Transmitter Calibration

with the Fluke 750 Series


Documenting Process Calibrator

Application Note

The precision sourcing and measurement 1. Connect a type K mini- 3. Once your connections are
capabilities of the rugged Fluke Documenting connector into the “TC” input made, starting from the DPC
Process Calibrator (DPC) make it an ideal choice of the DPC and connect to power up state (or measure
for the calibration of process instrumentation. the thermocouple input of screen), select the “mA” but-
The following examples show how to address trans- the transmitter (Figure 1). It ton to measure milliamps
mitter calibrations quickly and effectively using the is necessary that you use the (Figure 2).
Fluke 753 or 754 Documenting Process Calibrators. correct type of mini-connec-
tor for this connection to the
DPC.
2. Connect the center two ter-
minals of the DPC to the con-
Calibrating a 2 Wire Thermocouple nections on the transmitter
Transmitter with the Fluke 750 Series where loop power is applied
Documenting Process Calibrators (Figure 1).
The transmitter in this example is a 2 wire trans- Note: If you prefer to use house
mitter (needs loop power). The input stimulus for loop power rather than supplying
Figure 2.
this device is from a type K thermocouple with an loop power from the DPC, connect
input range of 100 °C to 300 °C at 0 % and 100 %. these two leads in series with the 4. Next depress the “MEAS/
The output drawn against loop power is 4-20 mA loop supply to the transmitter. SOURCE” button; now you are
at 0 % and 100 % with a tolerance of 0.25 %. The in the source screen.
steps below show how to: 1) perform a three point Since you want to source a
ascending (3↑) As Found (pre-adjustment) test at thermocouple, press “TC/RTD”
0-50-100 %, and Tag the results, 2) adjust the once. Press ENTER to select
zero and span (span = 100 %) of the transmitter, TC. Use the down arrow to
then 3) perform a three point ascending As Left move the cursor to “K” and
(post-adjustment) test at 0-50-100 %, Tag those then press “enter.” Select
results and review them in memory. 754 DOCUMENTIN
“Linear T” and press ENTER.
The DPC will respond with
G PROCESS
CALIBRATOR

????? asking for a tempera-


ture to source. Depress “100”
and “enter” (Figure 3).
Figure 3.
Rosemount 444

TEST DC PWR
– ++ –

Fluke DPC

Figure 1.
5. Next press the “MEAS/ 0.25 %. As long as the error
SOURCE” button once and exceeds .25 % the error win-
you will be in the split screen dow in the measure half of
mode (Figure 4). the screen will be in reverse
video. Adjust the zero on the
transmitter until the error is
less than 0.25 %. Next, select
“Go to 100 %” and adjust the
Figure 7. transmitter span in the same
way. You may also “Go to
8. Select “Auto Test,” and watch 50 %” to check linearity at
the DPC take 0 %, 50 % and mid-span.
100 % measurements of cur-
12. After adjustment is complete,
Figure 4. rent (4, 12 and 20 mA nomi-
select “As Left,” “Done” and
Note: Skip to step 7 if you are nal) while sourcing 100 °C,
“Autotest.” Watch the 0-50-
measuring current in series using 200 °C and 300 °C.
100 % evaluations. If the
the house loop power source 9. Once the DPC has completed adjustment was successful,
mentioned in step (2). this evaluation, it will display all the errors in the post run
the post test summary screen summary should be in normal
6. Next, depress the “SETUP” with the SOURCE, MEASURE video (or less than .25 %)
button on the DPC. The cursor and ERROR columns. Failures (Figure 10).
should begin on loop power. in the error column will be
Depress “ENTER,” down in reverse video (Figure 8).
arrow until the DPC cursor Depress “Done.”
is on Enabled and depress
“ENTER.” Next depress the
“Done” softkey (Figure 5).

Figure 10.

13. Select “Done,” “Done,” and


Figure 8. “Done” again and you are
done!
10. Now you are presented with To review your results
Figure 5.
the Tag entry screen (Figure 9). in memory, select the “More
Choices” soft key, the “Review
7. At this point depress Memory” soft key and move your
“As Found” and select cursor to the applicable result and
“Instrument” and press press enter. Select “As Found”
“ENTER,” then fill in the or “As Left,” then “ENTER” and
template, use the default review the setup for the test,
“Delay=0 seconds.”) select “Next Page” for the results,
and press “Tag” for its associated
Figure 9.
label. Select “Done” and “Done”.
Move your cursor to the applicable
Press the “ENTER” key to edit “As Left” result and press “ENTER”
the entries. Depress “Done” and review the test setup, select
when complete until the split “Next Page” for the results, and
screen reappears with the press “Tag” for its associated
soft key options of “As Left,” label. When you are finished
Figure 6.
“Adjust,” “Save” and “More reviewing results, press “Done”
Choices” on the display of the until right-most soft key label
Depress “DONE.” You should changes to “More Choices.”
now see the split screen and DPC.
are presented with soft key 11. At this point, select “Adjust”
choices of “Abort,” “Auto and the DPC will source 0 %
Test,” and “Manual Test” and measure for 4 mA to
(Figure 7).

