Professional Documents
Culture Documents
R=20180004782 2018-12-18T08:10:01+00:00Z
Raymond Stewart Environmental Control and Life Support System for Orion Project Overview
Undergrad Senior at University of Central Develop Reactive Control Logic
Florida studying Mechanical Engineering
Ground and Flight Application Software Team
software necessary for Orion during
Graduation Date: December 15, 2019
Pathway Semesters: Spring – Summer 2018
ground processing prior to launch and
after recovery.
Orion Ground Processing
Develop the software used in the
O&C operational testing of the Hybrid
• Turnover to NASA Electronic Radiation Assessor.
MPPF
• Receives propellant, high Develop the displays used by console
Kennedy Space Center NE-XF pressure gases and coolant
Directorate: Engineering
Operators for RCLs & HERA
LASF
Division: Exploration
• LAS is attached to vehicle
Branch: Environmental & Life Support Systems
VAB
• Vehicle loaded onto SLS
Launch Complex 39B Significance
• Vehicle launched into space The new Space Launch System (SLS)
Path to Pathways requires new software to be developed at
Kennedy Space Center for operations.
US Navy – 2005 -2015 During critical phases of Orion's
• Fire Controlman *Image source: www.nasa.gov – Image gallery
processing, it’s important to have
• Close-In Weapons System software in place to protect the vehicle,
• 4 Deployments and personnel.
• US Diplomat – Rabat MO While engineers are manning consoles in
• Defense Attaché Office the Launch Control Center, it is also
Reactive Control Logic HERA beneficial for those operators to know the
NASA OSSI NIFS Intern – Fall 2017 software.
• Environmental Control System Hybrid Electronic Radiation Assessor
• Test Procedures for ECS LC 39B Detects the amount of radiation inside CM
System will get checked out prior to launch
New Skills
What’s Next CMMI for Development Certification
Continuing Education at the Programming in C++ (ACL IDE)
University of Cental Florida for the For when Orion is powered up Programs
Fall 2018 semester. during processing. • Creo Parametric
Monitors the health of critical • AFT Arrow/Fathom
Will return to NASA in Dec. 2018. vehicle systems. • FactoryTalk View
Provides automated protection • Ladder Logic
Will be working on Verification testing for the vehicle during ground • Linux
of the software after Fall 2018. processing • AccuRev & ClearQuest
Alerts the operator of the • NetBeans & Nexus
Will work in a part-time capacity until condition so the operator can Software Development Process (NASA)
graduation in December 2019. take action if necessary. Environmental Control System &
ECLSS Orion knowledge