ENGINEER’S STICKER: CONTRACTOR’S STICKER:

A Approval Hoe Herbert Heier 08.11.07


‫ﺗﻨﻘﻴﺢ‬ ‫ﺳﺒﺐ اﻹﺻﺪار‬ ‫ﺑﻮاﺳﻄﺔ‬ ‫راﺟﻌﻬﺎ‬ ‫واﻓﻖ ﻋﻠﻴﻬﺎ‬ ‫اﻟﺘﺎرﻳﺦ‬
REV. ISSUED FOR BY CHECKED APPROVED DATE

‫اﻟﻤﻤﻠﻜﺔ اﻟﻌﺮﺑﻴـــﺔ اﻟﺴـــــﻌﻮدﻳــــﺔ‬


KINGDOM OF SAUDI ARABIA
‫اﻟﻤﺆﺳﺴﺔ اﻟـﻌـﺎﻣـــﺔ ﻟﺘﺤﻠﻴــﺔ اﻟﻤﻴـــﺎﻩ اﻟﻤﺎﻟﺤـــــﺔ‬
SALINE WATER CONVERSION CORPORATION (SWCC)

Project No. ‫رﻗﻢ اﻟﻤﺸﺮوع‬ ‫أﻧﻈﻤﺔ ﻧﻘﻞ ﻣﻴــﺎﻩ اﻟﺸـــﻌﻴﺒــﺔ – اﻟﻤﺮﺣﻠـــﺔ اﻟﺜﺎﻟﺜــــﺔ‬
14202-003-B SHOAIBA PHASE-3 WATER TRANSMISSION SYSTEMS
‫اﻻﺳﺘﺸﺎري‬
‫اﻟﻤﻬﻨﺪس‬
ENGINEER
CONSULTING ENGINEERS

‫اﻟﻤﻘﺎول‬
CONSORTIUM
AL RASHID – HAK – SSEM
‫اﻟﻤﻘـــﺎول‬
CONTRACTOR
Pre Commissioning Check Lists for Electrical System
‫ﻣﻘﻴﺎس اﻟﺮﺳﻢ‬
SCALE:
DOCUMENT NO : Sheet Rev :
1 1 Q D 5 1 Q 6 5 2 1 A
SUB-
CONTRACTOR ABB AG
KINGDOM OF SAUDI ARABIA Page: 2 of 24
Saline Water Conversion Corporation
SHOAIBA PHASE 3 WATER TRANSMISSION SYSTEMS
Subject: Pre Commissioning Check Lists for Electrical System

ILF CONSULTING ENGINEERS


First
Rev. A Document Number
Revision
Index

Issue
14-09-
2007 Date: 08-11-07 11-QD51-Q-652

1. Contents .......................................................................................................................2

Commissioning Check Lists

1KGC 007 381 MV-Switchgear........................................................................3


1KGC 007 382 LV-Switchgear Breaker ..........................................................4
1KGC 007 383 LV-Switchgear Module ...........................................................5
1KGC 007 384 Differential Protection ............................................................6
1KGC 007 385 Over Current Protection.........................................................7
1KGC 007 386 Value Sheet Differential Protection.......................................8
1KGC 007 387 LV-Switchgear ........................................................................9
1KGC 007 388 Motorized Valve ....................................................................10
1KGC 007 391 Transformers ...................................................................11-12
1KGC 007 392 DC-Switchgear ......................................................................13
1KGC 007 393 DC-Cables .............................................................................14
1KGC 007 394 UPS / Inverter ........................................................................15
1KGC 007 395 Battery Charger ....................................................................16
1KGC 007 396 Battery ...................................................................................17
1KGC 007 397 Value Sheet Battery.........................................................18-22
1KGC 007 398 MV-Breaker ...........................................................................23
1KGC 007 399 Motors ...................................................................................24

Engineering Subcontractor Contractor CONSORTIUM Subcontractor


AL RASHID – HAK – SSEM ABB
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………………………….


