (S.T.)

there is no risk of danger due to its rigidity.

Therefore, the main advantages of ballastless slab track can be concluded:

Ensures excellent riding comfort at high speed

The resistance against excessive forces is increased

It enables the use of eddy current brakes

No problems with ballast churning at high speed

The average distance of crossovers, which are necessary for maintenance operations can be
increased significantly (Frankfurt-Cologne line about 28km)

No problems with vegetation control which is essential for a ballasted structure

Reduction of structure height, especially in tunnels, (less aero-dynamic resistance, enables


implementation of tilting trains in existing tunnels)

The snaking railway route with extreme track parameters in hilly regions enables to save money due to
less engineering of tunnels and bridges if a new line is constructed

Assuming a matured slab track design and good quality a significant reduction of maintenance and a
service life of 60 years is expected, which is the twofold value of conventional ballasted track

Development of concrete slab track

The development of ballastless slab tracks for full service railways was initiated in Europe in the middle of
the 1960s by the planning of long tunnels where the track had to be laid directly on a rigid rock or concrete
base. In Japan the same problem has arisen by the construction of the new Sanyo-Shinkansen lines,
opened in 1973/74, where more than 80 per cent of the tracks had to be supported by rigid concrete
structures; tunnels and viaducts are ideally suited for S.T.

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

In 1972 in Germany, an innovative structure was installed at Rheda station, consisting of a continuously
reinforced concrete slab to which exactly aligned concrete sleepers were monolithically fixed by means of
filling concrete (Figure 4). In spite of the excellent behaviour of this, about 700m long, ‘Rheda-structure’ on
grade (no maintenance except rail grinding operations has been necessary up to date) further
developments and applications of ballastless tracks have been at quite a low level until 1990. In 1991, new
high speed lines (with a maximum speed of 250km/h with ICE and 120km/h with freight trains) in a length
of 427km were opened to revenue service. Only about 15 track-km of ballastless track (Rheda type) and
5km of the ‘Züblin system’ were installed in four tunnels of these new high speed lines. While the S.T.
sections demonstrated good behaviour, maintenance problems with ballasted track soon became evident,
especially ballast wear.

The reason for the ballast deterioration is the high contact pressure of the ballast due to a rigid support
especially on bridges but also on grade with the perfect compacted subgrade, frost blanket layer and
granular protection layer. On the other hand, measurements of the vertical vibration velocity of the ballast
demonstrated that the effective rms-values are doubled when the speed is increased from 160km/h to
250km/h. To counteract this phenomenon more resiliency has to be introduced in the ballasted track
system. Figure 5 demonstrates the effect of high resilient fastening systems on the vertical vibration
velocity3. However, this significantly increases the investment costs for a ballasted track.

Therefore, the board of DB AG decided in 1994 that, for all new high speed lines and upgraded lines to be
constructed in Germany, the use of ballastless track has to be considered in the planning phase. This
enables the railway to exploit the special advantages of the slab track structure in a much better way. This
change of policy by the management of DB AG has spurred the road construction companies in Germany
to develop new ballastless track structures4. Innovative structures have to be structurally designed and

tested intensively in the laboratory before they undergo trials. In general, a distinction between three basic
systems can be made.

Resilient fastening system

Due to the rigid structure of S.T., a dominant requirement for all systems is an elastic rail fastening. The
deflection under a 20 tonnes axle load should be similar to that of a conventional ballasted track. Long-term
experiences on the latter demonstrate that the load distributing effect of the rail can be optimised by a rail
deflection of about 1.5 to 2.0mm. The standard fastening system 300 of DB AG for ballastless track
ensures this deflection behaviour by a resilient base plate pad with a spring coefficient of 22.5 ± 2.5
[kN/mm]. The longitudinal creep resistance of the rail in one fastening system must exceed 7 kN to prevent

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

excessive gap widening of the continuously welded rail in case of a rail fracture in winter.

