• Demonstration of VCP-EAM
Integration
• Key Takeaways
Support planning
Support Project
for Rebuildable
Manufacturing
Items
Resource
Unavailable when it
Repair returns
is scheduled for
Planning (Usable
maintenance when
vs. Defective)
importing eAM
Work Orders
Schedule by
instance should be
checked
Dummy Maintenance
Work Orders are created
to occupy the resource so
that the planning engine
cannot create planned
orders during that time..
We can see the Dummy
work orders with the
Order number started as
D-WO288434
The “Dummy” work order would be created for entire work order duration. When creating the “Dummy”
work order it would be created as firm and not scheduled by engine or on-line planner.
The work order number should be created by prefixing a character at the start of the base work order to make it unique.
For example work order “WO288434” the letter “D-” should be prefixed to create “D-WO288434” to signify a “Dummy” resource work
order.
The work order end dates should be derived based on the following examples based the profile of the assets downtime. If the downtime
spans several (consecutive) days, and the downtime hours are the same on each day, it will suffice to create one single dummy work order
with appropriate start and end dates. Otherwise, multiple dummy work orders need to be created for the different days.
The “Dummy” “Maintenance Work Orders” should be planned and displayed just like
other “Maintenance Work Orders”. Since the “Dummy” “Maintenance Work Orders”
will not contain component demands there is not a risk to release them back to source.
“Maintenance Work Orders” are block for release unless a substitute component is
planned.
Department Resources
This release (12.2.4.1) enables the integration between EAM and SPP. Work Order Demands from
EAM are collected into SPP and then planned for within SPP. Supplies pegged to the demands can
then be released back to EAM.
Note that this integration relies heavily on the existing integration between EAM and ASCP that
was delivered in a prior release.
eAM (EBS Enterprise Asset Management) – SPP (EBS Service Parts Planning) Integration
Supplier
Regional DC Customers
Defective
Central {Plant) - EM1
Usable
Plant – M6 Defective
Usable
Regional Distribution Center – D1
Usable
Enable Prioritize
Existing Supplies
over Buy
Enable Derive Returns
Forecast from Work
order Demands
Maintenance Work
Order Demand being
Planned using the SPP
Flow