You are on page 1of 5

COMPLETE PROJECT

STATUS SECTION
WISE (AK-PAU)
Complete Project Phase-1 Akola-Lohagad Phase-II Lohagad-Amanwadi
AK-SVW(Km 742-748)
Status: Akola- KM 742-775 (33 RKM) KM 776-787- (11 RKM)
Sr

Executed

Executed

Executed
ACTIVITIES UOM

Balance

Balance

Balance

Executed

Remarks
Balance
no

Total

Total

Total
TDC

TDC

Total

TDC
1 LOP TKM 244 106 138.399 39 39 0 Completed 14 14 0 COMPLETED 6.647 6.647 0 Completed
2 CSD TKM 244 90 154 39 39 0 Completed 14 14 0 COMPLETED 6.647 6.647 0 Completed
3 SED TKM 244 39 205 39 39 0 Completed 14 0 14 6.647 6.647 0.000 Completed

4 Main Foundations Nos. 4312 1543 2769 699 699 0 267 248 19 134 134 0
Completed 44242 Completed
5 Anchor Foundation Nos. 1033 350 683 161 161 0 65 60 5 31 31 0

6 Mast/Upright Erection Nos. 4312 936 3376 699 699 0 Completed 267 162 105 134 134 0 Completed
12-02-2021
7 Dwarf mast erection Nos. 80 14 66 14 14 0 completed 10 0 10 0 0 0 No scope
8 Bridge Mast BOLT Grouting Nos. 15 0 15 2 2 0 Completed 0 0 4 0 0 0 No scope
9 Bridge Mast Erection Nos. 15 0 15 2 2 0 Completed 0 0 4 0 0 0 No scope
10 Grouting Nos. 4314 842 3472 699 699 0 Completed 269 143 126 12-02-2021 134 134 0 Completed
11 Boom Erection Nos. 175 20 155 20 20 0 Completed 22 0 22 17-02-2021 8 8 0 Completed
12 Bond Erection
a Structure Bond Erection Nos. 5550 639 4911 847 847 0 Completed 267 0 267 134 134 0 Completed
13 Bracket Erection Nos. 5157 874 4283 804 797 7 Completed 340 80 260 15-02-2021 160 153 7 Completed
14 Guy rod erection Nos. 1023 87 936 153 153 0 Completed 63 6 57 18-02-2021 31 31 0 Completed
15 DA erection Nos. 320 25 295 25 25 0 Completed 41 0 41 17-02-2021 7 7 0 Completed
16 Anti Creep wiring Nos. 208 39 169 37 37 0 Completed 13 2 11 20-02-2021 7 7 0 Completed
18 Catenary wire Slots 301 27 274 46 46 0 Completed 18 0 18 26-02-2021 10 10 0 Completed
19 Contact wire Slots 301 26 275 46 46 0 Completed 18 0 18 26-02-2021 10 10 0 Completed
20 ATD Erection Nos. 512 37 475 80 80 0 Completed 32 0 32 28-02-2021 17 17 0 Completed
21 D & C TL shots 4212 47 4165 46.00 46.00 0.00 Completed 150 1 149 01-03-2021 10.00 10.00 0 Completed
22 Bracket adjustment Nos. 5157 801 4356 804 801 3 Completed 340 0 340 03-03-2021 160 160 0 Completed
23 Ladder Trolley Span 5164 790 4374 804 790 14 Completed 340 0 340 03-03-2021 160 149 11
Completed
24 Jumper Erection Nos. 354 354 0 Completed 03-03-2021 83 83 0
25 SED Cheking Nos. 5157 763 4394 804 763 41 25-02-2021 340 0 340 06-03-2021 160 147 13 25-02-2021
26 ATD Adjustment Nos. 512 80 432 80 80 0 25-02-2021 32 0 32 06-03-2021 17 17 0 25-02-2021
27 ATD joint Checking Nos. 512 76 436 80 76 4 25-02-2021 32 0 32 06-03-2021 17 13 4 25-02-2021
28 Section Insulator erection Nos. 49 8 41 8 8 0 Completed 2 0 2 04-03-2021 0 0 0 No scope
29 AT Erection Nos. 30 6 24 6 6 0 Completed 1 0 1 04-03-2021 1 1 0 Completed
30 Isolator erection Nos. 64 10 54 10 10 0 Completed 3 0 3 04-03-2021 1 1 0 Completed
31 PTFE Nos. 5 0 5 1 0 1 0 0 0 NO SCOPE 1 0 1
32 No. plate erection Nos. 4313 701 3612 701 701 0 Completed 266 0 266 01-03-2021 137 137 0 Completed
33 Tower Car Checking Span 5157 593 4564 804 593 211 25-02-2021 340 0 340 160 27 133 25-02-2021
34 AT Joint Check Nos. 30 6 24 6 6 0 Completed 1 0 1 12-03-2021 1 1 0 Completed

