You are on page 1of 8
SITE ISSUE FORM CONSTRUEIION Code No. Prec [sie Project baling tacaton: JoRKiDe via (GREENERY REVRGREEUN |uiding Blok: a381,62 [rue BOTANIC crTY 47s contractor: PCL VSE ose oneva020 issue Record. anf anaiinssfcnanm Ag a47 1449950 en nice + 2800 v7 cl 2700 rwstunaistieGugnmrdigjagiangg cinonmayigzmsimanygimdnnaansiines injeysdandusnmsdyybainedistbock 3 8 48 Novos: snemayahimeduoes Highight Drawing System of area 6 cop cling {ne Request appli ooo bung she ame conon “Tare cling fram is dane, #8 noeded to moxie request & approved pease See Reference Photoes and Drawing a Eo ste Team ‘steam esgn Team Fallow Se oloive yequet te Ap Colony Fon Cy ps0 b Ch y200 ches thes + Hee Se apeetor Sie Supepior 1a a Design Date) OTD loate: 1-780 [ater 7 [bare bate Page Lof + ig ye HYS) ei 5 va Y3 Y2 vi via Fo Tm ee oe > oe nite ato sa 18000 i 14500 XY i800 X7 ‘SHC1-B1#S5 X6 SHMI-B1#53 XS SHM2-B1#51 X4. X3a X3 SHB-B1#49_ X2 Xt Xla 3F - AIR CONDITIONING & VENTILATION SYSTEM Scale T80@AS LEGEND ( AIR CONDITIONING SYSTEM AIR CONDITIONING SYSTEM "TYPCAL BULDINS ‘Symbol Description Symbol Description ROW 01 / BLOCK 81 (49-55) Tee era sean covomouna Te” ner noo natant ne SS” cnet ome 12 | ees voce 2 | ert 0 am eee "APPROVAL |. CHANTHOL [APPROVAL | M RATHANA, cHecKeD | HcHETHA cling aut Fon a “indoor Une (DU) Ceting Type a = | a a * © ‘SHMI-PI2#S8 SHM2-P12660SHM2-P12662_ SHMI-PI2#66A ‘TF - DRAINAGE WATER, SeuLE i palirapena it Gates Cua ocaated Teng ver Prem erp oem qari or ‘ye neon oman vo) (ol=]aafa}|afag yard coworem [os a 2018 CL prnbves—| Yo ys y4 5000 1030 aro soo, 400 Satna £000 | 2000, 4500 ; 000 ; jae ued : [~proecriocaion | xp SHBY Xaa_ xa) SHM2-A3. gg) SHMI-A3 gg SHCI-A3 gp ‘ecremnteie ta: #47 #45 #43 #1 SANGRAT CHROY CHANGYA, LAN CHOY CANGVA PHNOM PES 3F - AIR CONDITIONING & VENTILATION SYSTEM ee ‘SCALE TSO@AS ORKIDE VILLA IIT ‘THE BOTANIC CITY LEGEND (THE GREENERY - PHASE 1) ‘DRAWING TILE [AIR CONDITIONING SYSTEM. ‘AIR CONDITIONING SYSTEM CREDIERY DULDING = TYPICAL BUILDING ‘Symbol Description ‘Symbol Description ROW 01 / BLOCK A3 (841-47) TS aoa Ut OU Maus Tye | remo EeTMATION SYSTEM aes oor Unt TOU) | Wat Montes ee Outdoor Unit (DU) me pans » aie ae ——_carperPeeicr) Indo Unt OU) Ceing Ceset Type —— __ dane or) ed 5 roy Se MAL1NO OL 3078 ALAND OL 3407S M3119 O1 30S MALLN9 OL 3407S 20 599 <0. Rae Sst aie oT Toop TF - DRAINAGE WATER SYSTEM a ‘SAE THT5@AS poliénuprsws DDRANAGE WATER SYSTEM EJ escrow ‘gerry sou pre =m) (qeEiNngH WASTE PPE Om) graye vent Pe wm Gere Ton Prem ‘TETEEpE RaN PPE yore. ‘ge roo aN ro) TL: INVERT LEVEL Pa cem ove, fel=)i fa] 0] cv owe | BeSOWETON 0 240539 FIRST ISSUE eee — [193 uN 2019] APPROVED ARCHITECTURAL DRAWING Rohe SN ar THE EVERGREEN PHASE 2 Yenc, REVISE BUILDING BLOCK L3 #48 EVERGREEN - PHASE 2 Ong of L3 == i Sates 20 veoeaoie A ESET 4A oaer20%8 12 16087018 13. snoro1e aron0te & MAIN ENTRANCE "ARCHITECTURAL TECHNICAL SUPPORT Row 01 #48Biock L3) PROJECT LOCATION ‘PROJECT NAME ORKIDE VILLA II “THE BOTANIC CTYTHE EVEROREEN PHASE2 [THE EVERGREEN BUILDING BlocK U3 #8 COVER DWGN. WG Re. ce -E0r me ck L3- 000, “APPROVAL, “APPROVAL CHECKED DRAWN | SALE we LEGEND: = oie ra aneseeane | eo ee a Ha ree AREA 75M Ig y Lo Lox: a ist 3) a thief, ae 42) (GYPSUM CEILING BOARD LOCATION: TOILET GYPSUM CEILING BOARD 9MM THK. LOCATION: PUBLIC SPACE AREA GYPSUM CEILING BOARD 9MM THK. LOCATION: REDO ® @ ee SHB. 3448 (2) REV OATE 00 | canszo18 DESCRIPTION FIRST ISSUE A Esa Beans 20 | sme A Some Sm re) 4) owoaro18 12 | te0sz018 13 Homo | ee 14 swe | See 1s eoraae SO a Row O1 #48,El0th L. PROJECT LOCATION PROJECT NAME ORKIDE VILLA UT “THE BOTAN CIT THE EVEREREEN PHASE 2 DRAWS TE “THE EVERGREEN BULOING ‘ocx 3848 THIRD FLOOR REFLECTED CEILING PLAN DWEN. DWE NS [Rev nce-epoormeaests- 505 Fp sana | 20350 Revise ceiling level for error_ with Plumbing slop effect with helght celling et ce } — + 4 {-=== 7 | | 3 poornecxnoonrun file a jb ali sonora | na yf 5 | monoognan | a yf 5 soni o g tf 7 sein 4 | pean i Se ob = F | eeoespmne olf ag 5000 2090 Fe vSeD ASOROGHFOR VOCAB MacHNg-ssz¢ £8 5 REV) OATE | DESCRIPTION 0 oaeenote FIRST ISSUE agen a or 20 sso A eere ‘A worsen A “Samense” 10 7eorao ERNE +4 oaoeaoie 1a | te82019 13 | soo 44 siono1@ 15 o@r20% TECHNICAL SUPPOR (EBD,Row 01 #48,Slock L3) ‘PROJECT LOCATION PROJECT NAME. ORKIDE VILLA IT “THE BOTAME CITVTHE EVERGREEN PHASE2 Brawn TE THE EVERGREEN BULONG REVISE BLOG pester SECTION Xi WGN. ‘DWE Ne [Rev ece-eeparse peerts- 301 [Fp TPR APPROVAL RAK caEcKED [psOPHENC Raw PAKWGRONG sree @

You might also like