Professional Documents
Culture Documents
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder Rehabilitation and
(Rural Area) & two lane with paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh. (Rural Area)
ROAD FURNITURE
BC
DBM 4.07 KM
LHS
WMM TOP
GSB WIDENING UP TO TOP
SUBGRADE TOP
SITE CLEARENCE
CHAINAGE(KM) 0 500 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000
1500-2000
2000-2500
2500-3000
3000-3500
3500-4000
4000-4500
4500-5000
5000-5500
5500-6000
6000-6500
500-1000
0-500
CHAINAGE(M)
SITE CLEARENCE
SUBGRADE TOP
RHS
INDEX
SITE CLEARENCE
SUBGRADE TOP
GSB WIDENING UP TO TOP
WMM TOP
DBM
BC
ROAD FURNITURE
NOTE service road yet to start
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR C
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder Rehabilitation and up-gradati
(Rural Area) & two lane with paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh. Area) & two lane
14 KM
15+440
15+480
1
6500 7000 7500 8000 8500 9000 9500 10000 10500 11000 11500 12000 12500 13000 13500 14000 14500
10000-10500
10500-11000
11000-11500
11500-12000
12000-12500
12500-13000
13000-13500
13500-14000
14000-14500
14500-15000
9500-10000
6500-7000
7000-7500
7500-8000
8000-8500
8500-9000
9000-9500
1
15+480
15+440
14 KM
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
ilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural
Area) & two lane with paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
15+480
16 KM
15000 15500 16000 16500 17000 17500 18000 18500 19000 19500 20000 20500 21000
15000-15500
15500-16000
16000-16500
16500-17000
17000-17500
17500-18000
18000-18500
18500-19000
19000-19500
19500-20000
20000-20500
20500-21000
21000-21120
16 KM
15+480
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two
lane with paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
DUCT/DRAIN TCS-1/2
BC - 40 mm
DBM - 60 mm
WMM Top (125)mm
WMM -1 (125)mm
Service Road
GSB 200 mm
S/G Top (150)mm
S/G-2 (150)mm
S/G-1 (200)mm
DRAIN
BC
LHS
DBM
WMM TOP
GSB WIDENING UP TO TOP
SUBGRADE TOP
SITE CLEARENCE
484000-484010
484010-484020
484020-484030
484030-484040
484040-484050
484050-484060
484060-484070
484070-484080
484080-484090
484090-484100
CHAINAGE(M) As Per Schedule B
90-100
10-20
20-30
30-40
40-50
50-60
60-70
70-80
80-90
0-10
DISTANCE CHAINAGE (M)
SITE CLEARENCE
SUBGRADE TOP
GSB WIDENING UP TO TOP RHS
WMM TOP
DBM
BC
DRAIN
S/G-1 (200)mm
S/G-2 (150)mm
S/G Top (150)mm
GSB 200 mm
Service Road
WMM -1 (125)mm
WMM Top (125)mm
DBM - 60 mm
BC - 40 mm
DUCT/DRAIN
INDEX
SITE CLEARENCE
SUBGRADE TOP
GSB WIDENING UP TO TOP
WMM TOP
DBM
BC
ROAD FURNITURE
NOTE service road yet to start
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
(Rural Area) & two Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder
(Rural Area) & two lane with paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
100-110 484100-484110
110-120 484110-484120
120-130 484120-484130
130-140 484130-484140
140-150 484140-484150
150-160 484150-484160
160-170 484160-484170
170-180 484170-484180
180-190 484180-484190
190-200 484190-484200
200-210 484200-484210
210-220 484210-484220
220-230 484220-484230
230-240 484230-484240
240-250 484240-484250
250-260 484250-484260
260-270 484260-484270
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural
Area) & two lane with paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
270-280 484270-484280
280-290 484280-484290
290-300 484290-484300
300-310 484300-484310
310-320 484310-484320
320-330 484320-484330
330-340 484330-484340
340-350 484340-484350
350-360 484350-484360
360-370 484360-484370
370-380 484370-484380
380-390 484380-484390
390-400 484390-484400
400-410 484400-484410
410-420 484410-484420
420-430 484420-484430
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
430-440 484430-484440
440-450 484440-484450
450-460 484450-484460
460-470 484460-484470
470-480 484470-484480
480-490 484480-484490
490-500 484490-484500
500-510 484500-484510
510-520 484510-484520
520-530 484520-484530
530-540 484530-484540
540-550 484540-484550
550-560 484550-484560
560-570 484560-484570
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
570-580 484570-484580
580-590 484580-484590
590-600 484590-484600
600-610 484600-484610
610-620 484610-484620
