You are on page 1of 12

Tamale Teaching Hospital - Phase 2

Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

Building AA
0 1 Lobby 25.2 No - -
0 2 Pharmacy 12 Yes DX.CASSETTE UNIT 3
0 3 Store Pharmacy 12.1 Yes DX.CASSETTE UNIT 3.2
0 4 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3
0 5 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3
0 6 Toilets 11.1 No MECHANICAL EXHAUST -
0 7 Toilets 11.2 No MECHANICAL EXHAUST -
0 8 Workstation Area 74 Yes DX.CONCEALED SPLIT UNIT 8.5
0 9 Conference / Tutorial 47.6 Yes DX.CONCEALED SPLIT UNIT 7
0 10 Conference / Tutorial 33.6 Yes DX.CONCEALED SPLIT UNIT 6.2
Office, Faculty 12.3 Yes DX.CASSETTE UNIT 3.6
0 11
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 12
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 13
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 14
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 15
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 16
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 17
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 18
Toilet 1.2 No MECHANICAL EXHAUST -
0 19 Staff Lounge / Pantry 50.1 Yes DX.CONCEALED SPLIT UNIT 12.8
0 20 Office, Faculty 12.1 Yes DX.CASSETTE UNIT -
0 21 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.1
0 22 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.1
0 23 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.1
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.1
0 24
Toilet 1.2 No MECHANICAL EXHAUST -
Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.3
0 25
Toilet 1.2 No MECHANICAL EXHAUST -
0 26 Toilets 11.1 No MECHANICAL EXHAUST -
0 27 Toilets 11.2 No MECHANICAL EXHAUST -
0 28 Conference / Tutorial 33.6 Yes DX.CONCEALED SPLIT UNIT 6
0 29 Workstation Area 76 Yes DX.CONCEALED SPLIT UNIT 8.6
0 30 Conference / Tutorial 47.6 Yes DX.CONCEALED SPLIT UNIT 7
0 31 Conference / Tutorial 33.6 Yes DX.CONCEALED SPLIT UNIT 6.2

Page 1 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

0 32 Office, Faculty 12.3 Yes DX.CASSETTE UNIT 3.3


0 33 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 34 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 35 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 36 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 37 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 38 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 39 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 40 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 2.8
0 41 Office, Faculty 12.1 Yes DX.CASSETTE UNIT 3.1
0 42 Administration, 61 Yes DX.CONCEALED SPLIT UNIT 5.3
0 43 Janitor 5.5 No MECHANICAL EXHAUST -
0 44 Reception 12.4 No CEILING FANS SYSTEM -
0 45 Corridor/L 37.3 No CEILING FANS SYSTEM -
1,2 1 Lobby 25.2 No - -
1,2 2 6-Bed-Bay (MGS) 50.2 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 3 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 4 Showers 15 No MECHANICAL EXHAUST -
1,2 5a Ritual washing 4.5 No MECHANICAL EXHAUST -
1,2 5b Assisted Bath 6.8 No MECHANICAL EXHAUST -
1,2 5c Ritual washing 4.5 No MECHANICAL EXHAUST -
1,2 6 Toilets 15.2 No MECHANICAL EXHAUST -
1,2 7 6-Bed-Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 8 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 9 1-Single Bed Room 18.2 Yes DX.CONCEALED SPLIT 3.7
1,2 9a Toilet Shower 2.6 No MECHANICAL EXHAUST -
1,2 10 1-Single Bed Room 18.2 Yes DX.CONCEALED SPLIT 3.4
1,2 10a Toilet Shower 2.6 No MECHANICAL EXHAUST -
1,2 11 Staff Change 7.2 No MECHANICAL EXHAUST -
1,2 12 Treatment 16.7 Yes DX.CONCEALED SPLIT 3.3
1,2 13 Office 12.1 Yes DX.CASSETTE UNIT 3.3
1,2 14 Nurse Station 25.4 No CEILING FANS SYSTEM -
1,2 15 Office 12.1 Yes DX.CASSETTE UNIT 3.3
1,2 16 Staff Lounge / Pantry 16.7 Yes DX.CONCEALED SPLIT 4.8
1,2 17 Staff Change 7.2 No MECHANICAL EXHAUST -
1,2 18 1-Single Bed Room 17.9 Yes DX.CONCEALED SPLIT 3.3
1,2 18a Toilet Shower 2.6 No MECHANICAL EXHAUST -
1,2 19 1-Single Bed Room 18.2 Yes DX.CONCEALED SPLIT 3.5
1,2 19a Toilet Shower 2.6 No MECHANICAL EXHAUST -
1,2 20 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 21 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 22 Showers 15 No MECHANICAL EXHAUST -