2 Fluke Corporation 750 Series Documenting Process Calibrators


3 and 4 Wire RTD Sourcing for the Fluke 750 Series
Documenting Process Calibrators
One of the most frequently asked application questions pertaining to
the 750 Series Documenting Process Calibrators is, “How do I hook
up the test leads to the DPC to source 3 and 4 wire RTDs?” For 3 and
4 wire RTD measurement, the DPC has embedded hookup diagrams
that easily show you how to connect the DPC. However, for 3 and 4
wire RTD source, the DPC does not offer that assistance.
The example shown below (Figure 11) depicts the hookup for a 3
and 4 wire Rosemount 444 RTD Transmitter. You will need an addi-
tional pair of TL22 test leads and AC20 industrial test clips to complete
all the connections necessary for this application. In order to double
the available connections to the source terminals on the DPC, you also
will need to utilize the short black jumpers supplied with the Docu-
menting Process Calibrator.

754 DOCUMENT
ING PROC
ESS CALIB
RATOR

C-1

C-2

S-2
TEST DC PWR
– ++ –

S-4

S-1

S-3

Fluke DPC

Figure 11.

1. Make the RTD source 3. Once the connections are 4. At this point, enter the split
connections, S1, S2, S3 and made as per the diagram in screen mode of the DPC and
S4 (omit S3 and S4 for 2 wire Figure 11, enable the loop perform the As Found, Adjust
RTDs and S4 for 3 wire RTDs; 24 volt power from the setup and As Left tests as you did
S4 is only needed for 4 wire screen, source the pertinent in the previous thermocouple
RTD sourcing). RTD for the specific transmit- transmitter example.
2. Next, connect the loop power ter being evaluated, and set
and current measurement the measure mode to mA.
connections, C1 and C2.

Fluke Corporation 750 Series Documenting Process Calibrators 3


Calibration of an I to P (Current to
Pressure) with the Fluke 750 Series
Documenting Process Calibrators
A common device in the Fluke DPC workload
is the I to P. The I to P device is used to con- 754 DOCUMENTING PROCESS CALIBRATOR

vert electrical loop analog control of 4-20 mA


to pneumatic analog loop control of 3-15 PSI.
+
The device in this example is an I to P with
current input values of 4-20 mA for 0 % and
100 % with output range of 3-15 PSI for 0 %
and 100 %, +/- 2 %. This step-by-step exam-
ple describes how to: 1) perform a three point Pressure
Module
ascending (3↑) As Found (pre-adjustment) test
at 0-50-100 %, Tag the results, 2) Adjust the
zero and span (span = 100 %) of the I to P,
then 3) perform a three point ascending As
Left (post-adjustment) test at 0-50-100 %, Tag
those results and review them in memory.

1. Connect the pressure module


to the DPC. Connect the out- Figure 12.
put of the I to P to the input
of the pressure module. If you
are using a differential pres- Since you want to source a
sure module, make sure (for current, depress “mA.” Depress
this example) that it is a 15 754 DOCUMENTING PROCESS CALIBRATOR

“enter” which chooses “Source


PSI module and connect to mA” when given the choice of
the input labeled “H” Pressure Button “Source mA” or “Simulate Trans-
(Figure 12). mitter.” When the DPC responds
2. Connect from the center two with ????? asking for a current to
banana type connections of source, depress “4” and “enter.”
the DPC to the input of the I
to P where control current is 5. Next depress the “MEAS/
supplied (Figure 12). SOURCE” button once and you
should be in the split screen
3. Once your connections are mode (Figure 15).
made, assuming you are in
the power up state (or mea-
sure screen), select the “Pres-
sure” button (directly above
the “Range” button) (Figure
13).
4. Next depress the “MEAS/ Figure 13.
SOURCE” button; now you are
in the source screen
Figure 15.
(Figure 14).

Figure 14.

