You are on page 1of 1

POWER & WATER UTILITY COMPANY FOR JUBAIL & YANBU

PROJECT CODE: GMD-MFQ-JUB-101


REPLACEMENT OF SEVEN DRUM SCREENS IN SWC-1 & LCP's IN SWP-2, JUBAIL
MOTOR OPERATED VALVE
SPECIFICATION
EQUIPMENT INSTRUMENT
TYPE RANGE
TAG NO. SERIAL NO.
MANUFACTURER ACCURACY
INPUT OUTPUT
S. NO. DESCRIPTION PASS FAIL N/A REMARKS
1 Installation Inspection
1.1 Verify and confirm that the physical location of the MOV.
1.2 All conduit connections are firm and intact.
1.3 Verify the continuity of all Fuses and their positions
1.4 Check MOV is correct in accordance with ISS / P&ID
1.5 Tag number correct
1.6 Electrical wiring connections are correct
1.6 Valve is upright and supported prior to carrying out test.
1.6 Ensure that no sand or foreign materials is in the body
2 Handwheel Operation Checks
2.1 Using the Hand wheel, fully close the valve
2.2 Check the Local display shows the valve is fully closed.
2.3 Using a Multi-meter check the "CLOSED" switch contact.
2.4 Using the Hand wheel, fully open the valve
2.5 Check the Local display shows the valve is fully open.
2.6 Using a Multi-meter check the "OPEN" switch contact.
3 Local Operation Checks
3.1 Ensure the motor is powered up and local display is ON
3.2 Verify the Hand-Off-Auto Switch function
3.3 In Local Control Mode, verify the Open / Close function
3.5 Verify th position indication lamps for correct operation
3.6 Opening and closing time will be noted and recorded.
3.7 Check the Limt switch functions during the operation
4 Remote Operation Checks
4.1 In Auto Mode, verify the Open / Close function from
Discrete contacts
4.2 Verify the position indication lamps for correct operation
4.3 Verify the limit switch functions during the operation
4.4 Manufacturer's Test variables if any to be highlited.
4.5 Perform Motor Insuation Resistance test (if applicable)
4.6 Check for any noise or vibration

TEST RESULTS: ACCEPTABLE NOT ACCEPTABLE

TEST PERFORMED BY : ____________________ SIGNATURE: _____________________

Q.C. ELECTRICAL ENGR: ___________________ SIGNATURE: _____________________

Q.C. MANAGER MARAFIQ / MASA ENGINEER

DATE TIME DATE TIME

INST-CAL-FORMS.xls\MOV 07/02/2023

You might also like