Page 2 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

1,2 23a Ritual washing 4.5 No MECHANICAL EXHAUST -


1,2 23b Soiled Utility 6.8 No MECHANICAL EXHAUST -
1,2 23c Ritual washing 4.5 No MECHANICAL EXHAUST -
1,2 24 Toilets 15.2 No MECHANICAL EXHAUST -
1,2 25 6-Bed-Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 26 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 27 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 28 6-Bed-Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
1,2 29 Pantry 8.9 Yes DX.CASSETTE UNIT 2.3
1,2 30 Clean Utility 11.7 Yes DX.CASSETTE UNIT 3
1,2 31 Store, equipment 11.7 No CEILING FANS SYSTEM -
1,2 32 Janitor 3.9 No MECHANICAL EXHAUST -
1,2 33 Data Processing 4.6 Yes DX.CASSETTE UNIT 1
1,2 34 Corridor 101.9 No CEILING FANS SYSTEM -
1,2 35 Corridor 55.6 No CEILING FANS SYSTEM -
1,2 36 Corridor 77 No CEILING FANS COMBINED WITH FRESH AIR -
3 1 Lobby 25.2 No - -
3 2 6-Bed-Bay (MGS) 50.2 No CEILING FANS COMBINED WITH FRESH AIR -
3 3 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 4 Showers 15 No MECHANICAL EXHAUST -
3 5a Ritual washing 4.5 No MECHANICAL EXHAUST -
3 5b Assisted Bath 6.8 No MECHANICAL EXHAUST -
3 5c Ritual washing 4.5 No MECHANICAL EXHAUST -
3 6 Toilets 15.2 No MECHANICAL EXHAUST -
3 7 6-Bed-Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
3 8 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 9 1-Single Bed Room 18.2 Yes DX.CONCEALED SPLIT 3.6
3 9a Toilet Shower 2.6 No MECHANICAL EXHAUST -
3 10 1-Single Bed Room 18.2 Yes DX.CONCEALED SPLIT 3.6
3 10a Toilet Shower 2.6 No MECHANICAL EXHAUST -
3 11 Staff Change 7.2 No MECHANICAL EXHAUST -
3 12 Treatment 16.7 Yes DX.CONCEALED SPLIT 3.4
3 13 Office 12.1 Yes DX.CASSETTE UNIT 3.4
3 14 Nurse Station 25.4 No CEILING FANS SYSTEM -
3 15 Office 12.1 Yes DX.CASSETTE UNIT 3.4
3 16 Staff Lounge / Pantry 16.7 Yes DX.CONCEALED SPLIT 4.9
3 17 Staff Change 7.2 No MECHANICAL EXHAUST -
3 18 1-Single Bed Room 17.9 Yes DX.CONCEALED SPLIT 3.5
3 18a Toilet Shower 2.6 No MECHANICAL EXHAUST -
3 19 1-Single Bed Room 18.2 Yes DX.CONCEALED SPLIT 3.7
3 19a Toilet Shower 2.6 No MECHANICAL EXHAUST -
3 20 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -

Page 3 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

3 21 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -


3 22 Showers 15 No MECHANICAL EXHAUST -
3 23a Ritual washing 4.5 No MECHANICAL EXHAUST -
3 23b Soiled Utility 6.8 No MECHANICAL EXHAUST -
3 23c Ritual washing 4.5 No MECHANICAL EXHAUST -
3 24 Toilets 15.2 No MECHANICAL EXHAUST -
3 25 6-Bed-Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
3 26 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 27 6-Bed-Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 28 6-Bed-Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
3 29 Pantry 8.9 Yes DX.CASSETTE UNIT 2.3
3 30 Clean Utility 11.7 Yes DX.CASSETTE UNIT 3.1
3 31 Store, equipment 11.7 No CEILING FANS SYSTEM -
3 32 Janitor 3.9 No MECHANICAL EXHAUST -
3 33 Data Processing 4.6 Yes DX.CASSETTE UNIT 1.1
3 34 Corridor 101.9 No CEILING FANS COMBINED WITH FRESH AIR -
3 35 Corridor 55.6 No CEILING FANS SYSTEM -
3 36 Corridor 77 No CEILING FANS COMBINED WITH FRESH AIR -
Building BB
0 1 Lobby 23.8 No - -
0 2 Office, Patient Edu. 12.5 Yes DX.CASSETTE UNIT 1.5
0 3 Office, Patient Edu. 12.7 Yes DX.CASSETTE UNIT 3.4
0 4 Waiting OPD,Patient Education 78.7 No CEILING FANS COMBINED WITH FRESH AIR -
0 7 Conference / Tutorial 24.1 Yes DX.CONCEALED SPLIT 4.7
0 8 Conference / Tutorial 50.5 Yes DX.CONCEALED SPLIT 9
0 9 Staff Lounge / Pantry 24.5 Yes DX.CONCEALED SPLIT 8.4
0 9a Toilet/Shower 7.7 No MECHANICAL EXHAUST -
0 9b Toilet/Shower 7.7 No MECHANICAL EXHAUST -
0 10 Consultation /Interview 9
Yes DX.CONCEALED SPLIT 4.4
0 11 Examination 11.6
0 12 Examination 11.6
Yes DX.CONCEALED SPLIT 4.3
0 13 Consultation /Interview 9
0 14 Consultation /Interview 12.1 Yes DX.CASSETTE UNIT 3.4
0 15 Consultation /Interview 11.9 Yes DX.CASSETTE UNIT 3.2
0 16 Exam Treatment Colpscopy 24.3 Yes DX.CONCEALED SPLIT 5.5
0 16a Staff Change 11.7 No MECHANICAL EXHAUST -
0 16b Staff Change 11.7 No MECHANICAL EXHAUST -
0 17 Treatment 24.5 Yes DX.CONCEALED SPLIT 3.1
0 18 Clean Utility 12 Yes DX.CASSETTE UNIT 2.8
0 19 Soiled Utility 12 No MECHANICAL EXHAUST -
0 20 Examination 9 Yes DX.CASSETTE UNIT 1.4
0 21 Office, Consultant 11.7 Yes DX.CASSETTE UNIT 2.9

Page 4 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

0 22 Office, Consultant 11.7 Yes DX.CASSETTE UNIT 2.9


0 23 Express Lab 9 Yes DX.CASSETTE UNIT 1.1
0 24 Medical Records 24.5 No CEILING FANS SYSTEM -
0 25 Head of Nurse 11.9 Yes DX.CASSETTE UNIT 2.9
0 26 Nurse Station 12.1 Yes DX.CASSETTE UNIT 1.1
0 27 Data Processing 11.9 Yes DX.CASSETTE UNIT 3
0 28 Pharmacy Store, equipment 11.9 Yes DX.CASSETTE UNIT 3.1
0 29 Pharmacy, OPD 12.1 Yes DX.CASSETTE UNIT 1.3
0 30 Consultation /Interview 8.9
Yes DX.CONCEALED SPLIT 3.9
0 31 Examination/MidWives 11.5
0 32 Examination/MidWives 11.6
Yes DX.CONCEALED SPLIT 3.9
0 33 Consultation /Interview 9
0 34 Consultation /Interview 11.6
Yes DX.CONCEALED SPLIT 3.9
0 35 Examination/MidWives 11.6
0 36 Examination/MidWives 11.6
Yes DX.CONCEALED SPLIT 3.9
0 37 Consultation /Interview 9
0 38 Consultation /Interview 9
Yes DX.CONCEALED SPLIT 3.9
0 39 Examination/MidWives 11.6
0 40 Examination/MidWives 11.6
Yes DX.CONCEALED SPLIT 3.9
0 41 Consultation /Interview 9
0 42 Consultation /Interview 9
Yes DX.CONCEALED SPLIT 3.9
0 43 Examination/MidWives 11.6
0 44 Examination/MidWives 11.8
Yes DX.CONCEALED SPLIT 5.1
0 45 Consultation /Interview 9.2
0 46 Toilets 11.2 No MECHANICAL EXHAUST -
0 47 Toilets 11.1 No MECHANICAL EXHAUST -
0 48 Store, equipment, 12.1 Yes DX.CASSETTE UNIT 3.2
0 49 Family Planning Clinic 12.1 Yes DX.CASSETTE UNIT 3.2
0 50 Family Planning Clinic 12.1 Yes DX.CASSETTE UNIT 3.1
0 51 Family Planning Clinic 12.1 Yes DX.CASSETTE UNIT 3.1
0 52 Consultation /Interview 12.1 Yes DX.CASSETTE UNIT 3.1
0 53 Ultrasound, obst/gyn.nd 12 Yes DX.CASSETTE UNIT 3.2
0 54 Janitor 6.7 No MECHANICAL EXHAUST -
0 55 Corridor 205 No CEILING FANS COMBINED WITH FRESH AIR -
0 56 Waiting 187.5 No CEILING FANS COMBINED WITH FRESH AIR -
1 1 Lobby 25.2 No - -
1 2 Data Processing 4.6 Yes DX.CASSETTE UNIT 1.2
1 3 Janitor 3.9 No MECHANICAL EXHAUST -
1 4 Soiled Utility 11.7 No MECHANICAL EXHAUST -
1 5 Clean Utility 11.7 Yes DX.CASSETTE UNIT 3.1
1 6 Staff Lounge / Pantry 33.9 Yes 4.4
DX.CONCEALED SPLIT
1 7 Gowning 20 Yes 1.2

