Professional Documents
Culture Documents
Disusun Oleh :
MARTA WERI
0117087
DPP PRODUKSI (MLH)
AREA CENTRAL
AGUNG SARONO EKO ISWANTO (CONC) EKO ISWANTO WAHYU S. (CONCI) KUSMARGONO
ENGINEERIN
G SIS SHE
HCGA
HUMAN CAPITAL, GENERAL AFFAIR &
FINANCE ADMINISTRATION
DEPARTEMEN
Struktur Organisasi
Human Capital
Manager
Ahamad Roni Human Capital Human Capital
Development Section Service Section
General Affair
Deputy External Relation
General Manager HCA Manager
A. Rizaq Fuadi A. Rizaq Fuadi Facility Support General Support External Relation & Mngmt Information
(Conc) Section Section Security Section System Section
Finance
Administration
Section
Andryas YP
Human Capital (HC)
BISNIS PROSES
Program
Kebutuhan Training &
Pengembangan
Man Power Development
Karyawan
HUMAN CAPITAL DEVELOPMENT
Pembinaan & Relasi
Perencanaan Industrial Karyawan
Relation
SPDK & Penghargaan
Data Karyawan Masuk
Recruitment Karyawan
Hukum, Asuransi & Program Pensiun, MCU, Legal, Labour, Supply &
Klaim Pengobatan Benefit
JOB DESKRIPSI
HC
HC SERVICE
DEVELOPMENT
1. Proses rekruitment
1. Payroll & Pajak Penghasilan (PPH21)
2. Development 2. Insentive Karyawan, Kompensasi &
3. Reward & Punishment Tabungan Dana Pensiun Lembaga
4. Pembinaan Karyawan Karyawan (DPLK)
5. Pembinaan Serikat Pekerja 3. Klaim pengobatan dan hospital
4. Cuti Karyawan
5. Absensi Karyawan
6. Asuransi BPJS Ketenagakerjaan
7. Database Karyawan & History Record
8. Surat Tugas
General Affair (GA)
BISNIS PROSES
Master Transport,
Berita Acara
Budget Purchase and
Serah
Infrastructure
Terima
Execution
Transport, Purchase
and Infrastructure
Requirement
JOB DESKRIPSI
Melakukan maintenance
Management dan
peralatan yang digunakan
maintenance fasilitas Facility
yang tersedia di dalam
MIS untuk proses bekerja (HT,
support Komputer, CCTV, Jaringan
perusahaan dan di mess.
Internet, Software)
Finance Accounting
(FA)
BISNIS PROSES
Yearly Budget
Account Payable (AP)
Master Budget
Site Performance
-GP Report
-LRAS
Quarter Review
Finance Accounting
(FA)
JOB DESKRIPSI
1. Budgetting
2. Pengelolaan uang
3. Invoice
4. Perhitungan dan
pembayaran pajak
Key Performance
Index (KPI)
HC GA FA
AGUNG SARONO
UNIT HEAD UNIT HEAD K3L PLANT MINING UNIT HEAD UNIT HEAD
K3L MINING TUTUPAN TUTUPAN & SUPPORT KESELAMATAN OPERASI K3L HAULING OPERATION
LILIS TRI
Bisnis Proses
Penyusun
TARGET:
Strategi Monitoring & Menerima -Daily meeting
-Head Office
& controlling & Analisis -Monthly
-Customer
Aktifitas aktifitas K3LH Mengolah Report meeting
ADARO
Dept. SHE setiap area Report -SCM meeting
-Pemerintah
Tahunan
- Sidak - Review
- Inspeksi activity plan
- Observasi SHE
- Audit lapangan - Review KPI
-Work Instruction - Review PICA
Controlling program
-Review JSA-HIRA &
-Review SOP Perbaikan
-Review
Implementasi
Sapta Nirbhaya
Investigasi Insiden
Sapta Nirbhaya
3. System Control
5. Incident Analysis
NERCI Catalouging
VENDOR/SITE
Maintenace Issuing/
Received Dispatching Delivery
Repair Posting
Proses Preparation
PO
Tidak
Ya Transfer
Ya
Item
Terdaftar? Ada
Stock?
