Professional Documents
Culture Documents
CV-I-Manuel Jesus Perez Casio
CV-I-Manuel Jesus Perez Casio
EMPLOYMENT HISTORY
02/2019-02/2020 Engineering Intern
General Electric Healthcare - Cd. Juarez
The activities that I perform within the company are those that I mention
below:
-Preparation of FAI (First Article Inspection).
-Register the new equipment for the maintenance and calibration system.
-Delete the equipment in obsolete or in conditions not suitable for the
process.
-Validations of the new equipment acquired for the process.
IQ (Instalation Qualification)
EQ (Equipment Qualification)
PQ (Performance
Qualification)
-Relocation of equipment.
IQ (Instalation Qualification)
EQ (Equipment Qualification)
PQ (Performance
Qualification)
-PFMEA elaboration
-Coordination and execution of validation runs with the different departments
involved in it, such as maintenance, production and manufacturing.
-Printing planes and positives in 44 ”Plotter through Ilsutrator.
-Design of new instruments and workstations through SolidWorks.
-Interpretation and modification of mechanical drawings through AutoCAD.
-Implementation of engineering changes designated by the design
department.
-Development of quality tests for the verification of the final product.
-Creation of approving routes through MWS (My Work Shop).
-Creation and modification of lots through DHR (Divice History Record).
-Creation of new numbers of parts in DHR.
-Modification and verification of the DCP’s (Data Collection Plan) in DHR.
-Development of visual aids for the process.
-Development of work instructions for the process.
-Development of deviations and concessions for the process.
-Participation in scrap reduction projects.
-Time taking in the production lines
Skills