PERHITUNGAN PONDASI TIANG PANCANG DITITIK 102

Nu 63780.86 kg
Beban Tetap Beban Sementara
Mx 4761.38 kgm Mx 4761.38 kgm
My 3634.93 kgm My 3634.93 kgm

kolom 40 40 cm Nu 63780.86 63780.86


Ag 14 X 50 560

t = 0.3 m
= 113.9 kg / cm2
= 11.39 Mpa

fp = 1/6x f'c x ( 1 + Nu / 14 Ag )
= 1/6x 20 x ( 1 + 4.94 / 14 )
= 0.745 1.814
= 1.3517 Mpa
= 135.173 ton / m2

135 = 63.78086
0.25
( 1 + t ) x 4t
63.78 = 540.69059 540.690592
0.5

t = 0.1066 m
0.5

dipakai t = 0.3 m 30 cm
0.25

1.5

Pembebanan :
Berat poer pondasi = 1.50 x 1.50 x 0.3 x 2.4 = 1.620 ton
P kolom aksial = = 63.781 ton
Nu total 65.401 ton

Daya dukung ijin sebuah tiang pancang O 30 cm ( Qsp ) = 33.640 ton

Jumlah tiang pancang yang dibutuhkan = Nu total = 65.401 1.944 bh


Qsp 33.640

dipakai jumlah tiang pancang = 3 buah

Momen yang timbul terhadap papan beton ( titik O )


63780.86 Yo = Mx
Yo = 4761.38 = 0.074652 m
63780.86

63780.86 Xo = My
Xo = 3634.93 = 0.056991 m
63780.86

Momen yang timbul terhadap pusat berat poer ( titik O )


Mx = 63780.86 x 0.057 + 4761
= 3634.93 + 4761.4
= 8396.31 kg m
My = 63780.86 x 0.075 + 3635
= 4761.38 + 3635
= 8396.31 kg m

Ordinat tiang pancang dari pusat berat tiang ( titik O )


X1 = 0.5 m Y1 = 0.5 m
X2 = 0 m Y2 = 0 m
X3 = -0.5 m Y3 = -0.5 m

EX = 2 x 0.25 x2 = 1 m
EY = 2 x 0.25 x2 = 1 m

Daya dukung kelompok tiang :

Pi = V + Mx Yi + My Xi
n EY EX

= 65400.86 + 8396.31 0.5 + 8396.31 0.5


3 1 1

= 21800.29 + 4198.155 + 4198.155

= 30196.6 kg

= 30.197 ton < Qsp = 33.640 ton oke

Chek geser ponds :

Nu 63780.86 kg

kolom 60 60 cm

30

44

90 cm

Tp = D
Keliling h

= 63780.86
2 x ( 44 + 80 ) 35

= 6.800 < Tp = 10 kg / cm
< Tpm = 20 kg / cm
Chek geser lentur b= 150 cm

Tl = D
7/8 bxh

= 63780.86 8
150 x 27 7

= 13.884 kg / cm > Tb = 6.5 kg / cm


< Tbm = 16 kg / cm

Penulangan lentur

Mx = 8396.31 h eff = 35 cm

h eff
Cu =
1.5 x M
2 x ko x bk x b

35
=
1.5 8396.31
2.0,5 ### 1

= 4.678

Dari tabel Cu didapat q = 0.049

A = 0.049 35 225 x 100 = 13.8804 Cm


2780

dipasang tulangan :
A = D 16 - 15 cm A = 14 > 13.8803957 Cm
A' = D 13 - 15 cm

My = 8396.31 h eff = 35 cm

h eff
Cu =
1.5 x M
2 x ko x bk x b

35
=
1.5 8396.31
2.0,5 ### 1
= 4.678
Dari tabel Cu didapat q = 0.049

A = 0.049 35 225 x 100 = 13.8804 Cm


2780

dipasang tulangan :
A = D 16 - 15 cm A = 14 > 13.8803957 Cm
A' = D 13 - 15 cm
PERHITUNGAN PONDASI TIANG PANCANG

Nu 75288.02 kg
Beban Tetap Beban Sementara
Mx 38.96 kgm Mx 38.96 kgm
My 7.24 kgm My 7.24 kgm

kolom 14 45 cm Nu 75288.02 75288.02


Ag 14 X 50 630

t = 0.3 m
= 119.5 kg / cm2
= 11.95 Mpa

fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4.94 / 14 )
= 0.745 1.854
= 1.3816 Mpa
= 138.160 ton / m2

