attitudes are Risk averse, Risk tolerant , risk neutral , risk seeking
and risk prone.
Risk breakdown structure, hierarchy of the identified project
risks arranged by risk category.
Risk Category, Group of potential causes of risk , groups such
as technical , external , environmental , organizational.
Risk Exposure, Measure of overall project risk describing the
overall effect of identified risks on project objectives.
Risk Metalanguage, Structural description of risk which
separates Cause, effect and risk .
Risk Model, Representation of the project including data about
project risks that can be analyzed by quantitative methods.
Risk Register, Document containing the results of Identify risk ,
qualitative and Quantitative risk analysis processes and plan risk
response, mentions all identified risks with detailed description.
Risk Thresholds , measure of the level of risk exposure above
which action must be taken.
Root Cause, Initiating cause that give rise to casual chain which
may give rise to risks.
Secondary Risk, Risk that arise a direct result of implementing
a risk response.
Threat , Negative Condition or situation , a risk that will have a
negative effect on project objectives if it occurs.
Assumption Testing , Looking at the stability of each
assumption , ususally held in perform qualitative risk analysis
process.
Accept , Do nothing , passive acceptance that requires a
workaround , Active acceptance that requires a contingency plan.
Avoid , Eliminate the threat by eliminating the cause.
Bar Chart , Chart showing activity information , it usually
includes risk score and owner.
Cognitive Bias, Bias due to differences in perception .
Motivational bias, Bias due intentionally to one direction or
another.
Business risk , risk of gain or loss .
Pure Risk , Risk of loss only , usually needs insurance.
Data Quality Assessment, Determining how will a risk is
understood.
Ensure Compliance , Make sure polices, procedures and
plans are being followed.