You are on page 1of 2

OPENING OF NEWLY CONSTRUCTED 3RD LINE

FROM KENDPOSI STATION (NEW PT. KM 345.252 AT TABU END)


TO MALUKA STATION (NEW PT. KM 357.054 AT DPS END)
OF RAJKHARSWAN-DANGOAPOSI 3RD LINE PROJECT OF CHAKRADHARPUR DIVISION.

EXISTING GANG STRENGTH

Length : 11.802 Km.( Km. 345.252 to Km. 357.054)

Between KM Gang
Total Gang
Sl/No Gang no Between Station Beat in Gang HQ Chainage Track Man Keyman Mate LR
From To Strength
Km.

1 9RB 340/17 352/21 KNPS-MLKA 12.122 KNPS 340.507-352.629 26 2 1 NIL 29

10 RB 352/22 358/22 KNPS-MLKA-DPS 6.141 MLKA 352.628-358.769 25 2 1 NIL 28


2

( K.Hansda) (H. Goyal)


Dy. Chief Engineer( Con) Chief Engineer/Con/II
S.E Railway, Tatanagar S.E Railway, Garden Reach
49
ANNEXURE-I

VISION.

Gauge : 1676 mm

Remarks

Santioned strength
for existing track
Santioned strength
for existing track