Sleeper panel fixed by anchors to the pavement or embedded monolithically

The use of prefabricated sleepers guarantees exact gauge and rail inclination, which is essential for a
stable wheel-set run and less wear at high speed. An advantage of systems with anchoring devices for the
sleepers (Figure 6) is an easy reconstruction of sleepers in the case of derailment or deterioration. On the
other hand, this design requires a precise paving of the concrete pavement (level tolerance ± 2mm) and a
reduction in sleeper height tolerance (± 2mm) as only a 5mm thick geotextile at the bottom of the sleepers
shall make up for contact irregularities.

In existing old tunnels a minimum structure height can be achieved by an asphalt pavement in a thickness
of only 15cm, to which sleepers are fixed. The main feature of the GETRACA3-system are ‘wide sleepers’
fixed elastically by a concrete block on its underside, which is poured by a special mortar in a respective
recess of the asphalt pavement. In the 3.04km long Brandleite-Tunnel the existing ballasted track was
reconstructed in 2005 with this GETRAC-systems (Figure 7), which enables to increase speed by service
with tilting trains due to the increased tunnel profile. Successful for the monolithical system has been the
Rheda-family (Figure 8) and the Züblin-system. The difference is that with the Rheda system the concrete
sleepers are laid on a continuously reinforced concrete slab and then embedded in stage II concrete, while
with the Züblin system the concrete is first paved, after which the sleepers are vibrated exactly aligned into
it. 38km of the new high speed line between Nuremberg and Ingolstadt are just under construction with the
‘Rheda 2000’-system, where lattice-type two block sleepers are used, ensuring a better bond between
sleeper block and filling concrete at reduced construction height (Figure 9). The Rheda 2000 system is also
used in The Netherlands on the HSL Zuid (Figure 10) which will be opened in 2006.

Discrete rail seats on a concrete slab

Essential for this structure is an accurately paved concrete slab. The acceptable tolerance of ± 2mm in
height is much lower than in road construction. The construction of this structure can be highly
mechanised, however it requires high technology and a specialised working team. All systems developed
up to now demonstrated that the required accuracy cannot be achieved without any additional construction
method, e.g. a special ‘finisher’ or final grinding of the concrete surface before fixing the resilient fastening
system (Figure 11).

It is well known from highway construction that jointed concrete pavements with increasing slab length and
decreasing thickness tend to curl under temperature and moisture differentials, and often demonstrate

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

pumping phenomena at joints. Hence, for high speed service, the concrete slab should be installed
continuously reinforced (steel content about 0.8 per cent of the concrete slab cross section) to ensure fine
cracking with a spacing of about two metres and a crack opening of less than 0.5mm. From the results of
different test sections, it is evident that the average crack spacing was reduced after three years from 3.3m
to 1.6m, the maximum crack width remained constant with 0.3 to 0.4mm due to the additional development
of cracks. The risk of loosening of dowels or anchor bolts of the fastening by free cracking can be
minimised by transverse notches on top of the concrete slab with a spacing of 1.95m, which is after every
third rail seat.

Pre-cast slabs or frames

For this type of S.T. structure on grade pre-cast 20cm thick concrete slabs, pre-tensioned in transverse
direction, are laid on a cement-treated base course or asphalt pavement, adjusted by threaded spindles
and afterwards undersealed with a liquid cement-asphalt-mortar (CAM) of low viscosity and high resistance
against frost and erosion. The weakest part of this structure are the joints, which therefore should be
coupled to reduce curling under temperature and moisture differentials and to prevent by shear transfer the
critical loading case ‘free edge’, where the deflection increases to the 3.5-fold value of the loading case
‘slab interior’, which causes the danger of pumping phenomena.

At the test track ‘Karlsfeld’, constructed in 1977 (Figure 12), the protruding longitudinal bars were alumino-
thermic welded after small parts of the joint had been filled up with cement mortar. Hence, the thermic
shrinkage of the welds caused a certain prestressing effect in longitudinal direction. An excellent long-term
behaviour was obtained to date. However, the investment costs have been very high.

This type of structure nowadays became interesting due to modern production methods of the slabs and a
more simple kind of coupling the six longitudinal bars by sleeves. With the Bögl-system, the prefabricated
slabs are 6.45m long and in transverse direction notched after each rail seat. Hence a fine cracking can be
activated in a spacing of 0.65m, similar to the behaviour of a continuously reinforced concrete slab.
Decisive for thickness design is the bending stress in transverse direction, which can be reduced by
prestressing. After the construction of two test sections in 1999 (Rot-Malsch on cement treated base,
Hattstedt on 30cm thick asphalt pavement) this system is under construction in a length of about 35km on
the new Nüremberg-Ingolstadt high speed line (Figure 13).

