You are on page 1of 1

NOTES

1.

CHIMNEY
2.
SHAFT

NOTE: SERVICE EQUIPMENTS LOCATED ON


TERRACE. REFER TO MEP DWGS FOR
DETAILS
3.
T-06

ELECTRICAL SHAFT
SLAB ABOVE FOR COMMUNICATION 4.
CABLE ROOM

D6 P-06 FD3
D6

P-06 P-06
SS FHC
FHC FD3
SS TOILET P-06 5.
SERVICE LIFT EXHAUST
NOTE: SERVICE EQUIPMENTS LOCATED ON
TERRACE. REFER TO MEP DWGS FOR P-06 E-03 NOTE: SERVICE EQUIPMENTS LOCATED ON
DETAILS PS CWS
PHE FD2 TERRACE. REFER TO MEP DWGS FOR DETAILS
SHAFT LOCATION OF CHILLER REVISIONS
SUPPLY AIR DUCT RETURN AIR DUCT PUMP
P-06 STORE ROOM
(650 x 1150 mm) (800 x 1100 mm)
TOILET DN
TFA
No. Description Date
EXHAUST
E-03
UP

P-13
T-06
PS
E-03

P-04
PS PHE
STAIRCASE 2 SHAFT

P-06

T-06 T-06

GRC SCREEN WALL


SUPPLY AIR DUCT RETURN AIR DUCT FOR HIDING SERVICE EQUIPMENTS
(650 x 1150 mm) (800 x 1100 mm)
DESIGN ARCHITECTS:

TER
AN
PL
www.mayapraxis.com

W
LO
BE First Floor, 188, 3rd Cross Road
TER Panduranga Nagar, Bengaluru 560076
AN
PL (080) 26483693, 26481881, 41713787 TEL

mayaPRAXIS C 2016
All drawings and related
written material appearing
herein constitute original work
of the Architect. No part of
these materials may be
utilized, referenced, disclosed
or reproduced, in any and all
manner or by any and all means,
for design, construction or
related purposes, or any other
purposes, without prior written
consent of the Architect.

CLIENT:

P-06

COMMUNICATION
MAIN CONTRACTOR:
P-06
CABLE
TERMINATION
P-06 E-03
ROOM

PS
20000Ltr. SECTIONAL WATER TANK
FD2
P.O. Box 804
E-01 Manama T. +973 17712303
DN
Kingdom of Bahrain F. +973 17712404
E-03 W. hqconstruction.com M. +973 39831049
PS

PROJECT:
P-04 P-13 PHE SHAFT
FD2 P-06
PROPOSED FOUR STAR HOTEL AT
P-06
PLAN AT WATER TANK TOS JUFFAIR, KINGDOM OF BAHRAIN

EPOXY COAT
SCALE 1:100
STONE
FLOORING PAINT FINISH PROJECT NO. MP/11/334
DATE 11/05/2016
CONCRETE DEALT BY VINAY C.
CARPET INSERT
FINISH

FINISH PLAN
TILE WOODEN LEVEL 14

SLATE STONE RUBBER


REV NO.
FLOORING SHEET NO.
CHIMNEY
SHAFT

T-06

NOTE: SERVICE
TERRACE. REFEREQUIPMENTS
TO MEP DWGS
LOCATED
DETAILS

FOR ON

NOTE: SERVICE EQUIPMENTS LOCATED ON


CABLE ROOM
P-06

ELECTRICAL SHAFT
FHC
FD3
D6

SLAB ABOVE FOR COMMUNICATION


SERVICE
SS LIFT

D6
P-06

P-06

EXHAUST
TOILET
FHC
FD3
SS

P-06
LOCATION OF CHILLER

SUPPLY
(650 x 1150
AIR DUCT
mm) TERRACE. REFER TO MEP DWGS FOR
DETAILS

RETURN
(800 x 1100
AIR mm)
DUCT
P-06

EXHAUST
TOILET
SHAFT
E-03
PHE
FD2
PS
DN
UP

P-06
P-13
PS

PUMP
E-03

STORE ROOM
E-03

CWS
TFA

T-06
NOTE: SERVICE
TERRACE. REFEREQUIPMENTS
TO MEP DWGS
LOCATED
FOR DETAILS
ON
T-06

STAIRCASE 2
P-04

P-06
T-06

SHAFT
PHE
PS

SUPPLY
(650 x 1150
AIR DUCT
mm) RETURN
(800 x 1100
AIR mm)
DUCT GRCHIDING
FOR SCREENSERVICE
WALL EQUIPMENTS
PLANTER

PLANTER BELOW
P-06

E-03
ROOM
TERMINATION
CABLE
COMMUNICATION
FD2
PS

P-06

20000Ltr. SECTIONAL WATER TANK CONCRETE


FLOORING
STONE EPOXYFINISH
PAINT COAT
P-13
P-04
E-01
PS

FD2DN

P-06
E-03

PHE SHAFT
TILE

FINISH CARPET INSERT


WOODEN
P-06

PLAN AT WATER TANK TOS SLATE STONE FLOORING


RUBBER

Level 14

I-3.14 00

You might also like