2. Method of Work
Access SCS Gateway IPC from EPC/HMI PC with administrator credentials.
Simulates the BPS Measurement Values & Signals from Gateway /field and monitored at BPS
SCS & Communicating with Thales Engineer for Measurements & Signals Received at Thales
SCADA for verification.
All IEC Address to be tested & verified from BPS SCS Data base to Thales(SCADA) as per Thales
IO mapping list.
3. Work Party
This section must describe roles & responsibilities within work group.
NO. OF STAFF
ROLE PROFICIENCY/ COMPETENCE
REQUIRED
Engineer / Supervisor / Foreman
Person In Charge (PIC) Supervisor 1 Trained PIC
Competent to perform the work
Engineer 1
13 JAN 2020
4. Emergency Procedure
RKH Access Planning Office
In case of an emergency ,PIC should inform the ICC Line Controller occur about the situation and
the staff/work party already instructed the safety training before entering /working at the work
site .that when emergency occur work party shall leave immediately leave the work site &
Proceed to stay assembly point
6. Product
NA
Scope of Work is SCS Testings. This don not have any enviormental impact .However all
material/Equipment will be manage accordingly and PIC will ensure proper housekeeping all the
time
9. Worksite Arrangement
Book in to the Security Supervisor on duty/SM & Book into the ICC
PIC has to perform the toolbox talk to the work group and define the risk Assessment and how to
recover it, in order to ensure that risk Assessment will be followed.
APPROVED
PERMIT TO WORK