620-630 484620-484630
630-640 484630-484640
640-650 484640-484650
650-660 484650-484660
660-670 484660-484670
670-680 484670-484680
680-690 484680-484690
690-700 484690-484700
700-710 484700-484710
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
710-720 484710-484720
720-730 484720-484730
730-740 484730-484740
740-750 484740-484750
750-760 484750-484760
760-770 484760-484770
770-780 484770-484780
780-790 484780-484790
790-800 484790-484800
800-810 484800-484810
810-820 484810-484820
820-830 484820-484830
830-840 484830-484840
840-850 484840-484850
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
850-860 484850-484860
860-870 484860-484870
870-880 484870-484880
880-890 484880-484890
890-900 484890-484900
900-910 484900-484910
910-920 484910-484920
920-930 484920-484930
930-940 484930-484940
940-950 484940-484950
950-960 484950-484960
960-970 484960-484970
970-980 484970-484980
980-990 484980-484990
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
990-1000 484990-485000
1000-1010 485000-485010
1010-1020 485010-485020
1020-1030 485020-485030
1030-1040 485030-485040
1040-1050 485040-485050
1050-1060 485050-485060
1060-1070 485060-485070
1070-1080 485070-485080
1080-1090 485080-485090
1090-1100 485090-485100
1100-1110 485100-485110
1110-1120 485110-485120
1120-1130 485120-485130
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
1130-1140 485130-485140
1140-1150 485140-485150
1150-1160 485150-485160
1160-1170 485160-485170
1170-1180 485170-485180
1180-1190 485180-485190
1190-1200 485190-485200
1200-1210 485200-485210
1210-1220 485210-485220
1220-1230 485220-485230
1230-1240 485230-485240
1240-1250 485240-485250
1250-1260 485250-485260
1260-1270 485260-485270
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
1270-1280 485270-485280
1280-1290 485280-485290
1290-1300 485290-485300
1300-1310 485300-485310
1310-1320 485310-485320
1320-1330 485320-485330
1330-1340 485330-485340
1340-1350 485340-485350
1350-1360 485350-485360
1360-1370 485360-485370
1370-1380 485370-485380
1380-1390 485380-485390
1390-1400 485390-485400
1400-1410 485400-485410
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
1410-1420 485410-485420
1420-1430 485420-485430
1430-1440 485430-485440
1440-1450 485440-485450
1450-1460 485450-485460
1460-1470 485460-485470
1470-1480 485470-485480
1480-1490 485480-485490
1490-1500 485490-485500
1500-1510 485500-485510
1510-1520 485510-485520
1520-1530 485520-485530
1530-1540 485530-485540
1540-1550 485540-485550
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
1560-1570 485560-485570
1570-1580 485570-485580
1580-1590 485580-485590
1590-1600 485590-485600
1600-1610 485600-485610
1610-1620 485610-485620
1620-1630 485620-485630
1630-1640 485630-485640
TCS -1(484+000 to 487+180) - 3.180 Km
1640-1650 485640-485650
1650-1660 485650-485660
1660-1670 485660-485670
1670-1680 485670-485680
1680-1690 485680-485690
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
1690-1700 485690-485700
1700-1710 485700-485710
1710-1720 485710-485720
1720-1730 485720-485730
1730-1740 485730-485740
1740-1750 485740-485750
1750-1760 485750-485760
1760-1770 485760-485770
1770-1780 485770-485780
1780-1790 485780-485790
1790-1800 485790-485800
1800-1810 485800-485810
1810-1820 485810-485820
1820-1830 485820-485830
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
1830-1840 485830-485840
1840-1850 485840-485850
1850-1860 485850-485860
1860-1870 485860-485870
1870-1880 485870-485880
1880-1890 485880-485890
1890-1900 485890-485900
1900-1910 485900-485910
1910-1920 485910-485920
1920-1930 485920-485930
1930-1940 485930-485940
1940-1950 485940-485950
1950-1960 485950-485960
1960-1970 485960-485970
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
1970-1980 485970-485980
1980-1990 485980-485990
1990-2000 485990-486000
2000-2010 486000-486010
2010-2020 486010-486020
2020-2030 486020-486030
2030-2040 486030-486040
2040-2050 486040-486050
2050-2060 486050-486060
2060-2070 486060-486070
2070-2080 486070-486080
2080-2090 486080-486090
2090-2100 486090-486100
2100-2110 486100-486110
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
2110-2120 486110-486120
2120-2130 486120-486130
2130-2140 486130-486140
2140-2150 486140-486150