Tidak Internal Proses
PO
Resource ROT
Ya PR
Proses
WR/PR
External Proses
Ya WR Resource ROS ROB Proses
Create Quotation
PR
Create WR Cek
Stock
Job Activity
IR Avaibility (93%)
IR Avaibility Backlog (95%)
Stock Management
•Utilisasi on stock
• Interdistrik Transfer
• Over & Shortage stock
Key Performance Index
(KPI) PURCHASING
Outstanding PO 95%
Outstanding WR 95%
Discrepancy 0.02%
Whs transfer
Alat Berat
(Non Wheel)
FUEL, OIL, &
GREASE (FOG)
Bisnis Proses Oil & Grease
FOG
Forecast Kebutuhan Oli
PLANT dan Grease, INVENTORY PURCHASING
Request Oil & Grease Create RSO Create RO CREATE PO
SUPPLIER
Gudang Oli
(NREU,KKJ,SSL)
Lube Truck
Pit Stop
Workshop Alat Berat
Mining
PLANT HAULER
& WHEEL LOADER SECTION
JAMAKSARI
PLANT TYRE
SECTION
MANAGER PLANT
DEPARTEMENT ANTONIUS DWI
PLANT SUPPORT
SECTION
AGUS SUNARSO
Bisnis Proses MaMS
(Machine Management
System)
Key Performance
Index (KPI)
PHISICAL AVAILABILITY
Ketersedian Alat (PA) 90%
BACKLOG ACHIEVEMENT
Ketercapaian Backlog 85%
RE-WORK PERIODIC
Re-Work PS SERVICE
72 JAM
MTBF
Mean Time Between Failure 80 JAM
MTTR
Mean Time To Repair 5 JAM
ENGINEERING
ENGINEERING DEPARTEMEN
Struktur Organisasi
DOFIQ MUNAWAR
ENGINEERING TUTUPAN
MANAGER
EKO ISWANTO
MINE PLAN SECTION
YANTO
PROJECT CONTROL
SECTION
JANSFIN NADAPDAP
PROJECT ENGINEER
SECTION
AGUNG BRAMANTO
Bisnis Proses
QA
Quality, SHE
Target Produksi Management
Mine Design
Customer
Long Term
5 Year Plan
Yearly Plan
Quarterly Plan Production Evaluation
Mine Design Monthly Production
Short Term Mine Design
Monthly Plan
Weekly Plan
Daily Plan
Mine Design
Monthly Production Project
Pit Control Survey
Work Order Control
Acuan Kerja & Design
MANAGER
ROAD & DISPOSAL
DEVLOPMENT
KUSMARGONO
DISPOSAL &
DISPOSAL & PROJECT NORTH DEWATERING
PROJECT CENTRAL ROAD OPCC
WEST
QA
QUALITY & SHE MANAGEMENT
EGINEERING
• Equipment
• Man Power
• Material
HCGA ROAD SECTION
• Man Power
• Instrument MAIN HAUL ROAD MONITOR &
P • Transport
• Meals • Road Audit CONTROL
L
A • Road maintenance
N (Surface, Bundwall, Ditch)
N • Road Construction
I
N
G
PLANT
• Equipment
Bisnis Proses
Disposal Project
QA
QUALITY & SHE MANAGEMENT
EGINEERING
• Equipment
• Man Power
• Material
HCGA DISPOSAL & PROJECT
• Man Power
• Instrument DISPOSAL
MONITOR &
P • Transport
• Meals • Disposal Management CONTROL
L
• Land Clearing
A
• Top Soil Management
N
N
I INFRASTRUCTURE
N
G • Pit Stop Area
• Drainage
• Change Shift Area
PLANT
• Sediment Pond
• Equipment
Bisnis Proses
Dewatering
QA
QUALITY & SHE MANAGEMENT
ENGINEERING
• Equipment
• Man Power
• Material
HCGA DEWATERING
• Man Power
• Instrument • HOST INSTALLATION
MONITOR &
P • Transport
• CONTROL
L Meals • PUMP INSTALLATION
A
N • PUMP OPERATION
N
I
N
G
PLANT
• Equipment
Key Performance
Index (KPI)
Promise Elemen
(Planning Meeting, Waste Dumping & Rehabilitation, Mine 10%
Service, Proses Management)
EKO ISWANTO
DEPUTY MANAGER
ANDRI WIJAYA K
QA
QUALITY & SHE MANAGEMENT
EGINEERING
Scheduling & Management Operation CUSTOMER
QA
QUALITY & SHE MANAGEMENT
EGINEERING
Scheduling & Management Operation CUSTOMER
PLANT FINISHING
• Equipment
• PA Unit
BA SERAH BA SERAH
TERIMA ROOF TERIMA FLOOR
Bisnis Proses Drill
and Blast
QA
QUALITY & SHE MANAGEMENT
EGINEERING
• WO Drill & Blast
• Drill & Blast Design
• Setting Unit Support
HCGA
•
•
Man Power ,
Instrument
DRILL & BLAST
LOADING & • Transport, Meals
DRILLING BLASTING MONITORING
P HAULING Support Preparasi & CONTROL
L Pra Drilling
A • Drilling Operation • Blasting Operation • Recovery
N
CSR • Fragmentasi
Pengamanan • Hole Available • Blast Report • Ground Vibration
N • Sleep Blast
I
• Drill Report • Post Blast • Air Blast
ADARO • Peledakan
N CUSTOMER :
G
INDONESIA Bahan Peledak
MLH,
PLANT ENGINEERING
• Equipment • Inventory Blasting
Key Performance
Index (KPI)
Productivity Effort 5%
Utilization of Avaibility Drilling 10%
Productivity/Jam 10%
Execution Accuracy DB
Promise Elemen 20%
(Akurasi kedalaman, Powder Factor)
(Plan & Meeting, Loading Hauling, 5%
Productivity Effort 5%
Utilization of Avaibility Drilling 10%
Productivity/Jam 10%
Execution Accuracy DB
Promise Elemen 20%
(Akurasi kedalaman, Powder Factor)
(Plan & Meeting, Loading Hauling, 5%