35 Switching stations Nos. 17 0 17 4 0 4 1 0 5 31/01/2021 1 0 1 Drawing Not Approved


COMPLETE PROJECT
STATUS SECTION
WISE (AK-PAU)

SVW YARD(Km 749-752) SVW-BSQ(752-759) BSQ YARD(Km 760-762)

Sr
ACTIVITIES UOM

Executed

Executed

Executed
Remarks

Remarks

Remarks
Balance

Balance

Balance
no

Total

Total

Total
TDC

TDC

TDC
1 LOP TKM 6.257 6.257 0 Completed 7.984 7.984 0.000 Completed 3.988 3.988 0.000 Completed
2 CSD TKM 6.257 6.257 0 Completed 7.984 7.984 0.000 Completed 3.988 3.988 0.000 Completed
3 SED TKM 6.257 6.257 0.000 Completed 7.984 7.984 0.000 Completed 3.988 3.988 0.000 Completed

4 Main Foundations Nos. 125 125 0 Completed 131 131 0 Completed 73 73 0 Completed

5 Anchor Foundation Nos. 26 26 0 Completed 30 30 0 Completed 16 16 0 Completed

6 Mast/Upright Erection Nos. 125 125 0 Completed 131 131 0 Completed 73 73 0 Completed
7 Dwarf mast erection Nos. 9 9 0 Completed 0 0 0 2 2 0 Completed
8 Bridge Mast BOLT Grouting Nos. 0 0 0 No scope 2 2 0 Completed 0 0 0
No Scope
9 Bridge Mast Erection Nos. 0 0 0 No scope 2 2 0 Completed 0 0 0
10 Grouting Nos. 125 125 0 Completed 131 131 0 Completed 73 73 0 Completed
11 Boom Erection Nos. 8 8 0 Completed 0 0 0 No scope 2 2 0 Completed
12 Bond Erection
a Structure Bond Erection Nos. 125 125 0 Completed 185 185 0 Completed 110 110 0 Completed
13 Bracket Erection Nos. 141 141 0 Completed 148 148 0 Completed 82 82 0 Completed
14 Guy rod erection Nos. 24 24 0 Completed 30 30 0 Completed 16 16 0 Completed
15 DA erection Nos. 14 14 0 Completed 0 0 0 No scope 2 2 0 Completed
16 Anti Creep wiring Nos. 5 5 0 Completed 8 8 0 Completed 3 3 0 Completed
18 Catenary wire Slots 7 7 0 Completed 7 7 0 Completed 6 6 0 Completed
19 Contact wire Slots 7 7 0 Completed 7 7 0 Completed 6 6 0 Completed
20 ATD Erection Nos. 13 13 0 Completed 14 14 0 Completed 9 9 0 Completed
21 D & C TL shots 7 7 0 Completed 7 7 0 Completed 6 6 0 Completed
22 Bracket adjustment Nos. 141 141 0 Completed 148 148 0 Completed 82 82 0 Completed
23 Ladder Trolley Span 141 141 0 Completed 148 148 0 82 82 0 Completed
Completed
24 Jumper Erection Nos. 40 40 0 Completed 78 78 0 32 32 0 Completed
25 SED Cheking Nos. 141 116 25 25-02-2021 148 148 0 Completed 82 82 0 Completed
26 ATD Adjustment Nos. 13 13 0 Completed 14 14 0 Completed 9 9 0 Completed
27 ATD joint Checking Nos. 13 13 0 Completed 14 14 0 Completed 9 9 0 Completed
28 Section Insulator erection Nos. 4 4 0 Completed 0 0 0 No scope 2 2 0 Completed
29 AT Erection Nos. 1 1 0 Completed 0 0 0 No scope 3 3 0 Completed
30 Isolator erection Nos. 3 3 0 Completed 0 0 0 No scope 3 3 0 Completed
31 PTFE Nos. 0 0 0 No scope 0 0 0 No scope 0 0 0 No Scope
32 No. plate erection Nos. 125 125 0 Completed 133 133 0 Completed 70 70 0 Completed
33 Tower Car Checking Span 141 66 75 21-02-2021 148 148 0 Completed 82 82 0 Completed
34 AT Joint Check Nos. 1 1 0 Completed 0 0 0 No scope 3 3 0 Completed
Equipment , Equipment ,
Batteries & Batteries &
35 Switching stations Nos. 1 0 1 20-1-2021 Connectors to be
0 0 0 No scope 1 0 1 20-01-2021 Connectors to be
Received Received
COMPLETE PROJECT
STATUS SECTION
WISE (AK-PAU)