2150-2160 486150-486160
2160-2170 486160-486170
2170-2180 486170-486180
2180-2190 486180-486190
2190-2200 486190-486200
2200-2210 486200-486210
2210-2220 486210-486220
2220-2230 486220-486230
2230-2240 486230-486240
2240-2250 486240-486250
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
2250-2260 486250-486260
2260-2270 486260-486270
2270-2280 486270-486280
2280-2290 486280-486290
2290-2300 486290-486300
2300-2310 486300-486310
2310-2320 486310-486320
2320-2330 486320-486330
2330-2340 486330-486340
2340-2350 486340-486350
2350-2360 486350-486360
2360-2370 486360-486370
2370-2380 486370-486380
2380-2390 486380-486390
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
2390-2400 486390-486400
2400-2410 486400-486410
2410-2420 486410-486420
2420-2430 486420-486430
2430-2440 486430-486440
2440-2450 486440-486450
2450-2460 486450-486460
2460-2470 486460-486470
2470-2480 486470-486480
2480-2490 486480-486490
2490-2500 486490-486500
2500-2510 486500-486510
2510-2520 486510-486520
2520-2530 486520-486530
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
2530-2540 486530-486540
2540-2550 486540-486550
2550-2560 486550-486560
2560-2570 486560-486570
2570-2580 486570-486580
2580-2590 486580-486590
2590-2600 486590-486600
2600-2610 486600-486610
2610-2620 486610-486620
2620-2630 486620-486630
2630-2640 486630-486640
2640-2650 486640-486650
2650-2660 486650-486660
2660-2670 486660-486670
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
2670-2680 486670-486680
2680-2690 486680-486690
2690-2700 486690-486700
2700-2710 486700-486710
2710-2720 486710-486720
2720-2730 486720-486730
2730-2740 486730-486740
2740-2750 486740-486750
2750-2760 486750-486760
2760-2770 486760-486770
2770-2780 486770-486780
2780-2790 486780-486790
2790-2800 486790-486800
2800-2810 486800-486810
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
2810-2820 486810-486820
2820-2830 486820-486830
2830-2840 486830-486840
2840-2850 486840-486850
2850-2860 486850-486860
2860-2870 486860-486870
2870-2880 486870-486880
2880-2890 486880-486890
2890-2900 486890-486900
2900-2910 486900-486910
2910-2920 486910-486920
2920-2930 486920-486930
2930-2940 486930-486940
2940-2950 486940-486950
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
2950-2960 486950-486960
2960-2970 486960-486970
2970-2980 486970-486980
2980-2990 486980-486990
2990-3000 486990-487000
3000-3010 487000-487010
3010-3020 487010-487020
3020-3030 487020-487030
3030-3040 487030-487040
3040-3050 487040-487050
3050-3060 487050-487060
3060-3070 487060-487070
3070-3080 487070-487080
3080-3090 487080-487090
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
MAJOR BRIDGE @
3090-3100 487090-487100
3100-3110 487100-487110
3110-3120 487110-487120
3120-3130 487120-487130
3130-3140 487130-487140
3140-3150 487140-487150
3150-3160 487150-487160
3160-3170 487160-487170
3170-3180 487170-487180
3180-3190 487180-487190
3190-3200 487190-487200
3200-3210 487200-487210
3210-3220 487210-487220
3220-3230 487220-487230
MAJOR BRIDGE @
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
3240-3250 487240-487250
3250-3260 487250-487260
3260-3270 487260-487270
3270-3280 487270-487280
3280-3290 487280-487290
3290-3300 487290-487300
3300-3310 487300-487310
3310-3320 487310-487320
R BRIDGE @487+180 to 487+340 = 160 M
3320-3330 487320-487330
3330-3340 487330-487340
3340-3350 487340-487350
3350-3360 487350-487360
3360-3370 487360-487370
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
3370-3380 487370-487380
3380-3390 487380-487390
3390-3400 487390-487400
3400-3410 487400-487410
3410-3420 487410-487420
3420-3430 487420-487430
3430-3440 487430-487440
3440-3450 487440-487450
3450-3460 487450-487460
3460-3470 487460-487470
3470-3480 487470-487480
3480-3490 487480-487490
3490-3500 487490-487500
3500-3510 487500-487510
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
3510-3520 487510-487520
3520-3530 487520-487530
3530-3540 487530-487540
3540-3550 487540-487550
3550-3560 487550-487560
3560-3570 487560-487570
3570-3580 487570-487580
3580-3590 487580-487590
3590-3600 487590-487600
3600-3610 487600-487610
3610-3620 487610-487620
3620-3630 487620-487630
3630-3640 487630-487640
3640-3650 487640-487650