138.2 = 75.28802
0.25
( 1 + t ) x 4t
75.29 = 552.638437 552.6384372
0.5
t = 0.1215 m
0.5
dipakai t = 0.3 m 50 cm
0.25

1.5

Pembebanan :
Berat poer pondasi = 1.25 x 1.25 x 0.3 x 2.4 = 2.700 ton
P kolom aksial = = 75.288 ton
Nu total 77.988 ton

Daya dukung ijin sebuah tiang pancang O 30 cm ( Qsp ) = 27.000 ton

Jumlah tiang pancang yang dibutuhkan = Nu total = 77.988 2.888 bh


Qsp 27.000

dipakai jumlah tiang pancang = 3 buah

Momen yang timbul terhadap papan beton ( titik O )


75288.02 Yo = Mx
Yo = 38.96 = 0.0005175 m
75288.02

75288.02 Xo = My
Xo = 7.24 = 9.616E-05 m
75288.02
Momen yang timbul terhadap pusat berat poer ( titik O )
Mx = 75288.02 x 0.000 + 39
= 7.24 + 39.0
= 46.2 kg m

My = 75288.02 x 0.001 + 7
= 38.96 + 7
= 46.2 kg m

Ordinat tiang pancang dari pusat berat tiang ( titik O )


X1 = 0.25 m Y1 = 0.25 m
X2 = 0 m Y2 = 0 m
X3 = -0.25 m Y3 = 0.25 m

EX = 2 x 0.25 x 1.0 = 0.125 m


EY = 2 x 0.25 x 1.5 = 0.1875 m

Daya dukung kelompok tiang :

Pi = V + Mx Yi + My Xi
n EY EX

= 77988.02 + 46.2 0.25 + 46.2 0.25


3 0.1875 0.125

= 25996.01 + 61.6 + 92.4

= 26150.01 kg

= 26.150 ton < Qsp = 27.000 ton oke


PERHITUNGAN PONDASI TIANG (GRID 3)

Nu 54518.02 kg
Beban Tetap Beban Sementara
Mx 4294.07 kgm Mx 4294.07 kgm
My 3896.47 kgm My 3896.47 kgm

kolom 45 cm Nu 54518.02 54518.0


Ag 30 X 45 1350

t = 0.5 m
= 40.4 kg / cm2
= 4.04 Mpa

fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4.38 / 14 )
= 0.745 1.288
= 0.9604 Mpa
= 96.036 ton / m2

96.036 = 54.51802
45
( 1 + t ) x 4t
54.51802 = 384.143101563 384.1431016

t = 0.1260 m

dipakai t = 0.5 m 50 cm
45

25 90 25

90

Pembebanan :
Berat poer pondasi = 1.5 x 1.5 x 0.5 x 2.4 = 2.700 ton
P kolom aksial = = 54.518 ton
Nu total 57.218 ton

Daya dukung ijin sebuah tiang pancang O 30 cm ( Qsp ) = 36.399 ton

Jumlah tiang pancang yang dibutuhkan = Nu total = 57.218 1.572 bh


Qsp 36.399

dipakai jumlah tiang pancang = 2 buah

Momen yang timbul terhadap papan beton ( titik O )


54518.02 Yo = Mx
Yo = 4294.07 = 0.079 m
54518.02

54518.02 Xo = My
Xo = 3896.47 = 0.071 m
54518.02

Momen yang timbul terhadap pusat berat poer ( titik O )


Mx = 54518.02 x 0.071 + 4294
= 3896.47 + 4294.1
= 8190.54 kg m

My = 54518.02 x 0.079 + 3896


= 4294.07 + 3896
= 8190.54 kg m
Ordinat tiang pancang dari pusat berat tiang ( titik O )
X1 = 0.5 m Y1 = 0.5 m
X2 = 0 m Y2 = 0 m
X3 = -0.5 m Y3 = -0.5 m

EX = 2 x 0.5 x 1.5 = 0.75 m


EY = 2 x 0.0000 x 1.0 = 0.75 m

Daya dukung kelompok tiang :

Pi = V + Mx Yi + My Xi
n EY EX

= 57218.02 + 8190.54 0.5 + 8190.54 0.5


2 0.75 0.75

= 28609.01 + 5460.36 + 5460.36

= 39529.73 kg

= 39.530 ton < Qsp = 36.399 ton oke

Chek geser ponds :