Page 5 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

1 7a Shower 3.9 No MECHANICAL EXHAUST -


1 7b Shower 3.9 No MECHANICAL EXHAUST -
1 7c Toilet 3.3 No MECHANICAL EXHAUST -
1 7d Toilet 3.3 No MECHANICAL EXHAUST -
1 8 Operating Theatre,Gynaecology 50.5 Yes DX. AIR HANDLING UNIT 12.9
1 9 Scrub 7.1
1 11a Nurse Station Recovery 9.8 Yes DX.CONCEALED SPLIT 6.6
1 12 Clean Corridor 73.2
1 10 Operating Theatre,Gynaecology 50.5 Yes DX. AIR HANDLING UNIT 14.2
1 11 3 Bed Recovery (MGS) 24.7
1 11b Anesthetist 7.9 Yes DX.CONCEALED SPLIT 5.8
1 11c Surgical Store / TSSU 17
1 13 Clean Utility 11.9 Yes DX.CASSETTE UNIT 1.2
1 14 Soiled Utility 11.9 No MECHANICAL EXHAUST 2.8
1 15a NICU Bay A 36.8
1 15b NICU Bay B 24.3
1 15c NICU Bay C 24.3
1 15d NICU Bay D 24.5
Yes DX. AIR HANDLING UNIT 45.8
1 15e NICU Bay E 24.5
1 17 Kangaroo Care 39.7
1 42 Corridor NICU 49
1 16 Gowning 17
1 18 (Incubator Clean/Prep) 17.6 Yes DX.CASSETTE UNIT 1.5
1 19 Office, Doctor 7.4 Yes DX.CASSETTE UNIT 2.9
1 20 Reception / Access Control 26.3 No CEILING FANS SYSTEM -
1 21 Head Nurse 11 Yes DX.CASSETTE UNIT 2.9
1 22 Nurse Station 8.2 No CEILING FANS SYSTEM -
1 23 Store, equipment, 7.8 No CEILING FANS SYSTEM -
1 24 Labor / Delivery 11 Yes DX.CASSETTE UNIT 2.8
1 25 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 2.8
1 26 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 2.8
1 27 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 1.4
1 28 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 2.8
1 29 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 1.2
1 30 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 2.8
1 31 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 1.2
1 32 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 2.8
1 33 Labor / Delivery 11.1 Yes DX.CASSETTE UNIT 1.4
1 34 Day Room 23.1 Yes DX.CONCEALED SPLIT 7.4
1 35 Treatment 18.5 Yes DX.CASSETTE UNIT 3.3
1 36 Toilets 19 No MECHANICAL EXHAUST -
1 37a Ritual Washing 4.6 No MECHANICAL EXHAUST -

