POWER & WATER UTILITY COMPANY FOR JUBAIL & YANBU

PROJECT CODE: GMD-MFQ-JUB-101


REPLACEMENT OF SEVEN DRUM SCREENS IN SWC-1 & LCP's IN SWP-2, JUBAIL
LOCAL CONTROL PANEL - INSPECTION FORM

DATE :____________________________ TEMPERATURE :____________________________

EQUIPMENT :____________________________ LCP NO. :____________________________

MODEL NO. :____________________________ SERIAL NO. :____________________________

MANUFACTURER :____________________________ INPUT VOLTAGE :____________________________


AUXILIARY:

SWITCH HEATER HEATER INDICATION HEATER FUSE

PANEL LIGHT PANEL LIGHT DOOR SWITCH PANEL LIGHT FUSE

SOCKET SOCKET FUSE

CONTROL:
ISOLATOR ISOLATOR FUSE

MCC:

MCC ISOLATOR POWER FUSE CONTROL FUSE

INSULATOR (POWER)

SELECTOR LCP LOP MCC LCP LOP MCC


MODE COMMENTS
SWITCH OPERATION OPERATION OPERATION INDICATION INDICATION INDICATION
SLOW
LCP FAST
STOP
SLOW
LOP FAST
STOP
SLOW
MCC FAST
STOP

WASH WATER VALVE


LOCAL LOCAL CCR CCR WATER
COMMENTS
OPERATION INDICATION OPERATION INDICATION FLOW
OPEN

CLOSE

CALIBRATION / ALARMS / SET POINTS:


CALIBRATION : REFER ATTACHED CALIBRATION SHEETS
HEAD LOSS INDICATION: LCP CCR

INST-CAL-FORMS.xls\CAL-FORM-LCP PAGE 1 OF 2 07/02/2023


ALARMS:
LOCAL LOCAL CCR MCC COMMENTS
ALARM TRIP
INDICATION BEACON INDICATION INDICATION

SET POINT:
SET POINT SETTING ACTION COMMENTS

ADDITIONAL TESTS:
WASH WASH
WASH PUMP WASH PUMP
TEST SLOW FAST STOP VALVE VALVE COMMENTS
START STOP
OPEN CLOSE

FINISH:
APPEARANCE: LCP (INT.) LCP (EXT.)

D.P. SWITCH ENCLOSURE (INT.) ENCLOSURE (EXT.)

CABLE: CABLE NO. CONNECTION EARTH LCP

TEST RESULTS ACCEPTABLE NOT ACCEPTABLE

TEST PERFORMED BY : _______________________ SIGNATURE: ______________________ DATE: ______________

Q.C. ELECTRICAL ENGR: ______________________ SIGNATURE: ______________________ DATE: ______________

Q.C. MANAGER MARAFIQ / MASA ENGINEER

DATE TIME DATE TIME

INST-CAL-FORMS.xls\CAL-FORM-LCP PAGE 2 OF 2 07/02/2023