You are on page 1of 1

ABSTRACT FOR PROGRESS OF WORKS OF QUALITY CONTROL & INSPECTION SUB DIVISION NO.

3
FOR THE MONTH OF DECEMBER-2019

Total No of works in Total No of certificates Proposed No of inspections made


Total No of works
progress issued for total during the month
SL. payment
Category of the work Remarks
NO during the
Non Non month in AEE/
EPC Non EPC Total EPC Total EPC Total Lakhs DEE EE Total
EPC EPC AE

1 Major Irrigation 2 0 2 1 0 1 1 0 1 2917.0 33 15 4 52

2 Medium Irrigation 1 0 1 0 0 0 0 0 0 0 0 0 0 0
Minor Irrigation
3

RRR 0 3 3 0 0 0 0 0 0 0 0 0 0 0

MTB 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Checkdams 0 4 4 0 0 0 0 1 1 48.64 3 2 1 6

TSIDC 0 5 5 0 2 2 0 0 0 0 8 2 0 10

TOTAL 3 12 15 1 2 3 1 1 2 2965.6 44 19 5 68

EXECUTIVE ENGINEER
DEPUTY EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER
QC & I SUB DIVISION NO.3 QC & I SUB DIVISION NO.3 QC & I DIVISION NO.5
ETURNAGARAM
ETURNAGARAM K.C.COLONY,
HANAMKONDA