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
3650-3660 487650-487660
3660-3670 487660-487670
3670-3680 487670-487680
3680-3690 487680-487690
3690-3700 487690-487700
3700-3710 487700-487710
3710-3720 487710-487720
3720-3730 487720-487730
3730-3740 487730-487740
3740-3750 487740-487750
3750-3760 487750-487760
3760-3770 487760-487770
3770-3780 487770-487780
3780-3790 487780-487790
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
3790-3800 487790-487800
3800-3810 487800-487810
3810-3820 487810-487820
3820-3830 487820-487830
3830-3840 487830-487840
3840-3850 487840-487850
3850-3860 487850-487860
3860-3870 487860-487870
3870-3880 487870-487880
3880-3890 487880-487890
3890-3900 487890-487900
3900-3910 487900-487910
3910-3920 487910-487920
3920-3930 487920-487930
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
3940-3950 487940-487950
3950-3960 487950-487960
3960-3970 487960-487970
3970-3980 487970-487980
3980-3990 487980-487990
3990-4000 487990-488000
4000-4010 488000-488010
4010-4020 488010-488020
4020-4030 488020-488030
4030-4040 488030-488040
4040-4050 488040-488050
4050-4060 488050-488060
4060-4070 488060-488070
TCS -1(484+340 to 488+800) - 1.460
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
4080-4090 488080-488090
4100-4110 488100-488110
4110-4120 488110-488120
4120-4130 488120-488130
4130-4140 488130-488140
4140-4150 488140-488150
4150-4160 488150-488160
4160-4170 488160-488170
4170-4180 488170-488180
4180-4190 488180-488190
4190-4200 488190-488200
4200-4210 488200-488210
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
4210-4220 488210-488220
4220-4230 488220-488230
4230-4240 488230-488240
4240-4250 488240-488250
4250-4260 488250-488260
4260-4270 488260-488270
4270-4280 488270-488280
4280-4290 488280-488290
4290-4300 488290-488300
4300-4310 488300-488310
4310-4320 488310-488320
4320-4330 488320-488330
4330-4340 488330-488340
4340-4350 488340-488350
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
4350-4360 488350-488360
4360-4370 488360-488370
4370-4380 488370-488380
4380-4390 488380-488390
4390-4400 488390-488400
4400-4410 488400-488410
4410-4420 488410-488420
4420-4430 488420-488430
4430-4440 488430-488440
4440-4450 488440-488450
4450-4460 488450-488460
4460-4470 488460-488470
4470-4480 488470-488480
4480-4490 488480-488490
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
4490-4500 488490-488500
4500-4510 488500-488510
4510-4520 488510-488520
4520-4530 488520-488530
4530-4540 488530-488540
4540-4550 488540-488550
4550-4560 488550-488560
4560-4570 488560-488570
4570-4580 488570-488580
4580-4590 488580-488590
4590-4600 488590-488600
4600-4610 488600-488610
4610-4620 488610-488620
4620-4630 488620-488630
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
4630-4640 488630-488640
4640-4650 488640-488650
4650-4660 488650-488660
4660-4670 488660-488670
4670-4680 488670-488680
4680-4690 488680-488690
4690-4700 488690-488700
4700-4710 488700-488710
4710-4720 488710-488720
4720-4730 488720-488730
4730-4740 488730-488740
4740-4750 488740-488750
4750-4760 488750-488760
4760-4770 488760-488770
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
4770-4780 488770-488780
4780-4790 488780-488790
4790-4800 488790-488800
4800-4810 488800-488810
4810-4820 488810-488820
4820-4830 488820-488830
4830-4840 488830-488840
4840-4850 488840-488850
4850-4860 488850-488860
4860-4870 488860-488870
4870-4880 488870-488880
4880-4890 488880-488890
4890-4900 488890-488900
4900-4910 488900-488910
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
4910-4920 488910-488920
4920-4930 488920-488930
4930-4940 488930-488940
4940-4950 488940-488950
4950-4960 488950-488960
4960-4970 488960-488970
4970-4980 488970-488980
4980-4990 488980-488990
4990-5000 488990-489000
5000-5010 489000-489010
5010-5020 489010-489020
5020-5030 489020-489030
5030-5040 489030-489040
5040-5050 489040-489050
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
5050-5060 489050-489060
5060-5070 489060-489070
5070-5080 489070-489080
5080-5090 489080-489090
5090-5100 489090-489100
5100-5110 489100-489110
5110-5120 489110-489120
5120-5130 489120-489130
5130-5140 489130-489140
5140-5150 489140-489150
5150-5160 489150-489160
5160-5170 489160-489170
5170-5180 489170-489180