BSQ-LHD(Km 762-772) LHD YARD(Km 773-775) LHD-AMW(Km 776-784)

Sr
ACTIVITIES UOM

Executed

Executed

Executed
Remarks

Remarks

Remarks
Balance

Balance

Balance
no

Total

Total

Total
TDC

TDC

TDC
1 LOP TKM 10.001 10.001 0.000 COMPLETED 4.014 4.014 0.000 COMPLETED 8.985 8.985 0.000 COMPLETED
2 CSD TKM 10.001 10.001 0.000 COMPLETED 4.014 4.014 0.000 COMPLETED 8.985 8.985 0.000 COMPLETED
3 SED TKM 10.001 10.001 0.000 COMPLETED 4.014 4.014 0.000 COMPLETED 8.985 0 8.985
1.All Materials are to
4 Main Foundations Nos. 163 163 0 COMPLETED 73 73 0 COMPLETED 176 157 19 shifted by BRN due to
15/02/2021 High bank & no
approaches( 30 BRNS
5 Anchor Foundation Nos. 40 40 0 Completed 18 18 0 COMPLETED 37 32 5
Materials to be shifted)
6 Mast/Upright Erection Nos. 163 163 0 Completed 73 73 0 COMPLETED 176 115 61 12-02-2021
7 Dwarf mast erection Nos. 0 0 0 Completed 3 3 0 COMPLETED 0 0 0 NO SCOPE
8 Bridge Mast BOLT Grouting Nos. 0 0 0 NO SCOPE 0 0 0 NO SCOPE 0 0 0 NO SCOPE
9 Bridge Mast Erection Nos. 0 0 0 NO SCOPE 0 0 0 NO SCOPE 0 0 0 NO SCOPE
10 Grouting Nos. 163 163 0 Completed 73 73 0 COMPLETED 176 105 71 10-02-2021
11 Boom Erection Nos. 0 0 0 Completed 2 2 0 COMPLETED 0 0 0 -
12 Bond Erection
a Structure Bond Erection Nos. 203 203 0 Completed 90 90 0 COMPLETED 176 0 176 22-02-2021
13 Bracket Erection Nos. 186 186 0 Completed 84 84 0 COMPLETED 198 80 118 18-02-2021
14 Guy rod erection Nos. 35 35 0 Completed 17 17 0 COMPLETED 36 6 30 18-02-2021
15 DA erection Nos. 0 0 0 Completed 2 2 0 COMPLETED 0 0 0
16 Anti Creep wiring Nos. 10 10 0 Completed 4 4 0 COMPLETED 9 2 7 20-02-2021
18 Catenary wire Slots 10 10 0 Completed 6 6 0 COMPLETED 8 0 8 26-02-2021
19 Contact wire Slots 10 10 0 COMPLETED 6 6 0 COMPLETED 8 0 8 26-02-2021
20 ATD Erection Nos. 19 19 0 Completed 8 8 0 COMPLETED 18 0 18 28-02-2021
21 D & C TL shots 10 10 0 Completed 6 6 0 COMPLETED 8 0.8 7.2 01-03-2021
22 Bracket adjustment Nos. 186 186 0 COMPLETED 84 84 0 COMPLETED 198 0 198 03-03-2021
23 Ladder Trolley Span 186 186 0 Completed 84 84 0 03-03-2021
COMPLETED
24 Jumper Erection Nos. 99 99 0 COMPLETED 22 22 0 03-03-2021
25 SED Cheking Nos. 186 186 0 Completed 84 84 0 COMPLETED 198 0 198 06-03-2021
26 ATD Adjustment Nos. 19 19 0 Completed 8 8 0 COMPLETED 18 0 18 06-03-2021
27 ATD joint Checking Nos. 19 19 0 Completed 8 8 0 COMPLETED 18 0 18 06-03-2021
28 Section Insulator erection Nos. 0 0 0 NO SCOPE 2 2 0 COMPLETED 0 0 0 NO SCOPE
29 AT Erection Nos. 0 0 0 NO SCOPE 1 1 0 COMPLETED 0 0 0 NO SCOPE
30 Isolator erection Nos. 0 0 0 NO SCOPE 3 3 0 COMPLETED 0 0 0 NO SCOPE
31 PTFE Nos. 0 0 0 NO SCOPE 0 0 0 NO SCOPE 0 0 0 NO SCOPE
32 No. plate erection Nos. 163 163 0 Completed 73 73 0 COMPLETED 176 0 176 01-03-2021
33 Tower Car Checking Span 186 186 0 Completed 84 84 0 COMPLETED 198 0 198 10-03-2021
34 AT Joint Check Nos. 0 0 0 No scope 1 1 0 Completed 0 0 0 NO SCOPE

