You are on page 1of 6

THB KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17)

IndianOil
Client: M/s IHB Ltd.

PMC; INDIAN OIL CORPORATION LIMITED

cONTRACTOR: M/S Spur Infrastructure Pvt. Ltd.


Doc. No.SIPL-IHB-KGPL Gr. 17-ML-JP-13 IR-O1

INSPECTION REPORT FOR LIQUID PENETRANT TEST

Report No.
MATERIAL APLSL Xul
Dwel Time: /o m IN
Date: S111 2ea
DIAWT /2-15"
Observation/ REMARKS
Weld No.
Sr No Pipe No.
Results

1E2 1823(14,it29Si5 km-3o oh Memt T oli Cá SHS1) RSSL


Hoh_ U no

Details for Materials


Cleaner: C u299
Penaetrant:
Developer: CDU 2

CHECKED & VERIFIED BY

FOR SIPL FOR & on behalf of EPMC

Sign
Sign 4d-A
| Name

Name M NJasln MADANN KUMAR (CA ng


Date
Date e1/0/2pr o1/02/2022
IHB KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17)
AC

IndianOil
Client M/s lHB Ltd.

PMC; INDIAN OIL CORPORATION LIMITED

cONTRA OR: M/S Spur Infrastructure Pvt. Ltd.

Doc. No.SIPL-IHB-KGPL Gr.17-ML-JP-13 IR-O1

INSPECTION REPORT FOR LIQUID PENETRANT TESST

MATERIAL TESTXYT Report No. 2


Dwel Time:
DIAWNT Date
2
No Pipe No. Weld No.
Observation/ REMARKS
|Sr.
Results
CM 9 o 7 Rebe ant Tholi atio (HE) CIRs, s
8sSD,| E2/E2 8 6 M-09
Ne aut TioCa Hoy (u4) S
EL/E 284o, /Er/sr78 3 | o elrtud Tholila-(yS) RP
E E 23/19,1E2/E 198 S11 No vaut Tiol CA ( 1 7 SL

Se2/E 279lo, 1¢2/E 23/1 C kelevant Lh diCa-

Details for Materials


Cleaner CACu 299

Penaetrant: CADU24?
Developer C D 23

CHECKED && VERIFIED BY


FOR SIPL FOR & on behalf of EPMC

(Sign Sign
MMumai
Name M-MJlorwr Name
Date Date
MADAN KUMAR_[S.A:n
91 la1/2e22
THB KANDLA GORAKHPUR LPO PIPELINE PROJECT (G-17)
IndianOl
NR
RIYKATN 1MTED
SSr nfeetr Thure t Ltd
ONTRACTOR
h Na PL HR KOPL Gr17ML IP 13IR O
INSPECT1ON REPORT FOR LIQUID PENETRANT TEST
Report No
A
A Date
Observation/ REMARKS
Pipe No Weld No.
Results
70 b tWa Tu olu Ca
C4 15)LP
- 6) ae
GS 16, '2Acj1 13 -
be!
prtsfor Matrnale
2 9
Peaaett
Devesepe
CHECKED &VERIFIED BY
FOR SIPL FOR& on behalf of EPMC
Sign
Namme
Na3 MADAN KAR(SA adf
Date
Date 8/e
HB KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17)

IndianOil
Client M/s IHB LId.

INDIAN OIL CORPORATiON LIMITED


PMC;
lnfrastructure Pvt. Ltd.
CONTRACTOR: M/S Spur
Doc. No.SIPL-IHB-KGPL Gr. 17-ML-JP- 13 IR-01

INSPECTION REPORT FOR LIQUID PENETRANT TEST

MATERIAL: PESLXu Report No. 2


Dwel Time: 0MLn Date: 26 i
DIAWT:
Observation/ REMARKS
Sr. No Pipe No. Weld No.
Results
E 2 t L8196,12)22334| K
KM- 16o Noh Reluvonnt
M-2 y
Dhic(14) CRs

Details for Materials


Cleaner CLC 29
Penaetrant: C u 2q8
Developer: (D 2q3

CHECKED & VERIFIED BY


FOR SIPL FOR & on behalf of EPMC
Sign
Sign MdA Himan
Name Name
Mld Ajoel/ye Himanshu kr Mishro
Date
Date
26 Ol202 2
THB T3UF131IP KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17)
IndianOil
Client: M/s IHB Ltd.
PMC; INDIAN OIL CORPORATION LIMITED
cONTRACTOR: M/S Spur Infrastructure Pvt. Ltd.
Doc. No.SIPL-IHB-KGPL Gr. 17-ML-JP- 13 IR-01
INSPECTION REPORT FOR LIQUID PENETRANT TEST
MATERIAL:
Dwel Time:
PTESLYu60MENN
Report No.
Date:
DIA/ WT
Observation/ REMARKKS
Sr. No Pipe No. Weld No.
Results
M- S 9
eKovyt Dhdce() RLof
M-IS0 o Kow u t LbdCa | ( si)L{%-3LP|
M-y
Details for Materials
Cleaner:
Penaetrant:
Developer
CHECKED VERIFIED BY
FOR SIPL
FOR& on behalf of EPMC
Sign M- |Sign
Name Md Ajelfama Name
umanhy_Kunay Mishza-
Date Date
24/012o 22
THB KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17)

IndianOil
Client M/s IHB Ltd.

PMC; INDIAN OIL CORPORATION LIMITED


cONTRACTOR: M/S Spur Infrastructure Pvt. Ltd.
Gr.17-ML-JP-13 IR-01
Doc. No.SIPL-IHB-KGPL

PENETRANT TEST
INSPECTION REPORT FOR LIQUID

MATERIAL PESLxY Report No. 19


Dwel Time: oN IN Date:
DIA/WT
Observation/
REMARKs
No Pipe No. Weld No.
Sr. Results
NoNRelvat DdCa -|( u r-y)RelaP|
M oCa-
M 1 4) RS Poke

Details for Materials


Cleaner:
Penaetrant:
Developer :

CHECKED & VERIFIED BY

FOR SIPLL FOR& on behalf of EPMC

Sign
Sign
Punan
Name |Name
Kumanhu kumaY Mishra
Date Date
3/1 202 2

You might also like