You are on page 1of 1

Occidental COMMENT SHEET

of Oman Inc.
Additional Compressors & GDU at Wadi Latham
OXY Project Code 1212153 PAGE
Equipment GDU Package 1 of 1
Job No.: 24000089278

Comments on CRS for MCC IO LIST REV00


VEND
OXY OXY
SR. VENDOR REPLY 1 OR VENDOR
COMMENTS / QUERY OXY RESPONSE 1 RESPONSE RESPONSE
NO (23/04/19) REPLY REPLY 3
2 3
2
1.Vendor to clarify the AUTO
/ MANUAL switch operation
1. Please see the next comment for clarification. Please refer our response below.
from MCC OR PLC.

Vendor explanation is not fully


understood. As per Operating Control
and safe guarding philosophy (OCSP)
document, we understood that auto
start up of standby pump is
In the start-up sequence only motors shall be
considered when working pump trips
started manually therefore no local/remote switch is
2.Vendor to clarify and due to any faults. As commented in
indicated in the MCC, PCS or LCS. In case of the
explain the Motor on/off OCSP document, Vendor to explain
2. Auto-restart (when the equipment is normally
operation from lcs only or the auto start up philosophy of pumps
working) remote start/stop signals from PLC shall
can do plc ? in next revision of OCSP. Interface
be sent to MCC. This signals are now missing and
between MCC, PLC and LCS also to
it will be included in the next revision.
be explained in the OCSP document.
MCC IO list shall also be updated to
reflect the same philosophy. Further
this shall be discussed during design
review.

Page 1 of 1