Nu 54518.02 kg

kolom 14 45 cm

50

44

95 cm

Tp = D
Keliling h

= 54518.02
2 x ( 44 + 75 ) 47

= 4.173 < Tp = 10 kg / cm
< Tpm = 20 kg / cm

Chek geser lentur b= 150 cm

Tl = D
7/8 bxh

= 54518.02 8
150 x 27 7

= 8.838 kg / cm > Tb = 6.5 kg / cm


< Tbm = 16 kg / cm
Penulangan lentur

Mx = 8190.54 Kgm h(eff) = 47 cm


fy = 390 Mpa
fc = 20 Mpa

AS = Mu/f0,9*d*fy = 620.608 mm2

As perlu = 700 mm2


r =As perlu/B*d = 0.009929078014184 > r min = 0.00358974359
r min =1.4/FY = 0.003589743589744
rb =b1*((0.85*f'c)/fy)+(600/(600+fy)) = 0.976573426573427 > r = 0.009929078014
r max =0.75*rb = 0.73243006993007
Lengan momen (a)=(Aperlu*fy)/(0.85*f'c*b) = 10.7058823529412
fMn =fAs*fy(d-0.5a) = 101478917.647059 Nmm
= 10147.8917647059 kgm > Mu 8190.54 kgm Ok!

dicoba tulangan D13-150


D16 = 283.385 mm2

Jumlah ( n ) = 2.47 buah


Jarak tulangan ( S ) = 607.3 mm

Penulangan lentur

My = 8190.54 Kgm h(eff) = 47 cm


fy = 390 Mpa
fc = 20 Mpa

AS = Mu/f0,9*d*fy = 620.608 mm2

As perlu = 7000 mm2


r =As perlu/B*d = 0.099290780141844 > r min = 0.00358974359
r min =1.4/FY = 0.003589743589744
rb =b1*((0.85*f'c)/fy)+(600/(600+fy)) = 0.976573426573427 > r = 0.099290780142
r max =0.75*rb = 0.73243006993007
Lengan momen (a)=(Aperlu*fy)/(0.85*f'c*b) = 107.058823529412
fMn =fAs*fy(d-0.5a) = 909571764.705883 Nmm
= 90957.1764705882 kgm > Mu 8190.54 kgm Ok!

dicoba tulangan D19-60


D16 = 283.385 mm2

Jumlah ( n ) = 24.70 buah


Jarak tulangan ( S ) = 40.5 mm
Design Pile Cap (Tanpa tulangan geser)

A. Data teknis 14
Gaya aksial (b. mati+b. hidup) (Pu) = ### kg
Momen perlu (M1) = 147 kgm Pu
Mutu beton (K125 ,K175, K225) = 175 kg/cm2
fy = 240 Mpa
Lebar kolom pondasi(b) = 20 cm Ph
Lebar tiang pancang(b') = 30 cm

Lebar pile cap (B) = 200 cm Mu


Tebal pile cap (ht) = 12 cm
Penutup beton (Pb) = 4 cm
1 2

d=
12
B. Analisa
a.Tebal pile cap dan penulangan
T.
Berat sendiri pile cap = 1152 kg
Pancang
Beban pertiang (ada 4tiang) = ### kg 35x35
akibat My 0.35 0.4 0.2 0.4 0.35
tiang 1,3 ----> tertarik keatas
P1 = P3 = ### kg B=200
tiang 2,4----> tertekan kebawah
T. Pancang
P2 = P4 = ### kg 35x35

b
Geser Pons
b
h=ht-Pb = 8 cm

B=200
luas bidang geser =4(b+h)*h = 4(20+h)*h
tbpu =Pu/(4(b+h)*h) <= t*bpu = ### kg/cm2 ### 13 ###

Cek Geser
potongan 2-2 B=200
D2-2= Ptiang - berat sendiri kepala tiang = ### kg

tbu =1.5*D2-2/0.9*B*h <= t*bu(b.sementara) = ### kg/cm2 ### 11 ###


0.75 q
1
Momen lentur potongan 1-1
berat sendiri pile cap (q) = 576 kg/m
M1-1 = ### kgm 0.4
#VALUE!
1
Cu = 8 = ###
#VALUE! Tabel Cara kekuatan batas
2(0.5)*(2)*(175) Ir. Wiratman
d = 0.2
q = 0.0675
t*au = 2080 kg/cm2
Amin=q*B*h*(2*0.5*mutu beton)/
t *au = 9.08654 cm2
dicoba dia. Tul (d) = 10 mm
jarak = 15 cm

Mydoc/titip/jal/design/pondasi.xls
Luas tulangan = 10.472 cm2 > 9.087 Ok !!!