35 Switching stations Nos. 0 0 0 No Scope 1 0 1 Drawing not Approved


COMPLETE PROJECT
STATUS SECTION
WISE (AK-PAU)

AMW YARD(Km 785-787) AMW-JUK(Km 788-795) JUK YARD(Km 796-798) JUK-KXX(Km 799-808) KXX YARD(Km 809-810)

Sr
ACTIVITIES UOM

Executed

Executed

Executed

Executed

Executed
Remarks

Remarks

Remarks

Remarks

Remarks
Balance

Balance

Balance

Balance

Balance
no

Total

Total

Total

Total

Total
TDC
1 LOP TKM 5.238 5.238 0.000 7.970 7.970 0.000 4.237 4.237 0.000 10.008 10.008 0.000 3.019 3.019 0.000
2 CSD TKM 5.238 5.238 0.000 7.970 7.970 0.000 4.237 4.237 0.000 10.008 10.008 0.000 3.019 0.000 3.019
3 SED TKM 5.238 0 5.238 7.970 0.000 7.970 4.237 0.000 4.237 10.008 0.000 10.008 3.019 0.000 3.019

4 Main Foundations Nos. 91 91 0 152 90 62 71 58 13 181 140 41 54 53 1

5 Anchor Foundation Nos. 28 28 0 32 15 17 19 14 5 43 28 15 12 12 0

6 Mast/Upright Erection Nos. 91 47 44 12-02-2021 152 31 121 71 44 27 181 181 54 54


7 Dwarf mast erection Nos. 10 0 10 12-02-2021 0 0 0 3 3 0 0 2 2
8 Bridge Mast BOLT Grouting Nos.
9 Bridge Mast Erection Nos.
10 Grouting Nos. 93 38 55 12-02-2021 152 0 152 71 71 181 181 54 54
11 Boom Erection Nos. 22 0 22 17-02-2021 0 0 0 2 2 0 0 2 2
12 Bond Erection
a Structure Bond Erection Nos. 91 0 91 22-02-2021
13 Bracket Erection Nos. 142 0 142 20-02-2021 174 0 174 87 87 204 204 63 63
14 Guy rod erection Nos. 27 0 27 18-02-2021 32 0 32 19 19 43 43 12 12
15 DA erection Nos. 41 0 41 17-02-2021 0 0 0 2 2 0 0 2 2
16 Anti Creep wiring Nos. 4 0 4 20-02-2021 8 0 8 2 2 11 11 2 2
18 Catenary wire Slots 10 0 10 26-02-2021 8 0 8 7 7 11 11 4 4
19 Contact wire Slots 10 0 10 26-02-2021 8 0 8 7 7 11 11 4 4
20 ATD Erection Nos. 14 0 14 28-02-2021 15 0 15 9 9 22 22 7 7
21 D & C TL shots 142 0 142 01-03-2021 174 0 174 87 87 204 204 63 63
22 Bracket adjustment Nos. 142 0 142 03-03-2021 174 0 174 87 87 204 204 63 63
23 Ladder Trolley Span 03-03-2021
24 Jumper Erection Nos. 03-03-2021
25 SED Cheking Nos. 142 0 142 06-03-2021 174 0 174 87 87 204 204 63 63
26 ATD Adjustment Nos. 14 0 14 06-03-2021 15 0 15 9 9 22 22 7 7
27 ATD joint Checking Nos. 14 0 14 06-03-2021 15 0 15 9 9 22 22 7 7
28 Section Insulator erection Nos. 2 0 2 04-03-2021 0 0 0 2 2 0 0 2 2
29 AT Erection Nos. 1 0 1 04-03-2021 0 0 0 2 2 0 0 1 1
30 Isolator erection Nos. 3 0 3 04-03-2021 0 0 0 3 3 0 0 3 3
31 PTFE Nos. 0 0 0 NO SCOPE 0 0 0 0 0 1 1 0 0
32 No. plate erection Nos. 90 0 90 01-03-2021 152 0 152 71 71 181 181 54 54
33 Tower Car Checking Span 142 0 142 10-03-2021 174 0 174 87 87 204 204 63 63
34 AT Joint Check Nos. 1 0 1 12-03-2021 0 0 0 2 2 0 0 1 1