Page 6 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

1 37b Assisted Bathing 6.8 No MECHANICAL EXHAUST -


1 37c Ritual Washing 4.6 No MECHANICAL EXHAUST -
1 38 Showers 15.1 No MECHANICAL EXHAUST -
1 39 6-Bed Baywith Bassinets 50.1 No CEILING FANS COMBINED WITH FRESH AIR -
1 40 6-Bed Baywith Bassinets 50 No CEILING FANS COMBINED WITH FRESH AIR -
1 41 6-Bed Baywith Bassinets 49.2 No CEILING FANS COMBINED WITH FRESH AIR -
1 43 Corridor 65.3 No - -
1 44 Corridor 65.4 No CEILING FANS COMBINED WITH FRESH AIR -
1 45 Corridor 56.4 No - -
2 1 Lobby 25.2 No - -
2 2 Data Processing 4.6 Yes DX.CASSETTE UNIT 1
2 3 Janitor 3.9 No MECHANICAL EXHAUST -
2 4 Store, equipment, 11.7 No CEILING FANS SYSTEM -
2 5 Clean Utility 11.7 Yes DX.CASSETTE UNIT 3.1
2 6 Pantry 8.9 Yes DX.CASSETTE UNIT 2.7
2 7 Class Room 24.5 Yes DX.CONCEALED SPLIT 5.2
2 8 Treatment 18.4 Yes DX.CONCEALED SPLIT 1.60
2 9 Treatment 18.4 Yes DX.CONCEALED SPLIT 1.60
2 10 Day Room 36.8 Yes DX.CONCEALED SPLIT 5.9
2 11 6-BED Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
2 12 6-BED Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
2 13 10-BED Room 75.7 No CEILING FANS COMBINED WITH FRESH AIR -
2 14 Toilets 15.4 No MECHANICAL EXHAUST -
2 15a Ritual Washing 4.3 No MECHANICAL EXHAUST -
2 15b Soiled Utility 6.5 No MECHANICAL EXHAUST -
2 15c Ritual Washing 4.3 No MECHANICAL EXHAUST -
2 16 Showers 15.4 No MECHANICAL EXHAUST -
2 17 Staff Lounge / Pantry 24.3 Yes DX.CONCEALED SPLIT 5.9
2 17a Staff Change 11.9 No MECHANICAL EXHAUST -
2 17b Staff Change 11.7 No MECHANICAL EXHAUST -
2 18 6-Bed Bay 51.5 No CEILING FANS COMBINED WITH FRESH AIR -
2 19 1-Single Bed Room 17.9 Yes DX.CONCEALED SPLIT 3.3
2 20 1-Single Bed Room 17.9 Yes DX.CONCEALED SPLIT 3.1
2 20a Toilet/Shower 2.6 No MECHANICAL EXHAUST -
2 21 Office, Doctors 11.6 Yes DX.CASSETTE UNIT 2.9
2 22 Nurse Station 26.4 No CEILING FANS SYSTEM -
2 23 Head Nurse 11.5 Yes DX.CASSETTE UNIT 2.7
2 24 1-Single Bed Room 17.9 Yes DX.CONCEALED SPLIT 3.3
2 24a Toilet/Shower 2.6 No MECHANICAL EXHAUST -
2 25 1-Single Bed Room 17.9 Yes DX.CONCEALED SPLIT 3.3
2 25a Toilet/Shower 2.6 No MECHANICAL EXHAUST -
2 26 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -

Page 7 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

2 27 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -


2 28 2-Bed Room 21.1 Yes DX.CONCEALED SPLIT 3.3
2 29 Consultation /Examination 21.4 Yes DX.CONCEALED SPLIT 4.1
2 30 TOILETS 15.3 No MECHANICAL EXHAUST -
2 31a Ritual Washing 4.6 No MECHANICAL EXHAUST -
2 31b Assisted Bathing 6.8 No MECHANICAL EXHAUST -
2 31c Ritual Washing 4.5 No MECHANICAL EXHAUST -
2 32 Showers 15.1 No MECHANICAL EXHAUST -
2 33 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
2 34 6-Bed Bay 52.1 No CEILING FANS COMBINED WITH FRESH AIR -
2 35 6-Bed Bay 50.1 No CEILING FANS COMBINED WITH FRESH AIR -
2 36 CORRIDOR 170.6 No CEILING FANS COMBINED WITH FRESH AIR -
2 37 CORRIDOR 24.4 No CEILING FANS SYSTEM -
2 38 CORRIDOR 104.7 No CEILING FANS COMBINED WITH FRESH AIR -
3 1 Lobby 25.2 No - -
3 2 Data Processing 4.6 Yes DX.CASSETTE UNIT 1.1
3 3 Janitor 3.9 No MECHANICAL EXHAUST -
3 4 Store, equipment, 11.7 No CEILING FANS SYSTEM -
3 5 Clean Utility 11.7 Yes DX.CASSETTE UNIT 3.2
3 6 Staff Lounge / Pantry 33.9 Yes DX.CONCEALED SPLIT 6.2
3 7 Gowning 20 Yes DX.CASSETTE UNIT 2
3 7a Shower 3.9 No MECHANICAL EXHAUST -
3 7b Shower 3.9 No MECHANICAL EXHAUST -
3 7c Toilet 3.3 No MECHANICAL EXHAUST -
3 7d Toilet 3.3 No MECHANICAL EXHAUST -
3 8 Clean Corridor 64.2
3 11 Scrub 11.9 Yes DX.CONCEALED SPLIT 7.7
3 14a Nurse Station,Recovery 9.8
3 10 Operating Theatre,Gynaecology 50.5 Yes DX. AIR HANDLING UNIT 13.9
3 12 Technical Area OT's 12.1 No - -
3 13 Operating Theatre,Gynaecology 50.5 Yes DX. AIR HANDLING UNIT 15.3
3 14 3-Bed Recovery (MGS) 24.7
3 14b Anesthetist 7.9 Yes DX.CONCEALED SPLIT 6.5
3 14c Surgical Store / TSSU 17
3 15a Clean Utility 11.5 Yes DX.CASSETTE UNIT 1.3
3 15b soiled Utility 11.5 No MECHANICAL EXHAUST -
3 16 Toilets 15.4 No MECHANICAL EXHAUST -
3 17a Ritual Washing 4.3 No MECHANICAL EXHAUST -
3 17b Soiled Utility 6.5 No MECHANICAL EXHAUST -
3 17c Ritual Washing 4.3 No MECHANICAL EXHAUST -
3 18 Showers 15.4 No MECHANICAL EXHAUST -
3 19 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -

Page 8 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

3 20 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -


3 21 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 22 Office, Doctors 11.1 Yes DX.CASSETTE UNIT 3.2
3 23 Nurse Station 27.3 No CEILING FANS SYSTEM -
3 24 Head Nurse 11.1 Yes DX.CASSETTE UNIT 3.1
3 25 6-Bed Bay 51.3 No CEILING FANS COMBINED WITH FRESH AIR -
3 26 6-Bed Bay 51.3 No CEILING FANS COMBINED WITH FRESH AIR -
3 27 6-Bed Bay 51.3 No CEILING FANS COMBINED WITH FRESH AIR -
3 28 Treatment 18.5 Yes DX.CASSETTE UNIT 2.4
3 29 Day Room 22.9 Yes DX.CONCEALED SPLIT 7.3
3 30 Toilets 15.3 No MECHANICAL EXHAUST -
3 31a Ritual Washing 4.6 No MECHANICAL EXHAUST -
3 31b Assisted Bathing 6.8 No MECHANICAL EXHAUST -
3 31c Ritual Washing 4.5 No MECHANICAL EXHAUST -
3 32 Showers 15.1 No MECHANICAL EXHAUST -
3 33 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 34 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 35 6-Bed Bay 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
3 36 CORRIDOR 105.4 No CEILING FANS COMBINED WITH FRESH AIR -
3 37 CORRIDOR 24.4 No CEILING FANS SYSTEM -
3 38 CORRIDOR 98.9 No CEILING FANS COMBINED WITH FRESH AIR -
Building CC
0 1 Reception/Access Control 10.3
Yes DX.CONCEALED SPLIT 5.6
0 2 Medical Records 10.4
0 3 CORRIDOR 10.4 No - -
0 4 Corridor 195.5 No - -
0 5 Office, Pathologist 16 Yes DX.CASSETTE UNIT 3.7
0 6 Office, Pathologist 16 Yes DX.CASSETTE UNIT 3.7
0 7 Office, Pathologist 16 Yes DX.CASSETTE UNIT 3.7
0 8 Office, Pathologist 16 Yes DX.CASSETTE UNIT 3.7
0 9 Office, Doctor 15.8 Yes DX.CASSETTE UNIT 4.3
0 10 Scrub 5.1 No CEILING FANS SYSTEM -
0 11 Store, Histopathology 16 Yes DX.CASSETTE UNIT 2.5
0 12 Soiled Utility 12.6 No MECHANICAL EXHAUST -
0 12a Janitor 2.9 No MECHANICAL EXHAUST -
0 13 Clean Utility 16 No CEILING FANS SYSTEM -
0 14 Sterilization 16 No CEILING FANS SYSTEM -
0 15 Histology Laboratory 49.5 Yes DX.CONCEALED SPLIT 11.3
0 16 Pathology Laboratory 24.2 Yes DX.CONCEALED SPLIT 7.1
0 17 Conference/Lecture Room 24.2 Yes DX.CONCEALED SPLIT 6.9
0 18 Staff Lounge / Pantry 26.9 Yes DX.CONCEALED SPLIT 8.3
0 19 Staff Change 16 No MECHANICAL EXHAUST -