A'=0.2*Amin = 1.81731 cm2


dicoba dia. Tul (d) = 6 mm
jarak = 20 cm
Luas tulangan = 2.82743 cm2 > 1.817 Ok !!!

untuk Cu>5.51,dipakai nilai q minimum


Amin =0.25%*B*h = 4 cm2
dicoba dia. Tul (d) = 10 mm
jarak = 15 cm
Luas tulangan = 10.472 cm2 > 4 Ok !!!

A'=0.2*Amin = 0.8 cm2


dicoba dia. Tul (d) = 6 mm
jarak = 20 cm
Luas tulangan = 2.82743 cm2 > 0.8 Ok !!!

Mydoc/titip/jal/design/pondasi.xls
PERHITUNGAN PONDASI PLAT LANTAI

Nu 150 kN

Mx 35 kNm Ꝺt ( trgangan ijin Tanah ) = 0.733 Kg/cm2


1.5 My 25 kNm 73.3 kN/m2
ϒtanah 15 kN/m3
ϒbeton 24 kN/m3

Menentukan Ketebalan Plat


t = 0.3 m
0.3 Dicoba = 300 mm
Ꝺt = 73.3 kN/m2
pc = 7.20 kN/m2
pt = 22.50 kN/m2
Hitung Daya Dukung Tanah netto

Ꝺnetto = Ꝺt - pc - pt
= 43.6 kN/m2

2 m Luasan Telapak Pondasi Yang Dibutuhkan

Af = Nu
Ꝺnetto
2 = 150
43.6
= 3.44 m2
Dicoba Dimensi Telapak :
B = 2 m
L = 2 m
At = 4.00 m2

Chek = At > Af
4.00 > 3.44 OK
Geser 1 Arah

d a

ds

Data - Data
f'c = 20 Mpa
fy = 390 Mpa
B = 1200 mm
h (tebal plat) = 300 mm
D.tul = 16 mm
Sb = 40 mm
ds = 48 mm
d = 252 mm
Vu = 150 kN

Tegangan geser yang ditahan oleh beton


0,17 .1. 〖√ f 〗 ^′ c . B .
Vc = d
= 229903.5652 N
= 229.90 kN

Kontrol = ØVc > Vu


= 172.43 kN > 150 kN OK
Geser 2 arah ( geser ponds )
Vu = 150 kN
hk

d/2 a

0
d

ds
44
400

400

βc = L/B
= 2.((bk+d)+(hk+d))
1
bo =
= 2608 mm

αs = Konstanta yang nilainya tergantung dari letak kolom


αs = 40 tepi gedung
30 tengah gedung
20 sudut gedung
Tegangan geser yang ditahan oleh beton
0,17.(1+2/βc).ƛ.√fc.bo.d
Vc =

= 1498971.245 N
= 1498.971245 kN
0,083.(2+(αs .d)/bo).ƛ.√fc.bo.d
Vc =

= 1435947.014 N
1435.947014 kN
0,33.ƛ.√fc.bo.d
Vc =

= 969922.570 N
969.923 kN

Dipakai yang terkecil


Vc = 969.9226 kN
φVc = 727.4419 kN

Kontrol = 727.4419 > 150 OK


Jadi Poer aman dari geser 2 arah

PENULANGAN POER
Penulangan arah x

Mu = 35 kNm

Dia. Tul = 16 mm
As tul = 201 mm2
Rn = Mu = 0.051 N/mm2
φ . b . d2
m = fy
0,85 * fc = 22.94 N/mm2

ρmin = 1.4 = 0.0035897


fy

1/m(1-√(1-(2Rn.m)/fy)
1/m(1-√(1-(2Rn.m)/fy)
ρperlu =

= 0.043589744 0.00301
= 0.000131
(β1.0,85.fc)/fy +
ρb = 600/(600+fy)

= 0.037051282 x 0.61

= 0.022

ρmax = 0,75*ρb = 0.016

Karena = ρmin > ρperlu < ρmax

maka digunakan :

