You are on page 1of 1

https://ntrs.nasa.gov/search.jsp?

R=20180004782 2018-12-18T08:10:01+00:00Z

Raymond Stewart Environmental Control and Life Support System for Orion Project Overview
Undergrad Senior at University of Central  Develop Reactive Control Logic
Florida studying Mechanical Engineering
Ground and Flight Application Software Team
software necessary for Orion during
Graduation Date: December 15, 2019
Pathway Semesters: Spring – Summer 2018
ground processing prior to launch and
after recovery.
Orion Ground Processing
 Develop the software used in the
 O&C operational testing of the Hybrid
• Turnover to NASA Electronic Radiation Assessor.
 MPPF
• Receives propellant, high  Develop the displays used by console
Kennedy Space Center NE-XF pressure gases and coolant
Directorate: Engineering
Operators for RCLs & HERA
 LASF
Division: Exploration
• LAS is attached to vehicle
Branch: Environmental & Life Support Systems
 VAB
• Vehicle loaded onto SLS
 Launch Complex 39B Significance
• Vehicle launched into space  The new Space Launch System (SLS)
Path to Pathways requires new software to be developed at
Kennedy Space Center for operations.
 US Navy – 2005 -2015  During critical phases of Orion's
• Fire Controlman *Image source: www.nasa.gov – Image gallery
processing, it’s important to have
• Close-In Weapons System software in place to protect the vehicle,
• 4 Deployments and personnel.
• US Diplomat – Rabat MO  While engineers are manning consoles in
• Defense Attaché Office the Launch Control Center, it is also
Reactive Control Logic HERA beneficial for those operators to know the
 NASA OSSI NIFS Intern – Fall 2017 software.
• Environmental Control System  Hybrid Electronic Radiation Assessor
• Test Procedures for ECS LC 39B  Detects the amount of radiation inside CM
 System will get checked out prior to launch

New Skills
What’s Next  CMMI for Development Certification
 Continuing Education at the  Programming in C++ (ACL IDE)
University of Cental Florida for the  For when Orion is powered up  Programs
Fall 2018 semester. during processing. • Creo Parametric
 Monitors the health of critical • AFT Arrow/Fathom
 Will return to NASA in Dec. 2018. vehicle systems. • FactoryTalk View
 Provides automated protection • Ladder Logic
 Will be working on Verification testing for the vehicle during ground • Linux
of the software after Fall 2018. processing • AccuRev & ClearQuest
 Alerts the operator of the • NetBeans & Nexus
 Will work in a part-time capacity until condition so the operator can  Software Development Process (NASA)
graduation in December 2019. take action if necessary.  Environmental Control System &
ECLSS Orion knowledge

You might also like