4 Fluke Corporation 750 Series Documenting Process Calibrators


6. At this point depress “As 9. Now you see the Tag entry
Found”, select “Instrument” screen (Figure 18).
and press “ENTER,” then fill
in the template as shown in
figure 16.

Figure 18.

Press the “ENTER” key to edit


Figure 16. the entries. Depress “Done”
when complete until the split
Press “DONE.” You should screen reappears with the
now see the split screen, soft key options of: “As Left,”
with soft key choices of “Adjust,” “Save,” and ”More
“Abort,” “Auto Test” and Choices.”
“Manual Test.”
10. At this point, select “Adjust”
7. Select “Manual Test,” and and the DPC will source 0 %
watch the DPC start at 0 %. (4 mA) and measure for 3 PSI
Once the reading has settled, to 2 %. As long as the error
depress “accept point.” Per- exceeds 2 % the Error win-
form the 50 % and 100 % dow in the measure half of
measurements the same way. the screen will be in reverse
video. Adjust the zero on the
8. Once the 753/754 has com-
I to P until the error is less
pleted this evaluation, it
than 2 %. Next select “Go to
will display the post test
100 %” and adjust span in To review your results in
summary screen with the
the same way. Select “Go to memory, select the “More
SOURCE, MEASURE and
50 %” and evaluate linearity.
ERROR columns. Failures Choices” soft key, then the
appear in reverse video in 11. After adjustments are com- “Review Memory” soft key.
the Error column (Figure 17). plete, select “As Left,” “Done” Move your cursor to the
Depress “Done.” and “Manual Test” and repeat applicable result and press
step (8). If the adjustment
was successful, all the errors ENTER. Select “As Found”
in the post run summary or “As Left,” then “ENTER.
should be in normal video Press “Next Page” for the
(Figure 19). results, and press “Tag” for its
associated label. Select “Done”
and “Done” and move your
cursor to the applicable “As
Figure 17. Left” result and press “enter.”
Review the setup for the test,
select “Next Page” for the
results, and press “Tag” for
its associated label. When you
Figure 19.
are finished reviewing results,
12. Select “Done,” “Done,” and press “Done” until right-most
“Done” again and you are soft key label changes to
done! “More Choices.”

Fluke Corporation 750 Series Documenting Process Calibrators 5


Calibration of a Pressure Transmitter
(Pressure to Current or P to I) with
the Fluke 750 Series Documenting
Process Calibrators
A common device in the Fluke DPC work- Hand Pump
load is the pressure transmitter or P to I 754 DOCUMENTING PROCESS CALIBRATOR

device. The P to I device is used to convert


pneumatic analog loop control signals of +
3-15 PSI or other measured pressures to
electrical loop analog control signals of
4-20 mA. The device in this example is a
P to I with pressure input values of 3-15
Pressure
PSI for 0 % and 100 % with output range
Module
(drawn from loop power) of
4-20 mA for 0 % and 100 %, +/- 2 %.
In this step-by-step example we will:
1) perform a three point ascending (3↑)
As Found (pre-adjustment) test at 0-50-
100 %, and Tag the results, 2) adjust the
zero and span (100 %) of the P to I, then
3) perform a three point ascending As Left
(post-adjustment) test at 0-50-100 %, tag
those results and review them in memory.

Figure 20.

1. Connect the pressure module 5. Next depress the “MEAS/ 7. Next depress the “MEAS/
to the DPC. Connect the input SOURCE” button; now you are SOURCE” button once and
of the P to I and the output in the source screen (Figure you should be in the split
of a pressure hand pump 21). screen mode (Figure 23).
to the input of the pressure
module using a “T” connector
(Figure 20). If you are using a
differential pressure module,
ensure (for this example) it is
a 15 PSI module and connect
to input labeled “H.”
2. Connect from the center 2
banana type connections of Figure 21. Figure 23.
the DPC to the input of the P
to I where loop power 6. Since we wish to source
is supplied (Figure 20). a pressure (using a hand
3. Next, depress the “SETUP” but- pump) depress the pressure
ton on the DPC. The cursor button, (directly above the
should begin on loop power. HART or range button)
Depress “ENTER,” down (Figure 22).
arrow to Enabled and depress
“ENTER.” Next depress the
“Done” softkey.
754

4. Once your connections are


DOCUMENTING PROCESS CALIBRATOR

made, assuming you are


Pressure Button
in the power up state (or
measure screen), select the
mA button.

Figure 22.