As = ρ min x b x d

= 1085.54 mm2
Sada = As tul * 1200
As

= 185.12 mm
Spakai = 100 mm

As ada = As tul * 1000


Spakai

= 2009.60 mm2

Kontrol As ada > As

2009.60 > 1085.54 OK


Maka digunakan tulangan D16 - 100
Penulangan arah y

Mu = 25 kNm

Dia. Tul = 16 mm
As tul = 201 mm2
Rn = Mu = 0.036 N/mm2
φ . b . d2
m = fy
0,85 * fc = 22.94 N/mm2

ρmin = 1.4 = 0.0035897


fy

1/m(1-√(1-(2Rn.m)/fy)
ρperlu =

= 0.043589744 0.00215
= 0.000094

ρb (β1.0,85.fc)/fy +
= 600/(600+fy)

= 0.037051282 x 0.61

= 0.022

ρmax = 0,75*ρb = 0.016

Karena = ρmin > ρperlu < ρmax

maka digunakan :

As = ρ min x b x d

= 1085.54 mm2
Sada = As tul * 2000
As

= 185.12 mm
Spakai = 100 mm

As ada = As tul * 1000


Spakai

= 2009.60 mm2

Kontrol As ada > As

2009.60 > 1085.54 OK


Maka digunakan tulangan D16 - 100
PERHITUNGAN PONDASI BORE PILE DITITIK 97

Nu #VALUE! kg
Beban Tetap Beban Sementara
Mx #VALUE! kgm Mx #VALUE! kgm
My #VALUE! kgm My #VALUE! kgm

14 30 cm Nu #VALUE! #VALUE!
Ag 14 X 35 420

t = 0.5 m
= #VALUE! kg / cm2
= #VALUE! Mpa

fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4,89 / 14 )
= 0.745 #VALUE!
= #VALUE! Mpa
= #VALUE! ton / m2

### = #VALUE!
0.6
( 1 + t ) x 2t
### = #VALUE! #VALUE!

t = #VALUE! m

dipakai t = 0,3 m 50 cm
0.6

Pembebanan :
Berat poer pondasi = 1.2 x 1.2x 0.5 x 2.4 = 1.728 ton
P kolom aksial = = #VALUE! ton
Nu total #VALUE! ton

Daya dukung ijin sebuah tiang pancang O 30 cm ( Qsp ) = 36.399 ton

Jumlah tiang pancang yang dibutuhkan = Nu total = #VALUE! #VALUE! bh


Qsp 36.399

dipakai jumlah tiang pancang = 1 buah

Momen yang timbul terhadap papan beton ( titik O )


#VALUE! Yo = Mx
Yo = #VALUE! = #VALUE! m
#VALUE!

#VALUE! Xo = My
Xo = #VALUE! = #VALUE! m
#VALUE!

Momen yang timbul terhadap pusat berat poer ( titik O )


Mx = #VALUE! x #VALUE! + ###
= #VALUE! + #VALUE!
= #VALUE! kg m

My = #VALUE! x #VALUE! + ###


= #VALUE! + #VALUE!
= #VALUE! kg m
Ordinat tiang pancang dari pusat berat tiang ( titik O )
X1 = 0 m Y1 = 0 m
X2 = 0 m Y2 = 0 m
X3 = 0 m Y3 = 0 m

EX = 2 x 0.25 x 1.0 = 0 m
EY = 2 x 0.0000 x 1.0 = 0 m

Daya dukung kelompok tiang :

Pi = V + Mx Yi + My Xi
n EY EX

= #VALUE! + #VALUE! 0 + #VALUE! 0


1 0 0

= #VALUE! + 0 + 0

= #VALUE! kg

= #VALUE! ton < Qsp = 36.399 ton oke

Chek geser ponds :

Nu #VALUE! kg

kolom 14 30 cm

50
44

80 cm

Tp = D
Keliling h

= #VALUE!
2 x ( 44+80 ) 46
#VALUE!
11408
= #VALUE! kg/cm2 < 18 kg/cm2

Chek geser lentur b= 120 cm

Tl = D
7/8 bxh

= #VALUE!
7/8 x 120 x 46
#VALUE!
4830

= #VALUE! kg/cm2 < 18 kg/cm2


Penulangan lentur

Mx = #VALUE! h eff = 46 cm
PERHITUNGAN PONDASI BORE PILE DITITIK 68

Nu 19654.87 kg
Beban Tetap Beban Sementara
Mx 1.28 kgm Mx 1.28 kgm
My 44.25 kgm My 44.25 kgm

kolom 14 35 cm Nu 19654.87 19654.87


Ag 14 X 35 490

t = 0.3 m
= 40.1 kg / cm2
= 4.01 Mpa

fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 3.93 / 14 )
= 0.745 1.287
= 0.9589 Mpa
= 95.891 ton / m2