Type: ………………………………….
Test Functions : Visual inspection
Grounding connections
Local-/Remote indication
Alarm annunciation
Interlock test
Heaters and internal light
Relays and circuit breakers
Meggertest before HV-Test: 5000V…………1min
Meggertest: L1 - ground
Meggertest: L2 - ground
Meggertest: L3 - ground
HV-Test: …………….kV……….….min
HV test: L1 - ground
HV test: L2 - ground
HV test: L3 - ground
Meggertest after HV-Test: 5000V…………1min
Meggertest: L1 - ground
Meggertest: L2 - ground
Meggertest: L3 - ground

Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….
Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record MV Switchgear
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
3
ABB AG 1KGC 007 381 En No. of p.
24
FILE: 381_Test Record_MV Switchgear.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:00:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA


Data : Manufacturer: ………………………………….
Location at switchgear ………………………………….
Type: ………………………………….
Serial No.: ………………………………….
Nominal current CB Ith: ………………………………….
Nominal current CT`s: ………………………………….
Test Functions : Manual operation
Electrical operation
Local-/Remote indication
Interlock test
Alarm annunciation
Protection Settings Adjusted current I>
Adjusted tripping delay
Adjusted current I>>
Adjusted tripping delay
Operating point secondary: Test I>:
Test tripping delay
Test I>>:
Test tripping delay

Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….
Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record LV Breaker / Isolator
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
4
ABB AG 1KGC 007 382 En No. of p.
24
FILE: 382_Test Record_LV SWG Breaker.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:00:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………………………….


Location at switchgear: .……………………….
Type: ………………………………….
Serial No: ………………………………….
Voltage: ………………………………….
Current: ………………………………….
Power: ………………………………….
Fuse rating: ………………………………….
Setting over-load relay: .……………………….
Rotation check ………………………………….
Current consumption .……………………….
Test Functions : Check of terminals
Check of grounding
Meggertest: 1000V…………1min
Meggertest: L1 - L2
Meggertest: L1 - L3
Meggertest: L2 - L3
Meggertest: L1 - ground
Meggertest: L2 - ground
Meggertest: L3 - ground

Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title LV SWG Test Record Modulating Control
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
5
ABB AG 1KGC 007 383 En No. of p.
24
FILE: 383_Test Record_LV SWG Modul control.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:00:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA


Data: Manufacturer: ………………………………….
Type: ………………………………….
Serial No.: ………………………………….
Transformer ratio HV-side: .……………………….
Transformer ratio LV-side .……………………….
Rated current: ………………………………….
Aux. Supply: ………………………………….
Physical inspection: Mounting & wiring
Mech. conditions
Mech. conditions
LED`s display
Secondary injection test: Settings
CT
P%
S%
I1 / IN
I2 / IN
SG1
Stability check
Alarm & trip contact check
Remarks:

............................................................................................................………………………………………….
Acceptance of Test
SWCC / iLF: ABB:

Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record Differential Protection
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
6
ABB AG 1KGC 007 384 En No. of p.
24
FILE: 384_Test Record_Diff Protection.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:00:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA


Data: Type: ………………………………….
Serial No: ………………………………….
Nominal current CT`s: ………………………………….
Rated current: .……………………….
Setting: .……………………….
Setting range: ………………………………….
Tripping delay -instantaneous tripping: ………………………………….
-delayed tripping: ………………………………….
Operation Setting: Instantaneous tripping: ………………………………….
Delayed tripping: ………………………………….
Test Functions:
Value instantaneous tripping Phase L1
Tripping delay
Phase L2
Tripping delay
Phase L3
Tripping delay

Value delayed tripping Phase L1


Tripping delay
Phase L2
Tripping delay
Phase L3
Tripping delay

Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….
Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record Test Over Current Protection
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
7
ABB AG 1KGC 007 385 En No. of p.
24
FILE: 385_Test Record_Over-Current Protection.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:01:00 AM
©Copyright 2004 ABB. All rights reserved.

Value Sheet:
System : Protection
Item no. : Date of test :

Documents used in the test


Diagrams No.:
Data sheets No.:
Test Specifications:
Test Equipment No.:

Test Result:
Secondary Primary Trip time
Phase Injection side Set value
value (A) value (A) (mSec)
1L1
2L1
1L2
2L2
1L3
2L3

List of findings
Finding Responsible Cleared Date Cleared
No. Description Planed Real Sign

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission


Prep. PAO9 / W.Schaeufele 12.09.2007 14202- Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Cover Sheet Doc.
des.
Ref.
des.
Title Value Sheet Diff. Protection
Resp. PAO9
dept
Doc. no. Lang. Rev. ind. Page
8
ABB AG 1KGC 007 386 En No. of p.
24
FILE: 386_Value Sheet Diff Protection.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:01:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………………………….


