Points to Watch
5) Where manual handling is necessary, ensure material is stored at convenient lifting/laying height
and can be readily lifted/laid
6) Design storage space to suit access/egress of forklift trucks, vehicles, trolleys etc.
7) Ensure all personnel are properly briefed on manual and/or mechanical handling techniques, and
where appropriate are properly trained and qualified
8) Ensure that alien material (i.e. sub contractors equipment, unidentified equipment, unidentified
substances) is placed in a separate quarantine area
9) Ensure that all equipment leaving storage area is properly maintained and has relevant inspection
status and /or documentation.