95.89 = 19.65487
0.25
( 1 + t ) x 4t
19.65 = 383.564409 383.5644095
0.25
t = 0.0489 m
0.25
dipakai t = 0.3 m 30 cm
0.25

Pembebanan :
Berat poer pondasi = 1.0 x 1.0 x 0.3 x 2.4 = 0.720 ton
P kolom aksial = = 19.655 ton
Nu total 20.375 ton

Daya dukung ijin sebuah tiang pancang O 20 cm ( Qsp ) = 15.800 ton

Jumlah tiang pancang yang dibutuhkan = Nu total = 20.375 1.290 bh


Qsp 15.800

dipakai jumlah tiang pancang = 2 buah

Momen yang timbul terhadap papan beton ( titik O )


19654.87 Yo = Mx
Yo = 1.28 = 6.512E-05 m
19654.87

19654.87 Xo = My
Xo = 44.25 = 0.0022514 m
19654.87
Momen yang timbul terhadap pusat berat poer ( titik O )
Mx = 19654.87 x 0.002 + 1
= 44.25 + 1.3
= 45.53 kg m

My = 19654.87 x 0.000 + 44
= 1.28 + 44
= 45.53 kg m

Ordinat tiang pancang dari pusat berat tiang ( titik O )


X1 = 0.25 m Y1 = 0 m
X2 = 0 m Y2 = 0 m
X3 = -0.25 m Y3 = 0 m

EX = 2 x 0.25 x 1.0 = 0.125 m


EY = 2 x 0.0000 x 1.0 = 0 m

Daya dukung kelompok tiang :

Pi = V + Mx Yi + My Xi
n EY EX

= 20374.87 + 45.53 0 + 45.53 0.25


2 0 0.125

= 10187.44 + 0 + 91.06

= 10278.5 kg

= 10.278 ton < Qsp = 15.800 ton oke

Chek geser ponds :

Nu 19654.87 kg

kolom 14 35 cm

30
44

65 cm
Tp = D
Keliling h

= 19654.87
2 x ( 44+65 ) 27

= 3.339 < Tp = 10 kg / cm
< Tpm = 20 kg / cm

Chek geser lentur b= 100 cm

Tl = D
7/8 bxh

= 19654.87 8
100 x 27 7

= 8.320 kg / cm > Tb = 6.5 kg / cm


< Tbm = 16 kg / cm

Penulangan lentur

Mx = 45.53 h eff = 27 cm

h eff
Cu =
1.5 x M
2 x ko x bk x b

27
=
1.5 45.53
2.0,5 225 1

= 49.007

Dari tabel Cu didapat q = 0.06875

A = 0.06875 27 225 x 100 = 15.024 Cm


2780

dipasang tulangan :
A = D 16 - 12.5 cm A = 16.085 > 15.02360612 Cm
A' = D 12 - 12.5 cm

My = 45.53 h eff = 27 cm

h eff
Cu =
1.5 x M
2 x ko x bk x b

27
=
1.5 45.53
2.0,5 225 1

= 49.007

Dari tabel Cu didapat q = 0.06875

A = 0.06875 27 225 x 100 = 15.024 Cm


2780

dipasang tulangan :
A = D 16 - 12.5 cm A = 16.085 > 15.02360612 Cm
A' = D 12 - 12.5 cm
PERHITUNGAN PONDASI TIANG PANCANG DITITIK 63

Nu 51894.18 kg
Beban Tetap Beban Sementara
Mx 122.31 kgm Mx 122.31 kgm
My 49.39 kgm My 49.39 kgm

kolom 14 45 cm Nu 51894.18 51894.18


Ag 14 X 35 630

t = 0.3 m
= 82.4 kg / cm2
= 8.24 Mpa

fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4.94 / 14 )
= 0.745 1.588
= 1.1839 Mpa
= 118.390 ton / m2

118.4 = 51.89418
0.25
( 1 + t ) x 4t
51.89 = 473.560257 473.560257
0.25
t = 0.0997 m
0.25
dipakai t = 0.3 m 30 cm
0.25

Pembebanan :
Berat poer pondasi = 1.0 x 1.0 x 0.3 x 2.4 = 0.720 ton
P kolom aksial = = 51.894 ton
Nu total 52.614 ton