A decisive prospect of slab track is that the investment costs are not too high in comparison with the
standard ballasted track. When the less engineering structures (bridges and tunnels), the high speed
(which requires efforts to increase resiliency of standard ballasted track) and significantly reduced

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

maintenance are taken into consideration, the slab track is more superior to ballasted track. A reduction of
investment costs deems possible by use of a frame-shaped slab track. In Germany, a test section was
installed in 1988 (Hoesbach) where the short prestressed frames were undersealed by a hot mastix
(‘Gussasphalt’, which requires no compaction) on an asphalt pavement (Figure 14), but its production costs
were too high. Experiences in Japan, where this type was laid in a length of 130km in tunnels (Hokuriku
Shinkansen line) demonstrated, that the costs for the frame-shaped track is eight to 14 per cent lower than
that of ordinary slab track5. Consequently in Korea, a frame shaped S.T. was developed to be installed on

the new high speed line under construction. By coupling the frames at the joints (Figure 15) and notching
the surface of the frames, a similar long-term behaviour can be expected as with continuously reinforced
concrete slabs or the coupled slab track system in Karlsfeld.

Special advantages of this type of structure are greater independency under unfavourable weather
conditions and the possibility of opening to traffic soon after construction. Hence, for necessary
reconstruction of a S.T., reduction of restraints can be expected.

Performance, deflection behaviour

Measurements by inspection cars on different concrete slab tracks demonstrate that the Q–values for track
geometry remain nearly constant with increasing service time. Hence, for high speed traffic, a constant
dynamic behaviour with increasing service time can be assumed, if a matured design and good quality is
available.

In Figure 16, the mean static rail deflection of different S.T. at test section Waghäusel under a 200 kN-axle
– as well as immediately after construction (1996) as after three years of revenue service (60 million gross
tons) – are plotted. All structures demonstrate only small differences between both measurements. The
required rail deflection of 1.5mm to 2.0mm is nearly met; it should be considered that the rail deflection is
mainly influenced by the elastic behaviour of the resilient base plate pads of the fastening system.
Considering unavoidable ageing effects and permanent deformations a spring coefficient of even under 20
kN/mm (ambient temperature) should be required. The somewhat higher rail deflection of system ‘F’ is
influenced by a rail seat spacing of more than 0.65m. This wide rail seat spacing should not be used in high
speed tracks due to the danger of periodic secondary deflections between the sleepers.

In Figure 17, the variation coefficient of static rail deflection for the same S.T. structures is plotted. The
values give information about the scatter of resilient support. Experiences demonstrate that with a good
aligned conventional ballasted track a variation coefficient of about 15 per cent is available shortly after
tamping, however with increasing service time this value increases severely due to developing track

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

irregularities. This value has been met with nearly all S.T. structures.

Dynamic deflection measurements (Figure 18) under high speed i.g. demonstrated no increase; the
stiffening effect of the resilient pads and underground under dynamic loading has to be considered
herewith. Hence for a S.T. of good quality at construction a constant dynamic behaviour can be assumed
for high speed traffic. For the structuraldesign of S. T. a dynamic factor of 1.5 is sufficient, independent on
speed6.

Conclusions

Ballastless concrete slab tracks of different design are in revenue service for more than thirty years. From
the existing S.T. structures, an excellent long-term behaviour with a minimum of maintenance can be
concluded, if a matured design is used and high quality is ensured at construction.