5180-5190 489180-489190
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
5200-5210 489200-489210
5210-5220 489210-489220
5220-5230 489220-489230
5230-5240 489230-489240
5240-5250 489240-489250
5250-5260 489250-489260
5260-5270 489260-489270
5270-5280 489270-489280
5280-5290 489280-489290
5290-5300 489290-489300
5300-5310 489300-489310
5310-5320 489310-489320
5320-5330 489320-489330
TCS -2 (488+800 to 489+800) - 1.0 Km
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
0) - 1.0 Km
5330-5340 489330-489340
0) - 1.0 Km
5340-5350 489340-489350
5350-5360 489350-489360
5360-5370 489360-489370
5370-5380 489370-489380
5380-5390 489380-489390
5390-5400 489390-489400
5400-5410 489400-489410
5410-5420 489410-489420
5420-5430 489420-489430
5430-5440 489430-489440
5440-5450 489440-489450
5450-5460 489450-489460
5460-5470 489460-489470
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
5470-5480 489470-489480
5480-5490 489480-489490
5490-5500 489490-489500
5500-5510 489500-489510
5510-5520 489510-489520
5520-5530 489520-489530
5530-5540 489530-489540
5540-5550 489540-489550
5550-5560 489550-489560
5560-5570 489560-489570
5570-5580 489570-489580
5580-5590 489580-489590
5590-5600 489590-489600
5600-5610 489600-489610
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
5610-5620 489610-489620
5620-5630 489620-489630
5630-5640 489630-489640
5640-5650 489640-489650
5650-5660 489650-489660
5660-5670 489660-489670
5670-5680 489670-489680
5680-5690 489680-489690
5690-5700 489690-489700
5700-5710 489700-489710
5710-5720 489710-489720
5720-5730 489720-489730
5730-5740 489730-489740
5740-5750 489740-489750
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
5750-5760 489750-489760
5760-5770 489760-489770
5770-5780 489770-489780
5780-5790 489780-489790
5790-5800 489790-489800
5800-5810 489800-489810
5810-5820 489810-489820
5820-5830 489820-489830
5830-5840 489830-489840
5840-5850 489840-489850
5850-5860 489850-489860
5860-5870 489860-489870
5870-5880 489870-489880
5880-5890 489880-489890
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
5890-5900 489890-489900
5900-5910 489900-489910
5910-5920 489910-489920
5920-5930 489920-489930
5930-5940 489930-489940
5940-5950 489940-489950
5950-5960 489950-489960
5960-5970 489960-489970
5970-5980 489970-489980
5980-5990 489980-489990
5990-6000 489990-490000
6000-6010 490000-490010
6010-6020 490010-490020
6020-6030 490020-490030
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
6030-6040 490030-490040
6040-6050 490040-490050
6050-6060 490050-490060
6060-6070 490060-490070
6070-6080 490070-490080
6080-6090 490080-490090
6090-6100 490090-490100
6100-6110 490100-490110
6110-6120 490110-490120
6120-6130 490120-490130
6130-6140 490130-490140
6140-6150 490140-490150
6150-6160 490150-490160
6160-6170 490160-490170
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
6170-6180 490170-490180
6180-6190 490180-490190
6190-6200 490190-490200
6200-6210 490200-490210
6210-6220 490210-490220
6220-6230 490220-490230
6230-6240 490230-490240
6240-6250 490240-490250
6250-6260 490250-490260
6260-6270 490260-490270
6270-6280 490270-490280
6280-6290 490280-490290
6290-6300 490290-490300
6300-6310 490300-490310
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
6310-6320 490310-490320
6320-6330 490320-490330
6330-6340 490330-490340
6340-6350 490340-490350
6350-6360 490350-490360
6360-6370 490360-490370
6370-6380 490370-490380
6380-6390 490380-490390
6390-6400 490390-490400
6400-6410 490400-490410
6410-6420 490410-490420
6420-6430 490420-490430
6430-6440 490430-490440
6440-6450 490440-490450
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
6460-6470 490460-490470
6470-6480 490470-490480
6480-6490 490480-490490
6490-6500 490490-490500
6500-6510 490500-490510
6510-6520 490510-490520
6520-6530 490520-490530
6530-6540 490530-490540
6540-6550 490540-490550
6550-6560 490550-490560
6560-6570 490560-490570
TCS -1 (489+800 to 496+640) - 6.84 Km
6570-6580 490570-490580
6580-6590 490580-490590
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
6590-6600 490590-490600
6600-6610 490600-490610
6610-6620 490610-490620
6620-6630 490620-490630
6630-6640 490630-490640
6640-6650 490640-490650
6650-6660 490650-490660
