As we know that :
Ti = 175 ̊F = 635 ̊R
Pi = 3000 psia
ɣg = 0.60 (air = 1)
h = 10 ft
ɸ = 10% = 0.1
Swi = 35% = 0.35
Ppc = 780
Tpc = 350
z = 0.89
Answer :
Ppr = 3.84615
Tpr = 1.81429
Bgi = 0.00533
A = 75298.0
No. 2 :
Grafik :
As we know that :
Ps, psi z p/z GP
2080 0.759 2740 0
1885 0.767 2458 6873 3000
1620 0.787 2058 14002
1205 0.828 1455 23687
2500
888 0.866 1025 31009
645 0.9 717 36207
2000
Pi 2080 Psia
T asumsi=160 F 620 Ra 1500
P/Z
Za 1
Pa 500 Psia 1000
Answer :
500
a.) IGIP
0
0 10000
Slope (p/z)2 - (p/z)1
GP2 -GP1
-0.041
IGIP 66791.13
b.) Estimate the recocerable reserve at an Pa= 500 Psi, Za= 1.00 and Rf?
Rf 1 - (Bgi)/(Bga)
0.8175480769231
EUR IGIP * Rf
54604.960334146
P/Z vs GP
3000
2500
2000
1500 P/Z vs GP
P/Z
1000
500
0
0 10000 20000 30000 40000 50000 60000 70000
GP, mmscf
P/Z vs GP
No. 3 :
As we know that :
T res 640 ̊ a
R Pi 3400 psia
Gp 550 MMscf P 2400 psia
Ps.c 16 psia
Ts.c 540 ̊Ra Ppc 670
SG gas 0.66 Tpc 370
Pa 500 psia Z 0.88
Answer :
a.) IGIP
Ppr 5.0746
Tpr 1.7297
Bgi 0.004688
Bga 0.02593
Bgi 0.00468
Rf = 0.8 %
As we know that :
Question :
Answer
Ppr 5
Tpc 1.9
Bgi 0.00526
No. 5 :
As we know that :
Answer :
Bg 0.02827 * Z.T
P
= 0.0052667
IGIP 32000
Bg ###
Gp 16000
Z factor = 0,945