FORM :- VII

OPENING OF NEWLY CONSTRUCTED 3RD LINE


FROM KENDPOSI STATION (NEW PT. KM 345.252 AT TABU END)
TO MALUKA STATION (NEW PT. KM 357.054 AT DPS END)
OF RAJKHARSWAN-DANGOAPOSI 3RD LINE PROJECT OF CHAKRADHARPUR DIVISION.

STATION ACCOMMODATION
Length : 11.802 Km.( Km. 345.252 to Km. 357.054) Gauge : 1676 mm

Goods Water
Station Office Passenger Platform Goods Staff Quarter
Shed Supply for
(Sq.m) Platform Passenger
Name of Ticket Waiting Waiting Hall Height above
Sl.No. Length Remarks
station booking Room Rail Level (in Type- Type- Type-
Length in metre (in Type-I
counter metre) Metre) IV III II

1 2 3 4 5 6 7 8 9 10 11 12 13 14 14

PF-1 & 2 =
1 Kendposi 01 No 1 No Nil 350M(UP), PF-2 = LOW LEVEL NIL NIL 1 10 14 2
330M (DN)

10 Sqm. PF-1 & 2 = 350


2 Maluka 01 No 1 No (Newly Nil m(UP), PF- 3 LOW LEVEL NIL NIL 0 5 20 NIL
Constructed) =458.5m(DN)

(K.Hansda) (P.K.Sahu) (H.Goyal)


Dy.Chief Engineer/Con Principal Chief Commercial Manager Chief Engineer (Con)/I
S.E Railway, Tatanagar S.E Railway, Kolkata S.E Railway, Garden Reach