Pondasi Plat
Pondasi Plat
Nu 63780.86 kg
Beban Tetap Beban Sementara
Mx 4761.38 kgm Mx 4761.38 kgm
My 3634.93 kgm My 3634.93 kgm
t = 0.3 m
= 113.9 kg / cm2
= 11.39 Mpa
fp = 1/6x f'c x ( 1 + Nu / 14 Ag )
= 1/6x 20 x ( 1 + 4.94 / 14 )
= 0.745 1.814
= 1.3517 Mpa
= 135.173 ton / m2
135 = 63.78086
0.25
( 1 + t ) x 4t
63.78 = 540.69059 540.690592
0.5
t = 0.1066 m
0.5
dipakai t = 0.3 m 30 cm
0.25
1.5
Pembebanan :
Berat poer pondasi = 1.50 x 1.50 x 0.3 x 2.4 = 1.620 ton
P kolom aksial = = 63.781 ton
Nu total 65.401 ton
63780.86 Xo = My
Xo = 3634.93 = 0.056991 m
63780.86
EX = 2 x 0.25 x2 = 1 m
EY = 2 x 0.25 x2 = 1 m
Pi = V + Mx Yi + My Xi
n EY EX
= 30196.6 kg
Nu 63780.86 kg
kolom 60 60 cm
30
44
90 cm
Tp = D
Keliling h
= 63780.86
2 x ( 44 + 80 ) 35
= 6.800 < Tp = 10 kg / cm
< Tpm = 20 kg / cm
Chek geser lentur b= 150 cm
Tl = D
7/8 bxh
= 63780.86 8
150 x 27 7
Penulangan lentur
Mx = 8396.31 h eff = 35 cm
h eff
Cu =
1.5 x M
2 x ko x bk x b
35
=
1.5 8396.31
2.0,5 ### 1
= 4.678
dipasang tulangan :
A = D 16 - 15 cm A = 14 > 13.8803957 Cm
A' = D 13 - 15 cm
My = 8396.31 h eff = 35 cm
h eff
Cu =
1.5 x M
2 x ko x bk x b
35
=
1.5 8396.31
2.0,5 ### 1
= 4.678
Dari tabel Cu didapat q = 0.049
dipasang tulangan :
A = D 16 - 15 cm A = 14 > 13.8803957 Cm
A' = D 13 - 15 cm
PERHITUNGAN PONDASI TIANG PANCANG
Nu 75288.02 kg
Beban Tetap Beban Sementara
Mx 38.96 kgm Mx 38.96 kgm
My 7.24 kgm My 7.24 kgm
t = 0.3 m
= 119.5 kg / cm2
= 11.95 Mpa
fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4.94 / 14 )
= 0.745 1.854
= 1.3816 Mpa
= 138.160 ton / m2
138.2 = 75.28802
0.25
( 1 + t ) x 4t
75.29 = 552.638437 552.6384372
0.5
t = 0.1215 m
0.5
dipakai t = 0.3 m 50 cm
0.25
1.5
Pembebanan :
Berat poer pondasi = 1.25 x 1.25 x 0.3 x 2.4 = 2.700 ton
P kolom aksial = = 75.288 ton
Nu total 77.988 ton
75288.02 Xo = My
Xo = 7.24 = 9.616E-05 m
75288.02
Momen yang timbul terhadap pusat berat poer ( titik O )
Mx = 75288.02 x 0.000 + 39
= 7.24 + 39.0
= 46.2 kg m
My = 75288.02 x 0.001 + 7
= 38.96 + 7
= 46.2 kg m
Pi = V + Mx Yi + My Xi
n EY EX
= 26150.01 kg
Nu 54518.02 kg
Beban Tetap Beban Sementara
Mx 4294.07 kgm Mx 4294.07 kgm
My 3896.47 kgm My 3896.47 kgm
t = 0.5 m
= 40.4 kg / cm2
= 4.04 Mpa
fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4.38 / 14 )
= 0.745 1.288
= 0.9604 Mpa
= 96.036 ton / m2
96.036 = 54.51802
45
( 1 + t ) x 4t
54.51802 = 384.143101563 384.1431016
t = 0.1260 m
dipakai t = 0.5 m 50 cm
45
25 90 25
90
Pembebanan :
Berat poer pondasi = 1.5 x 1.5 x 0.5 x 2.4 = 2.700 ton
P kolom aksial = = 54.518 ton
Nu total 57.218 ton
54518.02 Xo = My
Xo = 3896.47 = 0.071 m
54518.02
Pi = V + Mx Yi + My Xi
n EY EX
= 39529.73 kg
Nu 54518.02 kg
kolom 14 45 cm
50
44
95 cm
Tp = D
Keliling h
= 54518.02
2 x ( 44 + 75 ) 47
= 4.173 < Tp = 10 kg / cm
< Tpm = 20 kg / cm
Tl = D
7/8 bxh
= 54518.02 8
150 x 27 7
Penulangan lentur
A. Data teknis 14
Gaya aksial (b. mati+b. hidup) (Pu) = ### kg
Momen perlu (M1) = 147 kgm Pu
Mutu beton (K125 ,K175, K225) = 175 kg/cm2
fy = 240 Mpa
Lebar kolom pondasi(b) = 20 cm Ph
Lebar tiang pancang(b') = 30 cm
d=
12
B. Analisa
a.Tebal pile cap dan penulangan
T.