Type: ………………………………….
Test Functions : Visual inspection
Grounding connections
Local-/Remote indication
Alarm annunciation
Interlock test
Heaters and internal light
Release ON/OFF
Relays and circuit breakers
Meggertest: 2.5 kV…………1min
Meggertest: L1 - L2
Meggertest: L1 - L3
Meggertest: L2 - L3
Meggertest: L1 - ground
Meggertest: L2 - ground
Meggertest: L3 - ground

Acceptance of Test
: SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….
Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record LV Switchgear
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
9
ABB AG 1KGC 007 387 En No. of p.
24
FILE: 387_Test Record_LV Switchgear.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:01:00 AM
©Copyright 2003 ABB. All rights reserved.

Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Test Functions : Indication of tag / text at operator station


Indication of condition at operator station
Operation / acknowledgement
Color / change of color
Alarms / discrepancy annunciation
Indication of position at operator station
Indication OFF/CLOSE at operator station
Indication TORQUE at operator station

Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Motorized Valve
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
10
ABB AG 1KGC 007 388 En No. of p.
24
FILE: 388_Test Record_Motorized Valve.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:01:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………………………….


Type: ………………………………….
Serial No.: ………………………………….
Rated power: ………………………………….
Cooling: .……………………….
Phases: .……………………….
Frequency: ………………………………….
Voltage Ratio: ………………………………….
Vector Group: ………………………………….
Current Transformer Manufacturer: ………………………………….
Location: ………………………………….
Ratio: ………………………………….
General Checks: Any sign of external damage
Paint condition of transformer
All external accessories located as per arrangement drawing
Grounding connections
All primary and secondary connections are tight
Tests:
Meggertest 5000V…………1min
HV - LV:
LV - ground
HV - ground
MV-LV and ground
Buchholz Relay
Alarm
Trip

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Transformers
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
11
ABB AG 1KGC 007 391 En No. of p.
24
FILE: 391_Test Record_Transformer.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:13:00 AM
Temperature Protection
Setpoint oil alarm
Setpoint oil trip
Setpoint winding alarm
Setpoint winding trip

Oil Insulation Resistance Check Distance 2.5mm Temperature Protection


Voltage

Tap Changer Ratio


No. of taps

Operation Manual
Electrical
Automatic
Setting voltage regulator

Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

Remarks:

Doc. kind Test Record Project Shoaiba Phase 3 Water Transmission Systems
Title Transformers Customer Saline Water Conversation Corporation SWCC
Proj. no. 14202-003-B
Doc. no. Lang. Rev. ind. Page
12
ABB AG 1KGC 007 391 En No. of p.
24
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………………………….


Type: ………………………………….
Test Functions : Visual inspection
Grounding connections
Local-/Remote indication
Alarm annunciation
Interlock test
Heaters and internal light
Release ON/OFF
Relays and circuit breakers
Meggertest: 2.5 kV…………1min
Meggertest: L+ - L-
Meggertest: L+ - ground
Meggertest: L- - ground

............................................................................................................………………………………………….
Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record DC Switchgear
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
13
ABB AG 1KGC 007 392 En No. of p.
24
FILE: 392_Test Record_DC Switchgear.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:02:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Cable from: ………………………………….


Cable from: ………………………………….
Type of Cable: ………………………………….
Size of Cable: ………………………………….
Length of Cable:………………………………….
Test Functions : Destination check
Connection check
Meggertest: 1000V…………1min
Meggertest: L+1 – L-
Megger test: L+ - ground
Meggertest: L- - ground

Acceptance of Test
: SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….
Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record DC Cables
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
14
ABB AG 1KGC 007 393 En No. of p.
24
FILE: 393_Test Record_DC Cable.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:02:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………….………….


