Professional Documents
Culture Documents
Hotel Management PDF
Hotel Management PDF
PROJECT REPORT
ON
HOTEL MANAGEMENT
PREPARED BY
HITESH KUBAVAT
&
CHETAN PANCHANI
CLASS
BCA-6TH (C3)
GUIDED BY
KEYUR ZALA
PRADIP VANAPARIYA
COLLEGE
SHREE M. & N. VIRANI SCIENCE COLLEGE, RAJKOT
PREFACE
The project training in the 6th semester of the course has given us the
exposure to the real world. It is my great pleasure to present the project on A
HOTEL MANAGEMENT which we conceived during the schedule of BCA
(6thSemester). We have been successful in developing the project in a given time
limit and will give my best.
ACKNOWLEDGEMENT
We would also like to pay our sincere thanks all those, who have co-
operated us, inspired us and have provided moral support directly or indirectly for
this project.
Yore’s sincerely,
INDEX
CONTENT PAGENO
PROJECT PROFILE 5
ABSTRACTION 6
SYSTEM REQUIREMENT 7
PROJECT ANALYSIS 8
DFD 11
PROJECT RISK 14
FEASIBILITY STUDY 22
DATABASE 24
SCREENSHOT 28
BIBLOGRAPHY 36
PROJECT PROFILE
C# AND ASP.NET
.NET FRAMEWORK 3.5
KEYUR SIR
CHETAN PANCHANI
ABSTRACT
In today’s world online booking is very wide trend. With the help of this
software you can book online room as yours required.
This is software which has mainly made for management of a Hotel. The
software has been designed with front-end as asp.net and backend as C#. The
project hotel management manages and maintains the record of customers and
rooms of the hotel.
Customer can book the room through this software. The rooms have
different categories such as A.C., non-A.C. etc. So There charges and records will
be maintained by this software. This software made in a user friendly interface so
everyone can understand and use easily.
SYSTEM REQUIREMENT
HARDWARE REQRUIREMENT
SOFTWARE REQUREMENT
PROJECT ANALYSILS
Problem Recognition
Feasibility Study
Requirement Analysis
Problem Recognition :
It is the phase in which the Current need for the System is to be defined.
This site of Computer Peripherals & Consumables has all the up to date
information. Regarding to all computer Peripherals & Consumables.
Feasibility Study :
Requirement Analysis :
This phase basically converts these informal needs from the user into a
set of formal requirement.
1. Problem Analysis
The SRS makes an Agreement between the user(client) of the system and the
developer on what the software product will do.
3. Requirement Validation
Data flow diagrams are useful and intuitive way to describing a system.
They are normally understandable without special training, especially if control
information is excluded. They show end-to-end processing. That is the flow of
processing from when data enters the system to where it leaves the application
can be traced.
DATAFLOW DIAGRAM
ADMIN
PROJECT RISK
But, regardless of the outcome, it's a really good idea to identify it,
assess its probability of occurrence, and estimate its impact.
Risk management aims at dealing with all kinds of risks that might
affect a project.
Type of risk
The checklist can be used for risks identification and focuses on some
subset of known and predictable risks in the following generic
subcategories:
The checklist can be used for risks identification and focuses on some
subset of known and predictable risks in the following generic
subcategories:
The tools used are not only versatile in their ability to handle complex
application but their ease of use lends the developer freedom for thinking about
the nuances how to implement ideas as a whole.
Instead the developer can concentrate upon the core application domain
knowledge gathering and the design of the system from users view point and rest
assured that the language and other tools will provide enough features to
implement the same.
Visual Studio.NET, the next version of Visual Studio IDE, is also a key
component of the .NET strategy.
The Visual Studio.NET IDE has also been given a facelift and packed with
a wide variety of new functionalities.
.NET platform
The .NET platform has several components—however, who you ask will
probably affect the answer you receive.
Servers such as BizTalk and SQL Server, as well as services such as .NET My
Services and its first visible component, .NET Passport, are being described by
some as integral parts of the .NET platform.
However, for many of us, the .NET Framework is what we think of when
.NET is mentioned. It includes Visual Studio.NET (VS.NET), the .NET Common
Language Runtime (CLR), and the .NET Base Class Libraries (BCL).
ASP.NET Features
ASP.NET is more than just the next version of ASP. It is a totally re-
architected technology for creating dynamic, Web-based applications. ASP pages
use the .asp extension and ASP.NET pages use the extension .aspx.
Increased Performance
Server Controls
Web Services
Improved Security
Greater Scalability
Cookie-less Sessions
ADO.NET
The T-SQL language has been extended with several new features and
enhancements as well, such as recursive queries and a new xml data type. In
addition, the TOP operator now accepts a numeric expression, such as a variable
name instead of only an integer, to specify the number of rows to return, and it
can be used in INSERT, UPDATE, and DELETE statements and SELECT queries.
FEASIBILITY STUDY
A feasibility study is carried out to select the best system that meets
performance requirements. Only by spending the time to evaluate the feasibility
do I reduce the chances for extreme embarrassment at later stage of the system
project.
Each of the feasible area was then abstracted into proposed modules for
“BI and DW REPORTING”. For the complete feasibility study I need to concentrate
on following area:
Economic Feasibility:-
Among the most important information contained in feasibility study is the
cost-benefit analysis. That is, an assessment of economic justification for
computer-based system. Cost-benefit analysis delineates cost for development
and weights them against tangible and intangible benefits in the system.
Technical Feasibility:-
Technical analysis evaluates technical merits of the system at the same time
collecting additional information about performance, reliability, maintainability
and productivity. In some cases, this system analysis step also includes a limited
amount of research and design.
Operational Feasibility:
Operational feasibility measures how well the solution will work in the
organization and how will end-user & management feels about the system.
Proposed system is helpful for all the users associated with the organization. It
will allow the administrator to have up-to-date information regarding all the
aspects of their users. The decision-making process will also become faster with
the use of data integration, consolidation. So it is feasible to implement the
system.
DATABASE
ROOM MASTER
CHECK_IN
CHECK_OUT
REGISTRATION
ADMIN_REGISTRATION
ADVANCE BOOKING
ROOM_BOOKING
SCREEN SHOT
HOME PAGE
LOGIN PAGE
ADVANCE BOOKING
ROOM TARIFF
AFTER LOGIN
ADVANCE BOOKING
ABOUT US
CONTACT US
BIBLOGRAPHY
BOOKS :
C # complete reference
C#.NET
WEBSITES :
www.MCAprojects.com
www.projectmanagement.com
www.codeproject.com
SEARCH ENGINE :
www.google.com