Berat sendiri pile cap = 1152 kg
Pancang
Beban pertiang (ada 4tiang) = ### kg 35x35
akibat My 0.35 0.4 0.2 0.4 0.35
tiang 1,3 ----> tertarik keatas
P1 = P3 = ### kg B=200
tiang 2,4----> tertekan kebawah
T. Pancang
P2 = P4 = ### kg 35x35
b
Geser Pons
b
h=ht-Pb = 8 cm
B=200
luas bidang geser =4(b+h)*h = 4(20+h)*h
tbpu =Pu/(4(b+h)*h) <= t*bpu = ### kg/cm2 ### 13 ###
Cek Geser
potongan 2-2 B=200
D2-2= Ptiang - berat sendiri kepala tiang = ### kg
Mydoc/titip/jal/design/pondasi.xls
Luas tulangan = 10.472 cm2 > 9.087 Ok !!!
Mydoc/titip/jal/design/pondasi.xls
PERHITUNGAN PONDASI PLAT LANTAI
Nu 150 kN
Ꝺnetto = Ꝺt - pc - pt
= 43.6 kN/m2
Af = Nu
Ꝺnetto
2 = 150
43.6
= 3.44 m2
Dicoba Dimensi Telapak :
B = 2 m
L = 2 m
At = 4.00 m2
Chek = At > Af
4.00 > 3.44 OK
Geser 1 Arah
d a
ds
Data - Data
f'c = 20 Mpa
fy = 390 Mpa
B = 1200 mm
h (tebal plat) = 300 mm
D.tul = 16 mm
Sb = 40 mm
ds = 48 mm
d = 252 mm
Vu = 150 kN
d/2 a
0
d
ds
44
400
400
βc = L/B
= 2.((bk+d)+(hk+d))
1
bo =
= 2608 mm
= 1498971.245 N
= 1498.971245 kN
0,083.(2+(αs .d)/bo).ƛ.√fc.bo.d
Vc =
= 1435947.014 N
1435.947014 kN
0,33.ƛ.√fc.bo.d
Vc =
= 969922.570 N
969.923 kN
PENULANGAN POER
Penulangan arah x
Mu = 35 kNm
Dia. Tul = 16 mm
As tul = 201 mm2
Rn = Mu = 0.051 N/mm2
φ . b . d2
m = fy
0,85 * fc = 22.94 N/mm2
1/m(1-√(1-(2Rn.m)/fy)
1/m(1-√(1-(2Rn.m)/fy)
ρperlu =
= 0.043589744 0.00301
= 0.000131
(β1.0,85.fc)/fy +
ρb = 600/(600+fy)
= 0.037051282 x 0.61
= 0.022
maka digunakan :
As = ρ min x b x d
= 1085.54 mm2
Sada = As tul * 1200
As
= 185.12 mm
Spakai = 100 mm
= 2009.60 mm2
Mu = 25 kNm
Dia. Tul = 16 mm
As tul = 201 mm2
Rn = Mu = 0.036 N/mm2
φ . b . d2
m = fy
0,85 * fc = 22.94 N/mm2
1/m(1-√(1-(2Rn.m)/fy)
ρperlu =
= 0.043589744 0.00215
= 0.000094
ρb (β1.0,85.fc)/fy +
= 600/(600+fy)
= 0.037051282 x 0.61
= 0.022
maka digunakan :
As = ρ min x b x d
= 1085.54 mm2
Sada = As tul * 2000
As
= 185.12 mm
Spakai = 100 mm
= 2009.60 mm2
Nu #VALUE! kg
Beban Tetap Beban Sementara
Mx #VALUE! kgm Mx #VALUE! kgm
My #VALUE! kgm My #VALUE! kgm
14 30 cm Nu #VALUE! #VALUE!
Ag 14 X 35 420
t = 0.5 m
= #VALUE! kg / cm2
= #VALUE! Mpa
fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4,89 / 14 )
= 0.745 #VALUE!
= #VALUE! Mpa
= #VALUE! ton / m2
### = #VALUE!
0.6
( 1 + t ) x 2t
### = #VALUE! #VALUE!
t = #VALUE! m
dipakai t = 0,3 m 50 cm
0.6
Pembebanan :
Berat poer pondasi = 1.2 x 1.2x 0.5 x 2.4 = 1.728 ton
P kolom aksial = = #VALUE! ton
Nu total #VALUE! ton
#VALUE! Xo = My
Xo = #VALUE! = #VALUE! m
#VALUE!