Type: ………………….………….
Output Voltage /frequency: ………………….………….
Test Functions : Visual inspection
Grounding connections
Sidnals to control system
Alarm annunciation
Single operation
Synchronize to mains
DC circuit: Over voltage set poin
Under voltage set point
Alarm
AC circuit: Over voltage set poin
Under voltage set point
Alarm

...........................................................................................................………………………………………….
Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record Inverter UPS
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
15
ABB AG 1KGC 007 394 En No. of p.
24
FILE: 394_Test Record_UPS & Inverter.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:03:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………….………….


Type: ………………….………….
Test Functions : Visual inspection
Grounding connections
Local-/Remote indication
Alarm annunciation
Automatic operation
Manual Operation

...........................................................................................................………………………………………….

Acceptance of Test
SWCC / iLF ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Battery Charger
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
16
ABB AG 1KGC 007 395 En No. of p.
24
FILE: 395_Test Record_Battery Charger.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:03:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………….………….


Type of battery: ………………….………….
Capacity 10h rate ………………….………….
Number of cells: ………………….………….
Nominal voltage per cell: ………………….………….
Final voltage rate per cell: ………………….………….
Equalise voltage per cell: ………………….………….
Floating voltage per cell: ………………….………….
Specific gravity at 20°C: ………………….………….
Test Functions : Charging procedure see value sheet
Discharging procedure see value sheet

...........................................................................................................………………………………………….
Acceptance of Test
SWCC / iLF ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record Battery
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
17
ABB AG 1KGC 007 396 En No. of p.
24
FILE: 396_Test Record_Battery.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:03:00 AM
©Copyright 2004 ABB. All rights reserved.

Value Sheet:
System : Battery
Item no. Date of test :

Documents used in the test


Diagrams No.:
Data sheets No.:
Test Specifications:
Test Equipment No.:

Ref. DESCRIPTION Unit Nominal Measured


Value Value

3.1 Charging Procedure:


3.1.1 After filling the cells a reaction time of 2 hours must be maintained
3.1.2 Start commissioning charge with decreasing current
3.1.3 Recording: time, current, voltage and electrolyte temperature until all
cells have reached minimum 2.6V and the density risen to nominal
value of 1.22kg/l without any further increase
3.1.4 The temperature must not exceed 55°C
3.1.5 Switch to trickle charging voltage 2.23V/cell

TIME CURRENT VOLTAGE CHARGE ELEC.TEMP. ROOM-


MAX TEMP.
o o
A V Ah C C

External doc. no.

Based on ProjectVasilikos Shoaiba Phase 3 Water Transmission


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Cover Sheet Doc.
des.
Ref.
des.
Title Value Sheet Battery
Resp. PAO9
dept
Doc. no. Lang. Rev. ind. Page
18
ABB AG 1KGC 007 397 En No. of p.
24
FILE: 397_Value Sheet Battery.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:04:00 AM
Ref. DESCRIPTION Unit Nominal Measured
Value Value

3.2 Discharging Procedure:


3.2.1 Prepare discharging load
3.2.2 Recording: cell-voltage and density before discharging
3.2.3 Start discharging
3.2.4 Recording: time, current, voltage and electrolyte temperature
3.2.5 At the end of the discharging record, check the cell-voltage and
density again

TIME CURRENT VOLTAGE DISCHARG ELEC.TEMP. ROOM-


E MAX TEMP.
o o
A V Ah C C

Charging and discharging procedure

220 / 24 V DC

Cell Density Voltage Density Voltage Cell Density Voltage Density Voltage
No. after after after after No. after after after after
1. 1. dis- dis- 1. 1. dis- dis-
charg. charg. charg. charg. charg. charg. charg. charg.
1 18

2 19

3 20

4 21

5 22

6 23

7 24

Doc. kind Cover Sheet Project Shoaiba Phase 3 Water Transmission Systems
Title Value Sheet Battery Customer Saline Water Conversation Corporation SWCC
Proj. no. 14202-003-B
Doc. no. Lang. Rev. ind. Page
22
ABB AG 1KGC 007 397 En No. of p.
24
8 25

9 26

10 27

11 28

12 29

13 30

14 31

15 32

16 33

17 34

Cell Density Voltage Density Voltage Cell Density Voltage Density Voltage
No. after after after after No. after after after after
1. 1. dis- dis- 1. 1. dis- dis-
charg. charg. charg. charg. charg. charg. charg. charg.
35 52