Daya dukung ijin sebuah tiang pancang O 30 cm ( Qsp ) = 27.000 ton

Jumlah tiang pancang yang dibutuhkan = Nu total = 52.614 1.949 bh


Qsp 27.000

dipakai jumlah tiang pancang = 2 buah


Momen yang timbul terhadap papan beton ( titik O )
51894.18 Yo = Mx
Yo = 122.31 = 0.0023569 m
51894.18

51894.18 Xo = My
Xo = 49.39 = 0.0009517 m
51894.18

Momen yang timbul terhadap pusat berat poer ( titik O )


Mx = 51894.18 x 0.001 + 122
= 49.39 + 122.3
= 171.7 kg m

My = 51894.18 x 0.002 + 49
= 122.31 + 49
= 171.7 kg m

Ordinat tiang pancang dari pusat berat tiang ( titik O )


X1 = 0.25 m Y1 = 0 m
X2 = 0 m Y2 = 0 m
X3 = -0.25 m Y3 = 0 m

EX = 2 x 0.25 x 1.0 = 0.125 m


EY = 2 x 0.0000 x 1.0 = 0 m

Daya dukung kelompok tiang :

Pi = V + Mx Yi + My Xi
n EY EX

= 52614.18 + 171.7 0 + 171.7 0.25


2 0 0.125

= 26307.09 + 0 + 343.4

= 26650.49 kg

= 26.650 ton < Qsp = 27.000 ton oke


Chek geser ponds :

Nu 51894.18 kg

kolom 14 45 cm

30

44

75 cm

Tp = D
Keliling h

= 51894.18
2 x ( 44+ 65 ) 27

= 8.076 < Tp = 10 kg / cm
< Tpm = 20 kg / cm

Chek geser lentur b= 100 cm

Tl = D
7/8 bxh

= 51894.18 8
100 x 27 7

= 21.966 kg / cm > Tb = 6.5 kg / cm


< Tbm = 16 kg / cm

Penulangan lentur

Mx = 171.7 h eff = 27 cm

h eff
Cu =
1.5 x M
2 x ko x bk x b

27
=
1.5 171.7
2.0,5 ### 1

= 25.236

Dari tabel Cu didapat q = 0.06875

A = 0.06875 27 225 x 100 = 15.024 Cm


2780

dipasang tulangan :
A = D 16 - 12.5 cm A = 16.085 > 15.0236061 Cm
A' = D 12 - 12.5 cm

My = 171.7 h eff = 27 cm

h eff
Cu =
1.5 x M
2 x ko x bk x b

27
=
1.5 171.7
2.0,5 ### 1

= 25.236

Dari tabel Cu didapat q = 0.06875

A = 0.06875 27 225 x 100 = 15.024 Cm


2780
dipasang tulangan :
A = D 16 - 12.5 cm A = 16.085 > 15.0236061 Cm
A' = D 12 - 12.5 cm
REAKSI STRUKTUR D SMP MENGWI :
Table: Joint Reactions, Part 1 of 2 D -STR
Table: Joint Reactions, Part 1 of 2

Joint OutputCase StepType F3 M1 M2


Kgf Kgf-m Kgf-m
81 COMB2 Max 49070.18 4470.55 3126.53
82 COMB2 Max 55832.76 4425.55 3606.28
83 COMB2 Max 55832.76 4425.55 3305.92
84 COMB2 Max 49070.18 4470.55 2857.15
85 COMB2 Max 49073.87 4771.69 3146.55
86 COMB2 Max 63780.86 4761.38 3634.93
87 COMB2 Max 63780.86 4761.38 3322.02
88 COMB2 Max 49073.87 4771.69 2877.3
89 COMB2 Max 55286.15 3297.71 3730.12
90 COMB2 Max 53826.34 3290.64 3613.68
91 COMB2 Max 53826.34 3290.64 3687.26
92 COMB2 Max 55286.15 3297.71 3679.47
93 COMB2 Max 55163.5 2450.3 3750.05
94 COMB2 Max 54027.69 2449.76 3662.05
95 COMB2 Max 54027.69 2449.76 3684.69
96 COMB2 Max 55163.5 2450.3 3706.2
325 COMB3 Max 47876.17 5675.15 3288.01
326 COMB2 Max 56965.76 5673.5 2818.65
327 COMB2 Max 56965.76 5673.5 3251.56
328 COMB2 Max 50553.61 5675.85 2430.19

REAKSI SMP MENGWI TIPE E :


