You are on page 1of 2

Method Statement

1. Purpose and Scope of the Work


 The Scope & Purpose of this Method Statements is BPS Substation Control System(SCS Siemens)
to ICC SCADA Testing(Thales)

2. Method of Work
 Access SCS Gateway IPC from EPC/HMI PC with administrator credentials.
 Simulates the BPS Measurement Values & Signals from Gateway /field and monitored at BPS
SCS & Communicating with Thales Engineer for Measurements & Signals Received at Thales
SCADA for verification.
 All IEC Address to be tested & verified from BPS SCS Data base to Thales(SCADA) as per Thales
IO mapping list.

3. Work Party
This section must describe roles & responsibilities within work group.

NO. OF STAFF
ROLE PROFICIENCY/ COMPETENCE
REQUIRED
Engineer / Supervisor / Foreman
Person In Charge (PIC) Supervisor 1 Trained PIC
Competent to perform the work
Engineer 1

Technician 1 Skilled Technician


APPROVED
PERMIT TO WORK

PTW No. P2-2001-0409


_________

13 JAN 2020
4. Emergency Procedure
RKH Access Planning Office

 In case of an emergency ,PIC should inform the ICC Line Controller occur about the situation and
the staff/work party already instructed the safety training before entering /working at the work
site .that when emergency occur work party shall leave immediately leave the work site &
Proceed to stay assembly point

5. Personal Protective Equipment (PPE)


 PPE should be complied as per site activity.

 Helmet, Safety Shoes, Safety Goggles, Reflecter Vest

6. Product
NA

LEADING EXCELLENCE │ CMS Ref.: SP-S200-F003, Rev. 1.0, 01/04/2018 Page 1 of 2


Printed copy is uncontrolled and only valid at the time of printing. Always refer online for the latest approved revision.
Method Statement

7. Tools, Plant and Equipmen


 Multimeter, Laptop, Lan cables

8. Environmental Aspects and Impacts


 All personnel should apply Health and Sanitation requirements and maintain a good
housekeeping on site.

 Scope of Work is SCS Testings. This don not have any enviormental impact .However all
material/Equipment will be manage accordingly and PIC will ensure proper housekeeping all the
time

9. Worksite Arrangement
 Book in to the Security Supervisor on duty/SM & Book into the ICC

 PIC has to perform the toolbox talk to the work group and define the risk Assessment and how to
recover it, in order to ensure that risk Assessment will be followed.

 PIC will make sure to check the PPE’s of the workgroup

10. Handback Arrangement


 Before leaving the worksite, PIC/work party will do the proper housekeeping, ensure no waste
and trash are left on the worksite. After performing proper housekeeping PIC will call ICC and
book-out with ICC.

APPROVED
PERMIT TO WORK

PTW No. P2-2001-0409


_________
13 JAN 2020
RKH Access Planning Office

LEADING EXCELLENCE │ CMS Ref.: SP-S200-F003, Rev. 1.0, 01/04/2018 Page 2 of 2


Printed copy is uncontrolled and only valid at the time of printing. Always refer online for the latest approved revision.

You might also like