You are on page 1of 1

Super Communication Express Way Class A&B

          0.471
TUNNEL SPECIFICATION DETAILS TUNNEL QTY CALCULATION DETAILS           2.732

From To Length m Given Data:


Tunnel‐1 000+600 000+800 200.00 Assume the outer dia (i.e. excavated) of the D‐Shaped tunnel (D)         17.760 m
Tunnel‐2 001+100 001+500 400.00 Assume thickness of the shotcrete            0.025 m
Assume thickness of the lining (t)           0.050 m
EXCAVATION OF CLASS A,B AND C ROCK  Inner dia (i.e. Finshed Shotcrete) of the D‐Shaped tunnel (Dshortcrete)
Shall be done in Two Stages. Top Heading and Benching =(17.76‐0.025x2)=         17.710 m
Inner dia (i.e. Finshed Lining) of the D‐Shaped tunnel (DLining)
EXCAVATION OF CLASS D ROCK =(17.76‐0.025x2‐0.05x2)=         17.610 m
Shall be done in Three Stages. Top Heading, Side Slashing and Benching.
General Equations:
FOREPOLING / SPLICING Area of the D‐Shaped Tunnel (A)=(0.471xD2)         148.544 Sq.m
Splicing be done with Deformed Reinforced Steel Bars Of Grade Fe500 and Nominal 
Perimeter of the D‐Shaped Tunnel (P)=(2.732xD)           48.524 m
Dia of 32mm

ROCK ANCHORS Consider the length of the D‐Shaped Tunnel (L)           110.00 m


Rock Anchors are 25mm dia with Anchor Plate (HYSD Bars)
The HYSD shall be chamfered at one end and other end shall be threaded with length 
Final Quantities:
of 100mm. To ensure Rock Bolt head to be covered with 50mm sprayed concrete
3
Quantity of rock excavation (Qrock) ((0.471x17.76²x110)=    16,339.84 m
3
SPRAYED CONCRETE Quantity ofshotcrete (Qshortcrete) (((0.471x17.76²)‐(0.471x17.71²))x110)=           91.87 m
3
Sprayed Concrete of Grade M30 with Poly Fiber Quantity ofconcrete lining (QLining) (((0.471x17.71²)‐(0.471x17.61²))x110)=         182.97 m
For CLASS A, B and C Rock Bolt Noʹs ((110/2)/2x6)+((110/2)/2x7)+7=         293.00 noʹs
After the deformation in the tunnel and after installing the Primary Rock support 
system and additional 50mm Thick layer of Concrete  shall be sprayed as Final 
Support/Lining.

For CLASS D GROUND WATER DRAINAGE
After the deformation in the tunnel and after installing the Primary Rock support  Where ever Dripping Water is encountered in the Crowniwalls during Excavation 300mm 
system and additional 300mm Thick PCC lining shall be provided as Final  additional Excavation shall be done to accommodate Waterproofing arrangement to Drain Out 
Support/Lining over the water proof membarane. Ground Water and PCC Lining.

You might also like