You are on page 1of 5

CONSTANCIA PROJECT

Contract: 0504 - SP02


Design, Supply and
Construct of MV Reticulation and Substations

PAGE
PROTOCOL FOR SITE ACCEPTANCE TEST SAT Code Siemens: (4) G69173-D1001-Y756 1/5
MOTOR CONTROL CENTER TIASTAR REV.
2

Consecutive Date

Client Order Object Nbr. Order

Module Sub Module Manufacturer

Reference Nbr. Serial

Responsible Technical Client Responsible for ordering

Drawing Location WBS

 Mechanical and Structural Inspection (according to the document Factory SIEMENS uses
"instruction guide of the motor control center Tiastar - A5E31147113TO-001")

YES NO NA YES NO NA
Equipment according to specifications Marking of cables

Labelling of equipment Signs and signals


Marking cubicle -TAG Identification of power cables and bars

Finisher, according to specifications Complete equipment

Installation and mounting according to Inspection of coupling, alignment and


drawings torque of the unions.

 Test of Contact Resistance (According to the document Factory SIEMENS uses "instruction guide of
the motor control center Tiastar - A5E31147113A-001" - Section 3.1).

Phase R µ
Phase S µ

Phase T µ

SIEMENS CONSTRUCTION SIEMENS QA/QC AUSENCO


SUPERVISOR SUPERVISOR SUPERVISOR

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


CONSTANCIA PROJECT
Contract: 0504 - SP02
Design, Supply and
Construct of MV Reticulation and Substations

PAGE
PROTOCOL FOR SITE ACCEPTANCE TEST SAT Code Siemens: (4) G69173-D1001-Y756 2/5
MOTOR CONTROL CENTER TIASTAR REV.
2

Consecutive Date

 Test of Contact Resistance in the Breaker (According to the document Factory SIEMENS uses
"instruction guide of the motor control center Tiastar ).

Breaker Contact Resistance


Breaker Position Terminals Measured Resistance
Closed L1 - L1 Ω
Closed L2 - L2 Ω
Closed L3 - L3 Ω

 Measurement system functionality (Sentron PAC)


Pass
ITE
M Action/Test Comment Expected result Approved Observed N/A
1 Ia
2 Ib
3 Ic
4 In
5 Va-b
6 Vb-c
7 Vc-a
8 VN
9 P
10 Q
11 S
12 Freq
13 PF
14 Kw-h
15 Kvar-H

 Insulation Tests (according to the document Factory SIEMENS uses "instruction guide of the motor
control center Tiastar - A5E31147113A-001" - Section 3.20 )
Instrument

Manufacturer_____________ Type_____________ Capacity______________

Model ________________ Calibration________ s/n __________________

SIEMENS CONSTRUCTION SIEMENS QA/QC AUSENCO


SUPERVISOR SUPERVISOR SUPERVISOR

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


CONSTANCIA PROJECT
Contract: 0504 - SP02
Design, Supply and
Construct of MV Reticulation and Substations

PAGE
PROTOCOL FOR SITE ACCEPTANCE TEST SAT Code Siemens: (4) G69173-D1001-Y756 3/5
MOTOR CONTROL CENTER TIASTAR REV.
2

Consecutive Date

Electrical Circuit with VDC, ºC NA

R-S: M S-T: M R-T: M ------ ------ ------


R-N: M S-N: M T-N: M ------ ------ ------
R-M: M S-M: M T-M: M N-M : M

 Insulation Tests in the Breaker (according to the document Factory SIEMENS uses "instruction guide
of the motor control center Tiastar).

Insulation Resistance Test


Breaker
Test Beetwen: Resistance Breaker Position Test Beetwen: Resistance
Position
L1 - L2 Ω
L1 - L1 Ω
L2 - L3 Ω
L1 - L3 Ω
Closed Open L2 - L2 Ω
L1 - GND Ω
L2 - GND Ω
L3 - L3 Ω
L3 - GND Ω

Control and auxiliary circuits, with Vdc, ºC NA

R-M: ------ M S-M: ------ M T-M: ------ M N-M : ------ M

 Test operation of breaker (Test shooting with SIEMENS Simulator), (if apply).

TAG Location Typical

YES NO NA

Unit test shot ETU ( L, S, I)

 Configuration settings:

SIEMENS CONSTRUCTION SIEMENS QA/QC AUSENCO


SUPERVISOR SUPERVISOR SUPERVISOR

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


CONSTANCIA PROJECT
Contract: 0504 - SP02
Design, Supply and
Construct of MV Reticulation and Substations

PAGE
PROTOCOL FOR SITE ACCEPTANCE TEST SAT Code Siemens: (4) G69173-D1001-Y756 4/5
MOTOR CONTROL CENTER TIASTAR REV.
2

Consecutive Date

MCC Data Values Others parameters Values


Rated voltage V
Rated current A
Rated power kW
Rated power factor cos ϕ
Rated efficiency η %
Rated frequency hz
Rated speed rpm

 Observations:

TAG Location Typical

SIEMENS CONSTRUCTION SIEMENS QA/QC AUSENCO


SUPERVISOR SUPERVISOR SUPERVISOR

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


CONSTANCIA PROJECT
Contract: 0504 - SP02
Design, Supply and
Construct of MV Reticulation and Substations

PAGE
PROTOCOL FOR SITE ACCEPTANCE TEST SAT Code Siemens: (4) G69173-D1001-Y756 5/5
MOTOR CONTROL CENTER TIASTAR REV.
2

Consecutive Date

 Test of electrical operation. (According to the document Factory SIEMENS uses "instruction guide
of the motor control center Tiastar - A5E31147113A-001" - Section 4).
YES NO NA YES NO NA
Power circuit 440Vac Transformer
Control and auxiliar circuit 24Vdc Switches - Selectors
Breakers Fuses

Contactors Control Panel

Variador Others

 General Operation tests (according to the document Factory SIEMENS uses "instruction guide of
the motor control center Tiastar - A5E31147113A-001" - Section 4).
YES NO NA YES NO NA
Command and control Ventilation system and heating
Measurement system Outlet system
Protection system Final drawings
Lighting system Operation manuals

 Test of Profibus communication.


YES NO NA

Profibus - DP

 Configuration data

Result of the Protocol


APPROVED REJECTED

SIEMENS CONSTRUCTION SIEMENS QA/QC AUSENCO


SUPERVISOR SUPERVISOR SUPERVISOR

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date: