Professional Documents
Culture Documents
In relation to traffic
25 load, R > 600 m -2.5
20 -5
15 -7.5
5 -12.5
15 ¤
22 ¤
0 24 ¤ -15
0 10,000 30,000 50,000 70,000
20,000 40,000 60,000 80,000 Pad type SLB 3007G
Traffic load [total gross tons/day, track] Comparison – unpadded
Breakdown of standardised annual costs
Traffic load > 70,000 total gross tons/day, straight track
100 %
90 % All values derived
80 % from static calculations
(interest rate 0 %)
70 %
60 %
50 %
40 %
30 %
20 % Total LCC
Depreciation
10 %
Operational hindrance costs
0% Maintenance costs
AUSTRIA — Bürs GERMANY — Berlin — Munich — Stuttgart FRANCE — Lyon JORDAN — Amman
JAPAN — Tokyo INDIA — Pune CHINA — Beijing USA — Charlotte www.getzner.com