6 Fluke Corporation 750 Series Documenting Process Calibrators


8. At this point depress “As if you are sourcing 3.120 PSI Press the “ENTER” key to
Found”, select “Instrument” (1% of span above nominal), edit the entries, press “Done”
and press “ENTER,” then fill the DPC will look for a mA when complete until the split
in the template per Figure 24. reading of 4.160 mA (also 1% screen reappears with the
of span above nominal). In soft key options of: “As Left,”
order to make a proper evalu- “Adjust,” “Save,” and “More
ation of the device you need Choices.”‘
only to get reasonably close
12. At this point, select “Adjust”
to the nominal pressure val-
and the DPC will source
ues with the hand pump. The
0%, instruct you to “Go to
remaining source pressure
3 PSI” and measure for 4 mA
error is compensated for by
to 2%. As long as the error
the DPC during mA measure
Figure 24. exceeds 2% the Error win-
calculations.
dow in the measure half of
Depress “DONE.” You should 10. Once the DPC has completed the screen will be in reverse
now see the split screen and this evaluation, it will display video. Adjust the zero on the
are presented with soft key the post test summary screen P to I until the error is less
choices of “Abort,” “Auto with the SOURCE, MEASURE than 2 %. Next select “Go to
Test,” and “Manual Test.” and ERROR columns (Figure 100 %” and adjust span in
26). Depress “Done.” the same way.
9. Select Manual Test, and 13. After adjustment is complete,
watch the DPC for the select “As Left,” “Done” and
prompt: “Go to 3 PSI” “Manual Test” and repeat
(Figure 25). step (9). If the adjustment
was successful, all the errors
in the post run summary
should be in normal video
(Figure 28).
Figure 26.

11. Now you are presented with


the Tag entry screen (Figure
Figure 25. 27).

At that point using the hand


pump, pump until the DPC
display is reasonably close Figure 28.
to 3 PSI and depress “Accept
Point.” Now the DPC should 14. Select “Done,” “Done,” and
display “Go to 9 PSI.” Again, “Done” again and you are
using the hand pump, pump done!
up reasonably close to 9 PSI Figure 27.
and depress “Accept Point.”
When the DPC responds with
“Go to 15 PSI” pump to that
value and “Accept Point.”
It is important to understand To review your results in memory, select “More
a key feature of the DPC at Choices” soft key, “Review Memory” soft key, move your
this point. When the error cursor to the applicable and press “ENTER” and review
is being calculated on the the setup for the test, select “Next Page” for the results,
measured mA by the DPC,
depress “Tag” for its associated label. Select “Done” and
it will make the calculation
based on the deviation of “Done” next move your cursor to the applicable “As Left”
the amount of pressure being result and depress “ENTER” and review the setup for the
sourced. What this means is, test, select “Next Page” for the results, depress “Tag”
for its associated label. When you are finished review-
ing results, press “Done” until right-most soft key label
changes to “More Choices.”

Fluke Corporation 750 Series Documenting Process Calibrators 7


Note on Uploading Results to Your PC
If you are using a 743/744 or 753/754, you may choose an
instrumentation management software package from this list:

Fluke DPC/TRACK2™

AMS from Emerson Process PRM (Plant Resource


Management, (formerly Manager) from Yokogawa
Fisher-Rosemount). Electric Corporation.

On Time Support
Process/Track

All trademarks are the property of their respective holders.

Additional information is available for download from


www.fluke.com on these products
• Pressure Calibration Application Note
• Custom Units Application Note
• Switch Test Application Note
• HART Calibration Application Note
• Process Tools Accessories

Fluke. Keeping your world


up and running.®

Fluke Corporation
PO Box 9090, Everett, WA 98206 U.S.A.
Fluke Europe B.V.
PO Box 1186, 5602 BD
Eindhoven, The Netherlands
For more information call:
In the U.S.A. (800) 443-5853 or
Fax (425) 446-5116
In Europe/M-East/Africa +31 (0) 40 2675 200 or
Fax +31 (0) 40 2675 222
In Canada (800)-36-FLUKE or
Fax (905) 890-6866
From other countries +1 (425) 446-5500 or
Y
MA
NAG E M E NT
SY
Fax +1 (425) 446-5116
IT
Web access: http://www.fluke.com
ST
AL

E
QU


M

ISO 9001 ©2010-2011 Fluke Corporation.


Specifications subject to change without notice.
Printed in U.S.A. 8/2011 3792201B A-EN-N
CE

01
90
RT

IF
IE O
D T IS
O M EET
Modification of this document is not permitted
without written permission from Fluke Corporation.

8 Fluke Corporation 750 Series Documenting Process Calibrators

You might also like