6660-6670 490660-490670
6670-6680 490670-490680
6680-6690 490680-490690
6690-6700 490690-490700
6700-6710 490700-490710
6710-6720 490710-490720
6720-6730 490720-490730
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
6730-6740 490730-490740
6740-6750 490740-490750
6750-6760 490750-490760
6760-6770 490760-490770
6770-6780 490770-490780
6780-6790 490780-490790
6790-6800 490790-490800
6800-6810 490800-490810
6810-6820 490810-490820
6820-6830 490820-490830
6830-6840 490830-490840
6840-6850 490840-490850
6850-6860 490850-490860
6860-6870 490860-490870
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
6870-6880 490870-490880
6880-6890 490880-490890
6890-6900 490890-490900
6900-6910 490900-490910
6910-6920 490910-490920
6920-6930 490920-490930
6930-6940 490930-490940
6940-6950 490940-490950
6950-6960 490950-490960
6960-6970 490960-490970
6970-6980 490970-490980
6980-6990 490980-490990
6990-7000 490990-491000
7000-7010 491000-491010
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
7010-7020 491010-491020
7020-7030 491020-491030
7030-7040 491030-491040
7040-7050 491040-491050
7050-7060 491050-491060
7060-7070 491060-491070
7070-7080 491070-491080
7080-7090 491080-491090
7090-7100 491090-491100
7100-7110 491100-491110
7110-7120 491110-491120
7120-7130 491120-491130
7130-7140 491130-491140
7140-7150 491140-491150
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
7150-7160 491150-491160
7160-7170 491160-491170
7170-7180 491170-491180
7180-7190 491180-491190
7190-7200 491190-491200
7200-7210 491200-491210
7210-7220 491210-491220
7220-7230 491220-491230
7230-7240 491230-491240
7240-7250 491240-491250
7250-7260 491250-491260
7260-7270 491260-491270
7270-7280 491270-491280
7280-7290 491280-491290
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
7290-7300 491290-491300
7300-7310 491300-491310
7310-7320 491310-491320
7320-7330 491320-491330
7330-7340 491330-491340
7340-7350 491340-491350
7350-7360 491350-491360
7360-7370 491360-491370
7370-7380 491370-491380
7380-7390 491380-491390
7390-7400 491390-491400
7400-7410 491400-491410
7410-7420 491410-491420
7420-7430 491420-491430
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
7430-7440 491430-491440
7440-7450 491440-491450
7450-7460 491450-491460
7460-7470 491460-491470
7470-7480 491470-491480
7480-7490 491480-491490
7490-7500 491490-491500
7500-7510 491500-491510
7510-7520 491510-491520
7520-7530 491520-491530
7530-7540 491530-491540
7540-7550 491540-491550
7550-7560 491550-491560
7560-7570 491560-491570
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
7570-7580 491570-491580
7580-7590 491580-491590
7590-7600 491590-491600
7600-7610 491600-491610
7610-7620 491610-491620
7620-7630 491620-491630
7630-7640 491630-491640
7640-7650 491640-491650
7650-7660 491650-491660
7660-7670 491660-491670
7670-7680 491670-491680
7680-7690 491680-491690
7690-7700 491690-491700
7700-7710 491700-491710
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
7710-7720 491710-491720
7720-7730 491720-491730
7730-7740 491730-491740
7740-7750 491740-491750
7750-7760 491750-491760
7760-7770 491760-491770
7770-7780 491770-491780
7780-7790 491780-491790
7790-7800 491790-491800
7800-7810 491800-491810
7810-7820 491810-491820
7820-7830 491820-491830
7830-7840 491830-491840
7840-7850 491840-491850
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
7850-7860 491850-491860
7860-7870 491860-491870
7870-7880 491870-491880
7880-7890 491880-491890
7890-7900 491890-491900
7900-7910 491900-491910
7910-7920 491910-491920
7920-7930 491920-491930
7930-7940 491930-491940
7940-7950 491940-491950
7950-7960 491950-491960
7960-7970 491960-491970
7970-7980 491970-491980
7980-7990 491980-491990
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
7990-8000 491990-492000
8000-8010 492000-492010
8010-8020 492010-492020
8020-8030 492020-492030
8030-8040 492030-492040
8040-8050 492040-492050
8050-8060 492050-492060
8060-8070 492060-492070
8070-8080 492070-492080
8080-8090 492080-492090
8090-8100 492090-492100
8100-8110 492100-492110
8110-8120 492110-492120
8120-8130 492120-492130
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
8130-8140 492130-492140
8140-8150 492140-492150
8150-8160 492150-492160
8160-8170 492160-492170
