Symptom
You require information about cProjects Release 4.50.
Other Terms
SAP Project and Portfolio Management, cProject Suite 4.50, cFolders 4.50, xRPM 4.50, ICF, Internet
Communication Framework, SICF, HTTP, HTTPS, Performance
Solution
Part 1: General information
l cProject Suite 4.50 and xRPM 4.50 (ABAP) are in the same software component CPRXRPM 450_700.
For xRPM 4.50, you must additionally install component CPRXRPM_UI 450_700 (Java) from SAP
Service Marketplace (This is not necessary, when you only use cProjects 4.5).
l For using cProjects 4.5 in the SAP Enterprise Portal, you must install the "Business Package
for Project Portfolio Management and Design Collaboration" (BP for PPMDC) 4.5. You can
download the BP for PPMDC 4.5 from e.g.:
http://www.service.sap.com/patches
-> SAP Support Packages and Patches
-> Entry by Application Group
-> SAP CPROJECT SUITE
-> SAP CPROJECT SUITE 4.50 ,,,,,,,,,,,,,,-> BP PROJ., PORT. & DCOL. 4.5 70
During the installation, see also SAP Note 517484 (using transaction SICF to activate ICF nodes) and
SAP Note 1088467 when importing Support Packages. For the cProject specific ICF nodes, and, in
general, for configuration issues, see the Configuration Guide content in Solution Manager (See Part
4 of this note for more details).
Note:
Approval documents, project status reports only run using SAP Interactive Forms by Adobe. Approval
documents, project status reports, print forms in cProjects 4.5 require Adobe document services
( A D S ). You must install ADS on the Java Stack of NetWeaver 7.0. You do not have to install the ADS
on the same server as cProjects. You can install it on a different server. After an upgrade from an
earlier cProjects release, you can still use existing Smart Forms for printing.
For more information about SAP Interactive Forms by Adobe, see
http://service.sap.com/adobe.
l Licenses:
The cProject Suite is contained in the licenses for SAP PLM, SAP ERP and SAP Business Suite. For
further information, contact your sales personnel.
l Availability:
cProjects 4.5 ramp-up start is mid of December, 2007, and is currently scheduled to end in June,
2008.
l Security:
Please follow the current Security Guide (see link in Part 4 of this note).
The following security notes should be implemented:
Note Support Package
1529208 SAPK-45011INCPRXRPM
(Correction to security note 1439392 and 1436936, respectively)
l Support Packages:
For information about cProjects 4.5 (CPRXRPM 450_700) Support Packages, see SAP Notes 1088467
and 1084384. See SAP Note 1120036 for the current PPM 4.5 Support Package Schedule.
l Customer-specific Fields:
Customer-specific fields on BSP pages in cProjects 3.10 or 4.0 cannot be migrated automatically
to the new Web Dynpro ABAP user interface in 4.5. You will therefore you have to re-create these
fields after the upgrade. Customer-specific fields on Web Dynpro ABAP pages in cProjects 4.0 can
be migrated automatically to the user interface in 4.5.
l Performance:
For a collection of performance relevant notes see SAP Note 1092846.
l Restriction List:
SAP Note 1114207 contains a list of product restrictions concerning cProjects 4.0 and 4.5.
***********************************************************************
l This section lists some of the functional highlights. An extensive list of functional
innovations with Release 4.50 can be found in the release notes (more information in Part 4 of
this note). In addition please find some general functional remarks at the end of this section.
l Usability:Based on cProjects 4.0 and cProjects 3.1 customer feedback the usability has been
improved throughout the application.
l Six Sigma Support:cProjects 4.5 provides out-of-the-box support for Six Sigma improvement
projects. This inculdes predefined project and role customizing and a new framework to manage
project metrics which can even be extended beyond the Six Sigma Context. If you are interested
in Six Sigma we recommend to also consider the SAP Quality Management solution.
l Resource Management: New resource charts allow to better assess and improve the stability of
the current resource plan by providing a graphical overview of resource demands, availabilities,
and staffings. Furthermore re-scheduling resources is now better supported by allowing the
resource plan to be updated based on the project task schedule. Resource-based cost estimates
are now more accurate as the staffing distribution is now taken into account for project costing
with SAP ERP Easy Cost Planning. Employees can now search for vacant project positions.
l Portfolio Integration:Customers that use both, cProjects 4.5 and xRPM 4.5, benefit from a
substantially improved integration between projects and the portfolio. This includes
synchronizing timelines and other data, project resource staffing at the portfolio level, and
displaying portfolio data at the project level.
l CATS Integration:With cProjects 4.5 and ERP 6.0 Enhancement Package 3 the effectiveness of
progress confirmation is improved. Project members can now confirm not only time but also
progress directly from CATS. This accelerates progress confirmation for occassional users who
now have the option to use CATS as a one-stop-interface for confirmation.
l Offline Integration: The field mapping between cProjects 4.5 and Microsoft Project (TM) has
been improved. Thus project plans are transferred more accuratly between cProjects and Microsoft
Project (TM). Please be aware that an exact transfer is not possible in all cases because of the
different designs of the two applications.
l Resource Management Scenarios: With cProjects 4.5 the same resource management scenarios are
supported as for cProjects 4.0 that is, (1) cProjects standalone if no cross-project resource
view is required, (2) cProjects with SAP xRPM (SAP xApp for Resource and Portfolio Management)
for capacity based cross project resource management and (3) cProjects with the RPA (Resource
Planning Application) for hourly cross-project scheduling and groupware integration. Whenever
cross-project scheduling without hourly scheduling or groupware integration is sufficient
(typically applies to most customers) the xRPM scenario is recommended. If you want to use the
RPA scenario please consult the Professional Service industry solution for details.
l cProjects 4.5 uses the same platform and technology as cProjects 4.0 to minimize upgrade efforts
for cProjects 4.0 customers.
l All new functionality has been tested and validated with customers and partners during
development.