36 53

37 54

38 55

39 56

40 57

41 58

42 59

43 60

44 61

45 62

46 63

Doc. kind Cover Sheet Project Shoaiba Phase 3 Water Transmission Systems
Title Value Sheet Battery Customer Saline Water Conversation Corporation SWCC
Proj. no. 14202-003-B
Doc. no. Lang. Rev. ind. Page
22
ABB AG 1KGC 007 397 En No. of p.
24
47 64

48 65

49 66

50 67

51 68

Cell Density Voltage Density Voltage Cell Density Voltage Density Voltage
No. after after after after No. after after after after
1. 1. dis- dis- 1. 1. dis- dis-
charg. charg. charg. charg. charg. charg. charg. charg.
69 86

70 87

71 88

72 89

73 90

74 91

75 92

76 93

77 94

78 95

79 96

80 97

81 98

82 99

83 100

84 101

85 102

Doc. kind Cover Sheet Project Shoaiba Phase 3 Water Transmission Systems
Title Value Sheet Battery Customer Saline Water Conversation Corporation SWCC
Proj. no. 14202-003-B
Doc. no. Lang. Rev. ind. Page
22
ABB AG 1KGC 007 397 En No. of p.
24
Cell Density Voltage Density Voltage Cell Density Voltage Density Voltage
No. after after after after No. after after after after
1. 1. dis- dis- 1. 1. dis- dis-
charg. charg. charg. charg. charg. charg. charg. charg.
103

104

105

106

107

108

List of findings
Finding Responsible Cleared Date Cleared
No. Description Planed Real Sign

REVISION

Rev. ind. Page (P) Description Date


Chapt. (C) Dept./Init.

Doc. kind Cover Sheet Project Shoaiba Phase 3 Water Transmission Systems
Title Value Sheet Battery Customer Saline Water Conversation Corporation SWCC
Proj. no. 14202-003-B
Doc. no. Lang. Rev. ind. Page
22
ABB AG 1KGC 007 397 En No. of p.
24
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………………………….


Location at switchgear: ………………………………….
Type: ………………………………….
Serial No.: ………………………………….
Nominal current CB Ith: ………………………………….
Nominal current CT`s: ………………………………….
Test Functions : Manual operation
Electrical operation
Local-/Remote indication
Interlock test
Alarm annunciation
SF6 Level
Protection Settings Adjusted current I>
Adjusted tripping delay
Adjusted current I>>
Adjusted tripping delay
Operating point secondary: Test I>:
Test tripping delay
Test I>>:
Test tripping delay

Acceptance of Test
SWCC / iLF: ABB:

Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Test Record MV Breaker / Isolator
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
23
ABB AG 1KGC 007 398 En No. of p.
24
FILE: 398_Test Record_MV Breaker.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 9:04:00 AM
©Copyright 2004 ABB. All rights reserved.
Designation: Text: Area:

Reference documents:

OK: checked and ok NA: not applicable Blank: not checked OK NA

Data : Manufacturer: ………………………………….


Type: ………………………………….
Test Functions : Visual inspection
Grounding connections
Local-/Remote indication
Alarm annunciation
Interlock test
Heaters
Voltage
Rotation
DC Resistence Measurements >15kW

Acceptance of Test
SWCC / iLF: ABB:
Date Name/ Signature Date Name/ Signature

............................................................................................................………………………………………….
Remarks:

External doc. no.

Based on Project Shoaiba Phase 3 Water Transmission Systems


Prep. PAO9 / W.Schaeufele 12.09.2007 Customer Saline Water Conversation Corporation SWCC
Appr. PAO9 / Thomas Herbert 13.09.2007 Proj. no. 14202-003-B
Doc. kind Test Record Doc.
des.
Ref.
des.
Title Motor
Resp. dept PAO9
Doc. no. Lang. Rev. ind. Page
24
ABB AG 1KGC 007 399 En No. of p.
24
FILE: 399_Test Record_Motors.doc; TEMPLATE: Techn_Doc_Deliv_P.dot C; SKELETON: ; SAVEDATE: 11/12/2007 8:59:00 AM