8170-8180 492170-492180
8180-8190 492180-492190
8190-8200 492190-492200
8200-8210 492200-492210
8210-8220 492210-492220
8220-8230 492220-492230
8230-8240 492230-492240
8240-8250 492240-492250
8250-8260 492250-492260
8260-8270 492260-492270
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
8270-8280 492270-492280
8280-8290 492280-492290
8290-8300 492290-492300
8300-8310 492300-492310
8310-8320 492310-492320
8320-8330 492320-492330
8330-8340 492330-492340
8340-8350 492340-492350
8350-8360 492350-492360
8360-8370 492360-492370
8370-8380 492370-492380
8380-8390 492380-492390
8390-8400 492390-492400
8400-8410 492400-492410
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
8410-8420 492410-492420
8420-8430 492420-492430
8430-8440 492430-492440
8440-8450 492440-492450
8450-8460 492450-492460
8460-8470 492460-492470
8470-8480 492470-492480
8480-8490 492480-492490
8490-8500 492490-492500
8500-8510 492500-492510
8510-8520 492510-492520
8520-8530 492520-492530
8530-8540 492530-492540
8540-8550 492540-492550
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
8550-8560 492550-492560
8560-8570 492560-492570
8570-8580 492570-492580
8580-8590 492580-492590
8590-8600 492590-492600
8600-8610 492600-492610
8610-8620 492610-492620
8620-8630 492620-492630
8630-8640 492630-492640
8640-8650 492640-492650
8650-8660 492650-492660
8660-8670 492660-492670
8670-8680 492670-492680
8680-8690 492680-492690
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
8690-8700 492690-492700
8700-8710 492700-492710
8710-8720 492710-492720
8720-8730 492720-492730
8730-8740 492730-492740
8740-8750 492740-492750
8750-8760 492750-492760
8760-8770 492760-492770
8770-8780 492770-492780
8780-8790 492780-492790
8790-8800 492790-492800
8800-8810 492800-492810
8810-8820 492810-492820
8820-8830 492820-492830
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
8830-8840 492830-492840
8840-8850 492840-492850
8850-8860 492850-492860
8860-8870 492860-492870
8870-8880 492870-492880
8880-8890 492880-492890
8890-8900 492890-492900
8900-8910 492900-492910
8910-8920 492910-492920
8920-8930 492920-492930
8930-8940 492930-492940
8940-8950 492940-492950
8950-8960 492950-492960
8960-8970 492960-492970
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIG
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with
8970-8980 492970-492980
8980-8990 492980-492990
8990-9000 492990-493000
9000-9010 493000-493010
9010-9020 493010-493020
9020-9030 493020-493030
9030-9040 493030-493040
9040-9050 493040-493050
9050-9060 493050-493060
9060-9070 493060-493070
9070-9080 493070-493080
9080-9090 493080-493090
9090-9100 493090-493100
9100-9110 493100-493110
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02 BA
on of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
9110-9120 493110-493120
9120-9130 493120-493130
9130-9140 493130-493140
9140-9150 493140-493150
9150-9160 493150-493160
9160-9170 493160-493170
9170-9180 493170-493180
9180-9190 493180-493190
9190-9200 493190-493200
9200-9210 493200-493210
9210-9220 493210-493220
9220-9230 493220-493230
9230-9240 493230-493240
9240-9250 493240-493250
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
tation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
9250-9260 493250-493260
9260-9270 493260-493270
9270-9280 493270-493280
9280-9290 493280-493290
9290-9300 493290-493300
9300-9310 493300-493310
9310-9320 493310-493320
9320-9330 493320-493330
9330-9340 493330-493340
9340-9350 493340-493350
9350-9360 493350-493360
9360-9370 493360-493370
9370-9380 493370-493380
9380-9390 493380-493390
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane w
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
9390-9400 493390-493400
9400-9410 493400-493410
9410-9420 493410-493420
9420-9430 493420-493430
9430-9440 493430-493440
9440-9450 493440-493450
9450-9460 493450-493460
9460-9470 493460-493470
9470-9480 493470-493480
9480-9490 493480-493490
9490-9500 493490-493500
9500-9510 493500-493510
9510-9520 493510-493520
9520-9530 493520-493530
BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02
er (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Ru
paved shoulder with service road in Urban area under EPC mode in the state of Uttar Pradesh.