***********************************************************************
l Released browsers for cProjects 4.5: Microsoft Internet Explorer version 6.0 SP02, version 7.0
and version 8.0. Concerning version 8.0: If you use "SAP Adobe Interactive Forms", check the
corresponding notes (e.g. note 1296419). If you use cProjects 4.5 in the portal, check the
portal itself, too.
Otherwise, problems may occur when you import/export (XML, MS Project) or when you use SAP
Interactive Forms by Adobe. Also the ABAP Web Dynpro GANTT control is currently not supported
for other Browsers (see SAP Note 1098009). For Internet Explorer, we recommend that you make the
following settings under 'Internet Options':
¡ Add your local subnet to the 'Local intranet' security zone (for example, *.my_company.com)
l When you use cProjects 4.5 in the SAP Enterprise Portal, the same protocol must be used to
access the portal as is used for accessing the portal in the cProjects back-end system, that is,
either HTTP for both of or HTTPS for both. If they are not the same, you may not be able to call
the Gantt chart and pop-up.
l See SAP Note 875986 for information about important SAP Notes regarding transaction SNOTE (SAP
Note Assistant) to import SAP Notes.
***********************************************************************
l Security Guide:
http://service.sap.com/securityguide
-> cProjects Suite Security Guides
l Installation Guide:
http://service.sap.com/plm-inst
-> cProjects Suite 4.50
l Configuration descriptions are delivered only by SAP Solution Manager. This is mandatory for
each new installation. The following processes contain the cProjects information:
l Sizing Guide:
http://service.sap.com/sizing
-> Sizing Guidelines ,,,,,,-> Solutions & Platform -> Sizing cProjects
l Brochure "Strategic and operative project and portfolio management with SAP", Mat.No. 50073044.
l Business Package for Project Portfolio Management and Design Collaboration (BP for
PPMDC) 4.5:
http://help.sap.com
-> Documentation
-> SAP Business Suite
-> SAP Project and Portfolio Mgmt. 4.5
-> Business Package for PPMDC 4.5
Validity
Software Component From Rel. To Rel. And Subsequent
CPRXRPM 450_700 450_700
References
This document refers to:
SAP Notes
1046798 Missing role IDs after upgrading from cProjects 3.1
1075655 CPRXRPM 450_700 installation/delta-upgr to SAP_BASIS 700
1075658 Exchange upgrade to Basis 700 with CPRXRPM 450_700
1084384 Support Packages for CPRXRPM 450_700
1088467 cProjects 4.5 - Support package information and notes
1092846 cProjects 4.5 - Performance Notes and Sizing Guide
1098009 Web Dynpro ABAP - List of known Restrictions and Browser Support
1103627 Setting up the field control (4.5)
1103684 cProjects 4.5 - BAdIs
1114207 cProjects 4.0 and 4.5: Restrictions
1119326 Configuration guide for cProjects 4.50
1120036 PPM 4.5 Support Package Schedule
1124236 cProjects Client Sizing
1167840 Project Self-Services no longer recommended
1260377 cProjects 4.0 and 4.5: Installation on NW 7.0x and NW 7.31
1260903 cProjects-SRM-Integration with SAP SRM 7.0
1265367 Performance Analysis Checklist cProjects 4.0 / 4.5
1289589 cFolders 4.0 and 4.5 released for installation on NW 7.01
1326709 MS Project Integration with SAP Portf. and Proj. Management
1377104 FAQs - SAP Portfolio and Project Management 5.0
1418905 Custom Fields on Tasks, Subtasks and Checklist Items tabs
1429160 FAQ: cProjects and access to WebDAV
1475794 Support Packages for CPRXRPM 500_702
1740005 SAP Portfolio and Project Management enabled for SAP_CORBU
1826332 FAQs - SAP Portfolio and Project Management 6.0
1835498 cProjects 4.0/4.5/PPM 5.0: Prerequisites for NW 7.40 ABAP
1856305 cProjects 4.0/4.5 and PPM 5.0: Installation on NW 7.40 ABAP
517484 Inactive services in the Internet Communication Framework
756670 cProjects: Performance, project structure, runtimes
900310 cProjects 4.0 FAQ: General notes
938390 FAQs for cProjects in SAP Enterprise Portal
938521 Personalizing the user interface (UI) of cProjects
938526 cProjects in the portal: Unsaved changes
942560 Adjusting the cProjects user interface
958210 Microsoft Project Client Integration
976787 Long runtimes for expanded structure tree
994727 Sizing Guide for cProjects 4.0