You are on page 1of 2
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS, (RAILWAY BOARD) 07 /Chg-11222-Nambering New Delhi, dated: 10.06.2016 The Generel Managers (Opis.) All ngia Railways Sub: Suvidho Trans Numbering Scheme. Ref: Railway Boars leterof even number dated 9109/2010 In terms of Commercial Circular No. 33 of 2018 nd as amended from time to time, Ministry ‘of Railways has decided tran Suvich trans based on dynamic Tare mechanism, In continuation of train numbering scheme/poliey issued vide Boer’ lester refered above, ‘Ministry of Raitways has decided tht all Suvidha ans shold be numbered a per the five digit tin numbering scheme to reflect the same in the ICMS and forthe convenience of the gene public aswel, withthe folowing evita |. The proposed renumbering of the Suvidha tain shall be known as “Suvidha Trains ‘Numbering Scheme” All Svidha trains will only bean with numerical ‘ae the “ist digi ‘3. The aumerical ‘2 shall be the second éigt of ive digit tenn numbering heme of Suvidha ens ‘4 The “hid digit inthe “Suvidha Trains Numbering Scheme” shall he the Zonal ode based on old alloted numbers prior to r-orgeization of the Zonal Railways n 20022003. To ‘ensure that no duplication as well as proper uilizatin ofthe ene series oF numbers take lace under the scheme, the parental 9 znal ava shall be the respective co-ordinate for other zonl railways whch were created and clubbed together withthe pent zonal lay ser 2002/2005 for distribution of such numbering scheme within the zeal railway cock Accordingly, distribution of zonal code shal he made as per the fllowing ‘S| Co.erdinating | Zonal Code | Zonal Cade | Tones cavered Wespecive No.) Railway (Four digit | _(Gve digit divisions as applicable) ~_| 1980 series) |_ 2008 series) 1] Genial Rai a t CRNCR WOR, ERC 2] Railay Boare 2 z Noto be utlsed unless spcifcllyperited by Board Board maybe approached for loument in wring, only when ‘he all the digits the sates have boon lied andra special situation aries, 3 | faster Rainy z z ECR ER 4 | Nontem Raiivay | 4 NR, NCR, NWR 3_[ NE QNF Railway | S&35 5 TNER, NFR, ECR © | Southem Ratiway [6 suelo SWR, SR 7 [SC Raliway 7 7 SCR SWE & [SE Railway = = |S, ECOR, SER [3] Wester Raina | 9 3 WE, WE iis 5. The Tour’ and “ih digit sal denote train number series. 6 The renumbering ofall Suvidha tans being run by various Zonal Railways may be done with “Advance Reservation Period (ARPY" or"No Booking Date” whichever i ether No new tripstentensions ofthe Suvidha trans should ke fred in the PRS except under the above “Savidha Train Numbering Scheme” with immediate eect All Zonal Railways (including KRCL) to comply and conf. tee 8a” Die, Caco aay Bod Copy to: |. PSOISr. PPSYPPSYPSs 10 CRB, MI; MM, ME, ML and FC for kind ifomaticn. 2. COM. CME, CEE, CCM (All Indian Railways) and MD/KRCL. AMIC, AM (IT), AM/Trafis, “AM(CRIS), AM/T&C EDIPM, EDICAIS, EDIFM, ED/&C, MDICRIS CAOMFOISINR, MDIRCTC, ADGIPR, EDIP, DIP

You might also like