9530-9540 493530-493540
9540-9550 493540-493550
9550-9560 493550-493560
9560-9570 493560-493570
9570-9580 493570-493580
9580-9590 493580-493590
9590-9600 493590-493600
9600-9610 493600-493610
9610-9620 493610-493620
9620-9630 493620-493630
9630-9640 493630-493640
9640-9650 493640-493650
9650-9660 493650-493660
9660-9670 493660-493670
01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE WAY TCS -01
e with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane wit
f Uttar Pradesh. paved shoulder with service road in Urban area under EPC mode in the state of Utta
9670-9680 493670-493680
9680-9690 493680-493690
9690-9700 493690-493700
9700-9710 493700-493710
9710-9720 493710-493720
9720-9730 493720-493730
9730-9740 493730-493740
9740-9750 493740-493750
9750-9760 493750-493760
9760-9770 493760-493770
9770-9780 493770-493780
9780-9790 493780-493790
9790-9800 493790-493800
9800-9810 493800-493810
GE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN CARRIAGE W
iswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120 (Ramnagar to Siswab
C mode in the state of Uttar Pradesh. paved shoulder with service road in Urban area under EPC mo
9810-9820 493810-493820
9820-9830 493820-493830
9830-9840 493830-493840
9840-9850 493840-493850
9850-9860 493850-493860
9860-9870 493860-493870
9870-9880 493870-493880
9880-9890 493880-493890
9890-9900 493890-493900
9900-9910 493900-493910
9910-9920 493910-493920
9920-9930 493920-493930
9930-9940 493930-493940
9940-9950 493940-493950
MAIN CARRIAGE WAY TCS -01 & TCS-02 BAR CHART HIGHWAY MAIN
+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with Rehabilitation and up-gradation of NH-730 from Km 484+000 to Km 505+120
Urban area under EPC mode in the state of Uttar Pradesh. paved shoulder with service road in Urba
9950-9960 493950-493960
9960-9970 493960-493970
9970-9980 493970-493980
9980-9990 493980-493990
9990-10000 493990-494000
10000-10010 494000-494010
10010-10020 494010-494020
10020-10030 494020-494030
10030-10040 494030-494040
10040-10050 494040-494050
10050-10060 494050-494060
10060-10070 494060-494070
10070-10080 494070-494080
10080-10090 494080-494090
Rehabilitation and up-
T HIGHWAY MAIN CARRIAGE WAY TCS -01 & TCS-02BAR CHART HIGHWAYgradation
MAIN ofCARRIAGE
NH-730 from KmWAY TCS -01 & T
484+000 to Km 505+120
(Ramnagar to Siswababu ) to
m 484+000 to Km 505+120 (Ramnagar to Siswababu ) to two lane with paved shoulder (Rural Area) & two lane with two lane with paved shoulder
r with service road in Urban area under EPC mode in the state of Uttar Pradesh. (Rural Area) & two lane with
paved shoulder with service
road in Urban area under EPC
mode in the state of Uttar
Pradesh.
10090-10100 494090-494100
10100-10110 494100-494110
10110-10120 494110-494120
10120-10130 494120-494130
10130-10140 494130-494140
10140-10150 494140-494150
10150-10160 494150-494160
10160-10170 494160-494170
10170-10180 494170-494180
10180-10190 494180-494190
10190-10200 494190-494200
10200-10210 494200-494210
10210-10220 494210-494220