Table: Joint Reactions, Part 1 of 2
Table: Joint Reactions, Part 1 of 2
Joint OutputCase CaseType StepType F3 M1 M2
Kgf Kgf-m Kgf-m
81 COMB2 Combination Max 49223.18 4805.22 3090.87
82 COMB2 Combination Max 56175.82 4760.26 3568.7
83 COMB2 Combination Max 56118.63 4759.88 3267.37
84 COMB2 Combination Max 56744.23 4670.64 3525.74
85 COMB2 Combination Max 49234.14 5106.3 3099.01
86 COMB2 Combination Max 64140.69 5095.93 3583.93
87 COMB2 Combination Max 64053.61 5095.99 3270.21
88 COMB2 Combination Max 56793.37 4994.53 3534.98
89 COMB2 Combination Max 55345.9 3527.81 3692.21
90 COMB2 Combination Max 53929.03 3520.77 3575.51
91 COMB2 Combination Max 53740.05 3518.33 3649.06
92 COMB2 Combination Max 54388.18 3511.03 3602.09
93 COMB2 Combination Max 55218.02 2680.4 3698.24
94 COMB2 Combination Max 54131.07 2679.83 3610.21
95 COMB2 Combination Max 53948.12 2678.57 3632.99
96 COMB2 Combination Max 54245.27 2667.88 3614.6
385 COMB2 Combination Max 49223.18 4805.22 2821.47
386 COMB2 Combination Max 56175.82 4760.26 3268.59
387 COMB2 Combination Max 56118.63 4759.88 3567.63
388 COMB2 Combination Max 49234.14 5106.3 2829.78
389 COMB2 Combination Max 64140.69 5095.93 3271.24
390 COMB2 Combination Max 64053.61 5095.99 3583.06
391 COMB2 Combination Max 55345.9 3527.81 3641.54
392 COMB2 Combination Max 53929.03 3520.77 3649.12
393 COMB2 Combination Max 53740.05 3518.33 3582.52
394 COMB2 Combination Max 54388.18 3511.03 3615.14
395 COMB2 Combination Max 55218.02 2680.4 3654.4
396 COMB2 Combination Max 54131.07 2679.83 3632.83
397 COMB2 Combination Max 53948.12 2678.57 3617.38
398 COMB2 Combination Max 54245.27 2667.88 3620.9
596 COMB2 Combination Max 50490.86 6070.16 3300.21
597 COMB2 Combination Max 56955.32 6067.88 2808.22
598 COMB2 Combination Max 56936.13 6067.9 3240.84
599 COMB2 Combination Max 69304.26 6107.56 3021.56
600 COMB2 Combination Max 50490.86 6070.16 2421.5
601 COMB2 Combination Max 56955.32 6067.88 3241.21
602 COMB2 Combination Max 56936.13 6067.9 2808.26
REAKSI PERLETAKAN SMP SADING TIPE F : G- CANOPI
Table: Joint Reactions, Part 1 of 2
Table: Joint Reactions, Part 1 of 2

Joint OutputCase StepType F3 M1 M2

Kgf Kgf-m Kgf-m

81 COMB2 Max 49717.86 4745.62 2951.98

82 COMB2 Max 69689.98 5122.76 3474.9

83 COMB2 Max 69689.98 5122.76 3403.95

84 COMB2 Max 49717.86 4745.62 2687.22

85 COMB2 Max 49082.23 5048.07 3066.43

86 COMB2 Max 65774.27 4688.12 3583.78

87 COMB2 Max 65774.27 4688.12 3548.14

88 COMB2 Max 49082.23 5048.07 2799.72

89 COMB2 Max 55252.89 3515.25 3530.64

90 COMB2 Max 58771.86 3619.02 3479.1

91 COMB2 Max 58771.86 3619.02 3385.32

92 COMB2 Max 55252.89 3515.25 3470.12

93 COMB2 Max 55171.03 2637.08 3665.06

94 COMB2 Max 58182.49 2517.44 3587.01

95 COMB2 Max 58182.49 2517.44 3536.2

96 COMB2 Max 55171.03 2637.08 3600.85

343 COMB2 Max 14806.95 2268.16 1244.29

344 COMB2 Max 14806.95 2268.16 1132.57

345 COMB2 Max 10965.99 1995.77 1238.88

346 COMB2 Max 10965.99 1995.77 1105.92

353 COMB2 Max 50447.07 5989.46 3208.98

354 COMB2 Max 50447.07 5989.46 2341.45

You might also like