Page 9 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

0 20 Staff Change 16 No MECHANICAL EXHAUST -


0 21 Office 16 Yes DX.CASSETTE UNIT 3.4
0 21a Work shop 10.4 Yes DX.CASSETTE UNIT 2
0 22 Bier Room (Viewing) 21.5 Yes DX.CASSETTE UNIT 4.4
0 23 Data Processing 5.1 Yes DX.HIGH WALL SPLIT 1.5
0 24 Autopsy, 2 tables 100.1 Yes DX.CONCELED SPLIT UNIT WITH VENTILATION VIA HOOD 23.3
0 25 Mortuary Body Store 116.6 No CEILING FANS SYSTEM -
0 26 Mortuary Body Store (Future Expansion) 32.4 No - -
0 28 Body Wash 15.8 No CEILING FANS COMBINED WITH EXHAUST AIR System -
0 29 Body Wash 15.5 No CEILING FANS COMBINED WITH EXHAUST AIR System -
0 30 Laying Out Room 11 Yes DX.HIGH WALL SPLIT 2
0 31 Body Wash 15.5 Yes CEILING FANS COMBINED WITH EXHAUST AIR System -
0 32 Body Wash 15.9 Yes CEILING FANS COMBINED WITH EXHAUST AIR System -
0 33 Toilets 5 No MECHANICAL EXHAUST -
0 34 Toilets 5 No MECHANICAL EXHAUST -
0 35 Waiting 128.2 No CEILING FANS SYSTEM -
Building TT
0 1 Lobby 20.1 No CEILING FANS SYSTEM -
0 2 Data Processing 8.9 Yes DX.CASSETTE UNIT 1.2
0 3 Consultation /Interview 11.7 Yes DX.CASSETTE UNIT 2.9
0 4 Consultation /Interview 11.7 Yes DX.CASSETTE UNIT 2.7
0 5 Store, general,departments 8.9 No CEILING FANS SYSTEM -
0 6 Resuscitation Room 24.5 Yes DX.CONCEALED SPLIT 3.9
0 7 Clean Utility /Stat Lab 11.9 Yes DX.CASSETTE UNIT 1.3
0 8 Soiled Utility 12.1 No CEILING FANS SYSTEM -
0 9 Assisted Bathing 12.1 No CEILING FANS SYSTEM -
0 10 Treatment 12.1 Yes DX.CASSETTE UNIT 3
0 11 Treatment 12.3 Yes DX.CASSETTE UNIT 3.2
0 12 Resuscitation / Triage 104.6 No CEILING FANS COMBINED WITH FRESH AIR -
0 13 Nurse Station 12.3 No CEILING FANS COMBINED WITH FRESH AIR -
0 14 Office, Nurse 12.3 Yes DX.CASSETTE UNIT 3.4
0 15 On Call 21.1 Yes DX.CONCEALED SPLIT 3.9
0 15a Shower /Toilet 3.4 No MECHANICAL EXHAUST -
0 16 Waiting 28.7 No CEILING FANS SYSTEM -
0 17 Toilet 7.8 No MECHANICAL EXHAUST -
0 18 Assisted Toilet 5.3 No MECHANICAL EXHAUST -
0 19 Toilet 7.8 No MECHANICAL EXHAUST -
0 20 Pantry 20 Yes DX.CASSETTE UNIT 3.8
0 21 Office, Doctor 12 Yes DX.CASSETTE UNIT 3.4
0 22 Nurse Station 12.4 No CEILING FANS SYSTEM -
0 22a Janitor 7 No MECHANICAL EXHAUST -
0 23 6-Bed Observation / Recovery 50.4 No CEILING FANS COMBINED WITH FRESH AIR -

