ite Instruction
CONSTRUETION
Icode No._....007 __..... [PRONECT STATUS
Project ub Project [Building's Name: Shop Howe JBuldings Location: IF
lORKIDE VILLA ;REENERY lock: 82 & 82
[THE BOTANIC CITY ni 20units
presrosrns
|Contractor: ISPIND EAMLO
Issue Record
Request Spind (Eamio) to finish up all the pattress box at 81 units (#51,53,55) & B2 10unis (#57-75) GF&MF, Before 6th
[Aprit 2019 is Dateline.
[Because the other part of contractor need to start skim coat and wiring
INote,
Location: 81 3 Units (#51,53,55) B2 10 Units (#57-75) wh 6-0U- 14
Floor: GF & ME
Solution by Contractor Solution by Team {The Botanic Contraction)
|SPIND (EAMLO) must responsible to finish own scope on time,
|The Botanic Contraction will Penalty 10S/unit per day
MEP CONTRACTOR (MEP SITE SUPERVISOR MEP SITE MANAGER
Signature [signature [Signature
( 0-14 . Yi
Perce Y Yo Oth wy
of -ty4 Meas elsaunivect
ou IF
[Name/Date IName/Date Name/Date
Page 1 of 1CONSTRUCTION
[Code NO. n= 908 nw vinnenn [PROJECT STATUS,
Project: ub Project [Buildings Name: Shop House JBulings Location: aF
JORKIDE VILLA |creenery Block: 1, a2, A3, 81, 82
[THE BOTANIC CITY we 3nunits
Pace 0 WARE IO
\Site Instruction
|contractor: ISPIND EAMLO
Issue Record
Request Spind (Earl) to finish up all the COLD WATER PIPE & Riser Plumbing work at A1,A2,A3 GF&ME Tolle, Before
th apr 2029 is Dateline.
laecause the other par of contractor need to start close the riser and start tie's bathroom & Celi Frame as soon as
possible OU
poss Ay - GO, AO-OUF- |
cation: AIM1-19,A2 1Ounits & A3H43 43,45 (28Units), B1 3Units,62I0units Pg) TS
Foor: GF & MF's Bathroom
[Please See Reference Photoes and Drawing
Solution by Contractor Solution by Team (The Botanic Contraction)
[SPIND (EAMLO) must responsible to finish own scope on time.
[The Botanic Contraction will Penalty 10$/unit per day
MEP CONTRACTOR MEP SITE SUPERVISOR ‘MEP SITE MANAGER
Signature Signature [Signature
jy OV GT of 4-4 Dh
Neer itn le wen arg
ol. Ut
IName/bate IName/Date WName/Date
Page 1 of 1UJ
Site Instruction
CONSTRUEIION
fprouectstatus[
lcode No. _..009_
project [Building's Name: Shop House JBuidings Location: IF
JORKIDE VILLA lock: A1,A2,A3,81 & 82
[THE BOTANIC CITY
Ne 31 Units
ae SaaS
|Contractor: |SPIND EAMLO_
ue Record
|Request Spind (Eamio) to finish up all the Electrical Conduit work (Slab mounted/Above Ceiling)at A1,. ae othe
Grea Tole, Before Sth April 2019 is Dateline D , (0- OG
leecause we must start wiring work as soon as possible \— BS) ok ot-|
Note A2~ Foy oust
fosten amisoAasoinin nian eLainieksnionis §— PP Fo) PS OY UG
Floor: GF & MF's Bathroom B1- O21 0S
eo
please See Reference Photoes and Drow! bo~
Solution by Contractor Solution by Team {The Botanic Contraction)
[SPIND (EAMLO) must responsible to finish own scope on time.
[The Botanic Contraction will Penalty 10$/unit per day
MEP CONTRACTOR MEP SITE SUPERVISOR MEP SITE MANAGER
Signature Signature Signature
O- OU. th fan ik
ieAeHP oe In
Harb we Bhasin
[Name/Date_ Name/Date IName/Date Of oly 14
Page Lof 1