Figure 1: Definition of train riding quality from 1928

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 2: Criteria for vehicle-track-dynamic

Figure 3: Theory of track buckling (Meier) - critical rail temperature raise to against neutral
temperature

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 4: Classical Rheda section

Figure 5: Vertical vibration velocity in ballast aggregates for structures with different resilient
fastenings

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 6: BTD V2-structurewith concrete sleeper panel and anchors on a continuously reinforced
concrete slab

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 7: Wide sleepers on 15 cm wide asphalt pavement


(GETRAC A3-system in Brandleite tunnel)

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 8: Rheda structure on the Hannover-Berlin line

Figure 9: Rheda 200 system ( Pfleiderer) on the line Ingelstadt Nuremberg

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 10: Rheda 2000 on settlement free plates at the HSL Zuid (The Netherlands)

Figure 11: BTE slab track Of Zublin; discrete rail seats on a continuously reinforced slab with ground

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

surface

Figure 12: Test track Karlsfeld (1977) and Bogl system with coupling of continuous reinforcement

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 13: Bogl system on the line Ingolstadt-Nuremberg

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 14: Test track Hoesbach (1988)

Figure 15: Frame shaped slab track development in Korea

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 16: Mean static rail deflection (200 kN-axle)

Figure 17: Variation coefficient of rail deflection

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Figure 18: Measured rail deflections

References
1. Esveld C.: Recent developments in slab track, Global Railway Review, Issue 2, 2003

2. Jaensch E.: Slab track for high speed lines in Germany, Global Railway Review, Issue 4, 2003

3. Leykauf, G., Stahl, W.: Concrete railway sleepers for the optimisation of ballasted track, Global
Railway Review, Issue 2, 2004

4. Leykauf G., Mattner L.: Ballastless track structures in Germany, Global Railway Review, Sept. 1995

5. Ando K., Sunaga M., Aoki H., Haga O.: Development of Slab Tracks for Hokuriku Shinkansen Line,
QR of RTRI, Vol. 42, No 1, Mar 2001

6. Eisenmann, J., Leykauf, G.: Feste Fahrbahn für Schienenbahnen, Betonkalender 2000

ISSUE

Issue 3 2005

RELATED TOPICS

Track/Infrastructure Maintenance & Engineering

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

RELATED ORGANISATIONS

Munich University of Technology

RELATED PEOPLE

Günther Leykauf

Most popular... Read the


latest issue
Bombardier receives order for 19 Regio 2N
All subscriptions
regional trains from SNCF
include online
membership, giving
COVID-19 and its impact on the European you access to the
rail supply industry journal and exclusive
content.
Network Rail teams move 370,000 tonnes of
medicine and vital supplies in one week
SUBSCRIBE TODAY
ScotRail becomes first UK train operator to
publish real-time train data

Alstom awarded Germany contract for supply


of 30 Coradia Lint trains

RELATED CONTENT

NEWS NEWS
Metrolink receives USDOT funding for safety Goldschmidt combines international services
and operations improvements with new brand

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

By Global Railway Review By Goldschmidt

NEWS ARTICLE
Norfolk Southern deploys locomotive-based Deutsche Bahn: Avoiding the impact of winter
autonomous track system weather

By Global Railway Review By Deutsche Bahn AG (DB AG)

Leave a Reply

Your email address will not be published. Required fields are marked *

COMMENT

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

NAME *

EMAIL *

WEBSITE

Post Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

CONTENT TOPICS ADVERTISING & EDITORIAL


News Digitalisation Advertising Opportunities
Industry Insights Freight Advertising Tech Specs
Articles Infrastructure Advisory Board
Magazine Regulation & Legislation Information for Authors
Whitepapers Rolling Stock Media Planner
Webinars Safety & Security Permission to reuse our content
Events Signalling & Telecomms
Company Profiles Sustainability
The Passenger
The Workforce

COMPANY INFORMATION WRITE FOR US | ADVERTISE


WITH US
Global Railway Review is published by:
Russell Publishing Ltd.
Court Lodge
CONTACT
Hogtrough Hill
Brasted, Kent, TN16 1NU
United Kingdom
REGISTER
About

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]


The journey of ballastless track - Global Railway Review

Terms & Conditions T: +44 (0)1959 563311


Privacy Policy F: +44 (0)1959 563123

© Russell Publishing Limited, 2010-2020. All rights reserved.

Website development by e-Motive Media Limited.

https://www.globalrailwayreview.com/article/2681/the-journey-of-ballastless-track/[4/1/2020 9:35:40 PM]

You might also like