1. The daily progress report summarizes work done on the EPC 5/RE-004/LPIL-NZB Section Railway Electrification project for TSS/SP/SSP works.
2. It provides details of construction activities completed on date including anchoring of MS bars, concreting works, and RCC working.
3. The KEC representative and PMC/RE representative signatures are provided to verify the work detailed in the report.
1. The daily progress report summarizes work done on the EPC 5/RE-004/LPIL-NZB Section Railway Electrification project for TSS/SP/SSP works.
2. It provides details of construction activities completed on date including anchoring of MS bars, concreting works, and RCC working.
3. The KEC representative and PMC/RE representative signatures are provided to verify the work detailed in the report.
1. The daily progress report summarizes work done on the EPC 5/RE-004/LPIL-NZB Section Railway Electrification project for TSS/SP/SSP works.
2. It provides details of construction activities completed on date including anchoring of MS bars, concreting works, and RCC working.
3. The KEC representative and PMC/RE representative signatures are provided to verify the work detailed in the report.
DAILY PROGRESS REPORT FOR Tss/SP/SSP wORK PROJECT NAME: EPC 5 / R E - 004/LPIL - NZB SECTION RAILWAY ELECTRIFICATION TSS/SP/SSP & LOCATION : MLIDR. GR: 265 638 DATE: DPR NO.: Gross Scroll Net Cement REMARKSs Sr.No. DESCRIPTION OF wORK vOM Qty. Length Width HeightVolume volume Volume Consumed lirad MS 42 82aGlar6 8l6al U yuRLYB.6 2063200 IA32lounp 8 Crnksaack_Escaahs TOTAL PMC/RE Representative KEC Representative Signature. Signature. ***** Name*** * * * * * * . Mame .Adhuthdh.dauyoAH Designation . *** ANe KEC KEC INTERNATIONAL LIMITED DAILY PROGRESS REPORT FOR TSS/SP/SSP WORK PROJECT NAME : EPC -5/RE-004/LPJL - NZB SECTION RAILWAY ELECTRIFICATION RPG| R: 265 TSS/SP/SSP & LOCATION: MKDES.. 639 PR N O . e*sene************** : DATE: DESCRIPTiON OF WORK Cement Qty.Length Width Height Gross Net Scroll r.No. UOM volume REMARKS volume Volume Consumed NAb anchhmad uhh 5210 36|012 39.00 Bgo2uRLoy &Abrgoch road laBMAhah Lel o02 |42./2 Ly212Cum 2 AshtaachYaadhaaik Loil **** ExCarahi TOTAL KEC Representative PMC/RE Representative Signature. XJhopM Signature eee*****ean**** Name Name * DesignationkaghsAYASA Designation **** KEC INTERNATIONAL LIMITED kuhd KEC PROJECT NAME DAILY PROGRESS REPORT FOR TSS/SP/sSP WORK RPG| : EPC S/RE- 004/LPJL - NZB SECTION RAILWAY ELECTRIFICATION GR:265 640 TSS/SP/SSP &LOCATION : MBIDTS. PR NO. ********************* DATE * DESCRIPTION OF WORK Gross Scroll Net Cement r.No. UOM Qty. | Length Width Heightvalumel REMARKS volume Volume Consumed ldhdaide ASbngqnah neal CoJ 6 0 0 |1938- 122 um L ConbacHn TOTAL KEC Representatiye PMC/RE Representative Signature . . Signature.****eere ** **°°e***** Name Rhzsa.daouvaeey Name Desjgnation nAAn Designation. MkuCa KEC PROJECT NAME : EPC DAILY 5/RE
KEC INTERNATIONAL LIMITED
PROGRESS REPORT FOR TSS/SP/SSP WORK R A G | - 004/LPIL- NZB SECTION RAILWAY ELECTRIFICATION SR: 265 641 TSS/SP/SSP &LOCATION:. **** PR NO, DATE *** r.No DESCRIPTION OF WORK Gross Scroll UOM Qty. |Length Width Net Cement HeigheVolurmel volume Volume Consumed REMARKS Odel ApMch and oBM. 23 yOSl0:2 Ro63 8o63 Cu m 62 l063 Cumn MIC RCC w0nkg. TOTAL KEC Representaive PMC/RE Representative Signature SHU SUP ****** Signature ame ahutakh.cheurts Name Designation &utth.ISS Designation. **