Page 10 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

0 24 6-Bed Observation / Recovery 50.6 No CEILING FANS COMBINED WITH FRESH AIR -
0 25 Toilets/Showers 11 No MECHANICAL EXHAUST -
0 26a Ritual Washing 6.8 No MECHANICAL EXHAUST -
0 26b Assisted Bathing 10.2 No MECHANICAL EXHAUST -
0 26c Ritual Washing 7 No MECHANICAL EXHAUST -
0 27 Toilets/Showers 11.2 No MECHANICAL EXHAUST -
0 28 6-Bed Observation / Recovery 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
0 29 6-Bed Observation / Recovery 51.1 No CEILING FANS COMBINED WITH FRESH AIR -
0 30 6-Bed Observation / Recovery 51 No CEILING FANS COMBINED WITH FRESH AIR -
0 31 Corridor 75.5 No CEILING FANS COMBINED WITH FRESH AIR -
0 32 Corridor 50.3 No CEILING FANS SYSTEM -
1 1 Lobby 23.8 No - -
1 2 Parmacy, OPD 20.5 Yes DX.CONCEALED SPLIT 4
1 3 Optician,Dispensing / Laboratory 20.5 Yes DX.CONCEALED SPLIT 3.6
1 4 Ophthalmology Screening 20.5 Yes DX.CONCEALED SPLIT 3.3
1 5 Ophthalmology Visual Test 20.5 Yes DX.CONCEALED SPLIT 3.3
1 6 Ophthalmology IOP 20.5 Yes DX.CONCEALED SPLIT 3.3
1 7 Scrub 12.2
1 9 Patient Change 3.7 Yes DX. AIR HANDLING UNIT 14.4
1 10 Operating Theatre,Ophthalmology 50.5
1 11 Surgical Store /TSSU 23.3 Yes DX.CONCEALED SPLIT 3.2
1 12 Staff Lounge / Pantry 24.3 Yes DX.CONCEALED SPLIT 3.7
1 12a Toilets 7.6 No MECHANICAL EXHAUST -
1 12b Toilets 7.7 No MECHANICAL EXHAUST -
1 13 Staff Change 3.3 No - -
1 14 Patient Change 3.3 No - -
1 15 Ophthalmology,Laser 17.1 Yes DX.CONCEALED SPLIT 3.5
1 17 Ophthalmology ,Peripheral Field 24.5 Yes DX.CONCEALED SPLIT 3.7
1 18 Ophthalmology ,Fundus Camera 24.5 Yes DX.CONCEALED SPLIT 3.8
1 19 Janitor 7.9 No MECHANICAL EXHAUST -
1 20 Office 16.6 Yes DX.CASSETTE UNIT 3.8
1 21 Office 11.9 Yes DX.CASSETTE UNIT 3.5
1 22 Nurse Station 12.1 No CEILING FANS SYSTEM -
1 23 Waiting 25 No CEILING FANS SYSTEM -
1 24 Reception /Access Control 9 No CEILING FANS SYSTEM -
1 25 Toilets 7.4 No MECHANICAL EXHAUST -
1 26 Toilets 7.9 No MECHANICAL EXHAUST -
1 27 Staff Lounge / Pantry 24.2 Yes DX.CONCEALED SPLIT 3.7
1 28 Shower /Toilet 7.7 No MECHANICAL EXHAUST -
1 29 Shower /Toilet 7.7 No MECHANICAL EXHAUST -
1 31 Toilets 7.4 No MECHANICAL EXHAUST -
1 32 Dialysis Station 77.3 Yes DX.CONCEALED SPLIT 10.9

Page 11 of 12
Tamale Teaching Hospital - Phase 2
Appendix -1
Cooling Loads/ HVAC system List
April, 2013 - Rev. 0

Room
Floor Description Area (m2) Air Conditioning System Served Estimated Cooling Capacity (kW)
Number

1 33a Store Disposables 12.1 Yes DX.CONCEALED SPLIT


5.4
1 33b Technical Room,Dialysis 12.3 Yes DX.CONCEALED SPLIT
1 34a Store,Reagents 12.1 Yes DX.CONCEALED SPLIT
5.4
1 34b Technical Room,Dialysis 12.3 Yes DX.CONCEALED SPLIT
1 35 Dialysis Station 51.1 Yes DX.CONCEALED SPLIT 8.2
1 36 Clean Utility 11.9 Yes DX.CASSETTE UNIT 3
1 37 Soiled Utility 11.9 No MECHANICAL EXHAUST -
1 38 Data Processing 7.4 Yes DX.CASSETTE UNIT 1.2
1 39 Office 16.6 Yes DX.CASSETTE UNIT 3.4
1 40 Office 12.5 Yes DX.CASSETTE UNIT 3.1
1 41 Nurse Station 12
Yes DX.CONCEALED SPLIT 8.4
1 42 Corridor 74.5
1 43 Corridor 24.3 No - -
1 44 Corridor 66.3 No - -
1 45 Corridor 31 Yes DX.CONCEALED SPLIT 4.3

Page 12 of 12