PROJECT Sri Komuravelly Mallanna Sagar ReserviorWork.

From Km: 8.425 to 12.665 with the reach-3 at km 12.665


&Adjoining
CLIENT Irrigation Department.(Kaleshwararam Project)
CONTRACTOR M/s. L&T PRASAD -RK INFRA(JV),
FIELD DENSITY TEST (CORE CUTTER)AS PER IS 2720 Part 29

AREA: lo 12to9 00 DATE 27 lo o


DESCRIPTION OFWORK: OIS CaRS Soi1 a f . 204e-
REF.DWG.NO:
SORCE: am2 oo& MDD g/cc180 OMC:1 O %
LAYER THICKNESS22mm LAYER N0: REDUCED LEVEL

S.NO DESCRIPTION DESCRIPTION


Chainge 100od to lo 3 4 6
Offset irom Bund Center Line 3SM38M|
1 CORECUTTER NO
Wt.of core cutter Vw1 gm 9263
3Wi of core cuter+Wet SoilW2 gm 31T63120
4 Wt of wet soil W3=W2-W1 gm
Volume of core cutter V cum
21&421
o /021|
Bulk density rb Y=w3/v gm/cc 2 122:12
Wt of wet Soilsample+container W4
8Wt of dry Soil sample+container W4
9Wi of water W6=(W4-W5)
10 Rapid Moisture Metere Reading
11 Moisturecontent W%wEwA-W5)-(W5-W6)x10020 4 99
12 Dry density Y=Y1+w) gm/cc
13 Maximum Dry density as per lab results Yo max|-H 8
|14 % of compaction 4.90382
15 Avg. Compaction

REMARKS DVe Hoistu On do OWSee i *o Le dor


eeenameminm nrevswum

beoreTO
QA/QC DE EE
Contractor's Representative Construction Construction Construction
M/s. L&T-PRASAD -RK INFRA(JV)

DE
Quatity Control Quality Control Quality Control
PROJECT
www

Sri Komuravelly Mallanna Sagar Reservior Work.


From Km: 8.425 to 12.665 &Adjoining with the reach-3 at km 12.665
CLIENT Irrigation Department (Kaleshwararam Project)
CONTRACTOR M/s. L&T-PRASAD -RK INFRA(JV),www.

FIELD DENSITY TEST (CORE CUTTERJAS PER Is 2720 Part 29


AREA lo to 99 DATE 27 1 22
DESCRIPTION OF WORK: ULS Casi So fle 2o3
REF.DWG No
SORDE: enk MDD: g/cc .88o OMC:1 %
LAYER THICKNESS: 22SM LAYER NO: REDUCED LEVEL
AN

S.NO DESCRIPTION DESCRIPTION


Chainge
Offset from Bund Center Line eo oo
CORE CUTTER NO 3
2 Wt.of core cutter W1 gm
3 Wt ofcore cutter + Wet Soil W2 gm
28
4 Wt of wet soil W3=W2-W1 gm
* * *********** aRS*******

5 Volume.of core utter Vcum ****"*

6 Bulk density rb Y=w3Ni gm/cc 2-029216|


Wt of wet Soil sample+containerW4
8 Wi of dryScil sampletcontainer W4
9 Wi ofwater Wô=(W4-W5)
10 Rapid Moisture Metere Reading
|11 Moisture contentW% w=(w4-w5)-(w5-w6)x100.Rl2:
12 Dry density Y = Y/(1+w) gm/cc

13 Maximum Dry density as per lab results Yamax soK


14 %of cormpaction
15 Avg.Compaetion
REMARKS:

QA/QC DE EF
Contractor's Representative Construction Construction Construction
M/s. L&T-PRASAD -RK INFRA (JV)

DE
Quality Control Quality Control Quality Control