35 Switching stations Nos. Drawing not Approved


1 1
COMPLETE PROJECT
STATUS SECTION
WISE (AK-PAU)

KXX-WHM (Km 811-818) WHM YARD(Km 819-821) WHM-KKG(Km 822-828) KKG YARD(Km 829-831) KKG-PGG PGG YARD

Sr
ACTIVITIES UOM

Executed

Executed

Executed

Executed

Executed

Executed
Remarks

Remarks

Remarks

Remarks

Remarks

Remarks
Balance

Balance

Balance

Balance

Balance

Balance
no

Total

Total

Total

Total

Total

Total
1 LOP TKM 8.032 8.032 0.000 6.865 0.000 6.865 7.000 7.000 0.000 4.358 4.358 0.000 4.000 4.000 0.000 4.221 4.221 0.000
2 CSD TKM 8.032 8.032 0.000 6.865 0.000 6.865 7.000 7.000 0.000 4.358 0.000 4.358 4.000 0.000 4.000 4.221 0.000 4.221
3 SED TKM 8.032 0.000 8.032 6.865 0.000 6.865 7.000 0.000 7.000 4.358 0.000 4.358 4.000 0.000 4.000 4.221 0.000 4.221

4 Main Foundations Nos. 123 121 2 115 35 80 125 99 26 92 0 92 62 62 87 87

5 Anchor Foundation Nos. 30 30 0 30 9 21 27 21 6 20 0 20 14 14 20 20

6 Mast/Upright Erection Nos. 123 123 115 115 125 125 92 92 62 62 87 87


7 Dwarf mast erection Nos. 0 0 8 8 0 0 2 2 0 0 2 2
8 Bridge Mast BOLT Grouting Nos.
9 Bridge Mast Erection Nos.
10 Grouting Nos. 123 123 115 115 125 125 92 92 62 62 87 87
11 Boom Erection Nos. 0 0 22 22 0 0 2 2 0 0 2 2
12 Bond Erection
a Structure Bond Erection Nos.
13 Bracket Erection Nos. 138 138 155 155 139 139 108 108 68 68 101 101
14 Guy rod erection Nos. 30 30 30 30 27 27 20 20 14 14 20 20
15 DA erection Nos. 0 0 43 43 0 0 2 2 0 0 2 2
16 Anti Creep wiring Nos. 8 8 5 5 7 7 3 3 4 4 3 3
18 Catenary wire Slots 7 7 8 8 7 7 6 6 4 4 7 7
19 Contact wire Slots 7 7 8 8 7 7 6 6 4 4 7 7
20 ATD Erection Nos. 14 14 16 16 13 13 11 11 6 6 10 10
21 D & C TL shots 138 138 155 155 139 139 108 108 68 68 101 101
22 Bracket adjustment Nos. 138 138 155 155 139 139 108 108 68 68 101 101
23 Ladder Trolley Span
24 Jumper Erection Nos.
25 SED Cheking Nos. 138 138 155 155 139 139 108 108 68 68 101 101
26 ATD Adjustment Nos. 14 14 16 16 13 13 11 11 6 6 10 10
27 ATD joint Checking Nos. 14 14 16 16 13 13 11 11 6 6 10 10
28 Section Insulator erection Nos. 0 0 3 3 0 0 2 2 0 0 2 2
29 AT Erection Nos. 0 0 2 2 0 0 1 1 0 0 1 1
30 Isolator erection Nos. 0 0 3 3 0 0 3 3 0 0 3 3
31 PTFE Nos. 0 0 0 0 0 0 0 0 0 0 0 0
32 No. plate erection Nos. 123 123 115 115 125 125 92 92 62 62 87 87
33 Tower Car Checking Span 138 138 155 155 139 139 108 108 68 68 101 101
34 AT Joint Check Nos. 0 0 2 2 0 0 1 1 0 0 1 1

35 Switching stations Nos.

You might also like