EX = 2 x 0.25 x 1.0 = 0 m
EY = 2 x 0.0000 x 1.0 = 0 m
Pi = V + Mx Yi + My Xi
n EY EX
= #VALUE! + 0 + 0
= #VALUE! kg
Nu #VALUE! kg
kolom 14 30 cm
50
44
80 cm
Tp = D
Keliling h
= #VALUE!
2 x ( 44+80 ) 46
#VALUE!
11408
= #VALUE! kg/cm2 < 18 kg/cm2
Tl = D
7/8 bxh
= #VALUE!
7/8 x 120 x 46
#VALUE!
4830
Mx = #VALUE! h eff = 46 cm
PERHITUNGAN PONDASI BORE PILE DITITIK 68
Nu 19654.87 kg
Beban Tetap Beban Sementara
Mx 1.28 kgm Mx 1.28 kgm
My 44.25 kgm My 44.25 kgm
t = 0.3 m
= 40.1 kg / cm2
= 4.01 Mpa
fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 3.93 / 14 )
= 0.745 1.287
= 0.9589 Mpa
= 95.891 ton / m2
95.89 = 19.65487
0.25
( 1 + t ) x 4t
19.65 = 383.564409 383.5644095
0.25
t = 0.0489 m
0.25
dipakai t = 0.3 m 30 cm
0.25
Pembebanan :
Berat poer pondasi = 1.0 x 1.0 x 0.3 x 2.4 = 0.720 ton
P kolom aksial = = 19.655 ton
Nu total 20.375 ton
19654.87 Xo = My
Xo = 44.25 = 0.0022514 m
19654.87
Momen yang timbul terhadap pusat berat poer ( titik O )
Mx = 19654.87 x 0.002 + 1
= 44.25 + 1.3
= 45.53 kg m
My = 19654.87 x 0.000 + 44
= 1.28 + 44
= 45.53 kg m
Pi = V + Mx Yi + My Xi
n EY EX
= 10187.44 + 0 + 91.06
= 10278.5 kg
Nu 19654.87 kg
kolom 14 35 cm
30
44
65 cm
Tp = D
Keliling h
= 19654.87
2 x ( 44+65 ) 27
= 3.339 < Tp = 10 kg / cm
< Tpm = 20 kg / cm
Tl = D
7/8 bxh
= 19654.87 8
100 x 27 7
Penulangan lentur
Mx = 45.53 h eff = 27 cm
h eff
Cu =
1.5 x M
2 x ko x bk x b
27
=
1.5 45.53
2.0,5 225 1
= 49.007
dipasang tulangan :
A = D 16 - 12.5 cm A = 16.085 > 15.02360612 Cm
A' = D 12 - 12.5 cm
My = 45.53 h eff = 27 cm
h eff
Cu =
1.5 x M
2 x ko x bk x b
27
=
1.5 45.53
2.0,5 225 1
= 49.007
dipasang tulangan :
A = D 16 - 12.5 cm A = 16.085 > 15.02360612 Cm
A' = D 12 - 12.5 cm
PERHITUNGAN PONDASI TIANG PANCANG DITITIK 63
Nu 51894.18 kg
Beban Tetap Beban Sementara
Mx 122.31 kgm Mx 122.31 kgm
My 49.39 kgm My 49.39 kgm
t = 0.3 m
= 82.4 kg / cm2
= 8.24 Mpa
fp = 1 / 6 x f'c x ( 1 + Nu / 14 Ag )
= 1 / 6 x 20 x ( 1 + 4.94 / 14 )
= 0.745 1.588
= 1.1839 Mpa
= 118.390 ton / m2
118.4 = 51.89418
0.25
( 1 + t ) x 4t
51.89 = 473.560257 473.560257
0.25
t = 0.0997 m
0.25
dipakai t = 0.3 m 30 cm
0.25
Pembebanan :
Berat poer pondasi = 1.0 x 1.0 x 0.3 x 2.4 = 0.720 ton
P kolom aksial = = 51.894 ton
Nu total 52.614 ton
51894.18 Xo = My
Xo = 49.39 = 0.0009517 m
51894.18
My = 51894.18 x 0.002 + 49
= 122.31 + 49
= 171.7 kg m
Pi = V + Mx Yi + My Xi
n EY EX
= 26307.09 + 0 + 343.4
= 26650.49 kg
Nu 51894.18 kg
kolom 14 45 cm
30
44
75 cm
Tp = D
Keliling h
= 51894.18
2 x ( 44+ 65 ) 27
= 8.076 < Tp = 10 kg / cm
< Tpm = 20 kg / cm
Tl = D
7/8 bxh
= 51894.18 8
100 x 27 7
Penulangan lentur
Mx = 171.7 h eff = 27 cm
h eff
Cu =
1.5 x M
2 x ko x bk x b
27
=
1.5 171.7
2.0,5 ### 1
= 25.236
dipasang tulangan :
A = D 16 - 12.5 cm A = 16.085 > 15.0236061 Cm
A' = D 12 - 12.5 cm
My = 171.7 h eff = 27 cm
h eff
Cu =
1.5 x M
2 x ko x bk x b
27
=
1.5 171.7
2.0,5 ### 1
= 25.236