D R A
IN6-AUG 19
0
- 2 0
INTED
EN PR
ONTR
OLLED WH 1/8
NC
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
Load Test Procedure for Lifting Contractor’s Doc. No. S-3000-12Z0-001
Devices
Sheet 2 OF 5
INDEX
1 PURPOSE ...................................................................................................................................................... 3
2 REFERENCE ................................................................................................................................................. 3
3 ABBREVIATION, TERMS AND DEFINATIOS.............................................................................................. 3
4 LOAD TEST ................................................................................................................................................... 3
4.1 General ................................................................................................................................................... 3
4.2 Test and Inspection ................................................................................................................................ 3
4.2.1 Visual Inspection .................................................................................................................................... 3
4.2.2 Function Test .......................................................................................................................................... 3
4.2.3 Dynamic Load Test……………………………………………………………………………………………..3
4.2.4 Static Load Test…………………………………………………………………………………………………4
4.2.5 Deflection Check………………………………………………………………………………………………..4
4.2.6 Third Party Certificate…………………………………………………………………………………………..4
5 PAINT ............................................................................................................................................................. 4
ATTACHMENT
D R A
IN6-AUG 19
0
- 2 0
INTED
EN PR
ONTR
OLLED WH 2/8
NC
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
Load Test Procedure for Lifting Contractor’s Doc. No. S-3000-12Z0-001
Devices
Sheet 3 OF 5
1 PURPOSE
This procedure defines the requirement of the load test of lifting devices of overhead crane, A Frame,
Jib Crane (Davit with crab), Trolley Hoist and Trolley Beam.
Detail Method of statement shall be prepared by subcontractor.
2 REFERENCE
V-2155-581-A-853 Onsite test procedure for overhead crane
V-2155-581-A1-853 Onsite test procedure for Electrical Hoist
V-2155-589-A-880 Performance OR load test procedure (A-Frame, Davit with Hoist)
S-3000-1675-504 Inspection and Test Plan for overhead crane and Hoist
X-XXX-XXXX-XXX Inspection and Test Plan for Trolley Beam (To be issued)
Owner : SONATRACH
Contractor : JGC Corporation and JGC Algeria SPA consortium
ENACT : SONATRACH approved Third Party Company
Subcontractor : Company to whom Contractor has subcontracted any part of the work
4 LOAD TEST
4.1 General
Load test shall be performed as per instruction depicted in vendor document.
Detail test and inspection procedure shall follow vendor Procedure as mentioned below.
V-2155-581-A-853 Overhead Crane
V-2155-581-A1-853 Electrical Hoist
V-2155-589-A-880 A-Frame, Davit with Hoist
D R A
IN6-AUG 19
0
- 2 0
INTED
EN PR
ONTR
OLLED WH 3/8
NC
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
Load Test Procedure for Lifting Contractor’s Doc. No. S-3000-12Z0-001
Devices
Sheet 4 OF 5
D R A
IN6-AUG 19
0
- 2 0
INTED
EN PR
ONTR
OLLED WH 4/8
NC
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
Load Test Procedure for Lifting Contractor’s Doc. No. S-3000-12Z0-001
Devices
Sheet 5 OF 5
5 PAINT
Monorail shall be uniquely tagged and marked with SWL in clearly visible location in accordance with the
approved TM-HRM3-SHY/JYC-0498 after load test.
ATTACHMENT
Attachment-1: Load Test Plan for lifting Equipment
Attachment-2: Test Load location in Compressor area
D R A
IN6-AUG 19
0
- 2 0
INTED
EN PR
ONTR
OLLED WH 5/8
NC
S-3000-12Z01-001_Rev. A
Attachment-1
Page 6 of 8
Static Load
Dynamic Load Test
Test at 1.25
at 1.1 x SWL Check
x SWL
Mechanism,
structural
Check crane Check lifting
Check Visual Check all Check load up and components
Check limit / crab Check Check hoist
No. Lifting Equipment Location Manufacturer SWL (Ton) trolley inspection smooth lifting / /Trolley
switches / travelling / lowering repeated without
smooth for all vital motions for lowering without fail Check each beam
brakes traversing starting and without damage
running components crane / hoist speed (at 100 mm crane / hoist
speed stopping for damage /
to 200 mm motion
each motion connection
from ground without fail
during 1 loosened
level with 10
hour
min. holding
time)
Maintenance Building 7
1 Overhead Crane Ital krane NA X X X X X X X X X X
GTC Shelter 50
A-frame (Type-1)
Pipe Rack Excel Lift 1.2 NA X X NA NA NA X X NA X X
A-frame (Type-2)
2 A-frame (Type-3)
Pipe Rack Excel Lift 0.5
Pig Receiver Piping Technogies 0.5
Jib Crane GTC Inlet Filter Fas 0.5
3 NA NA X NA NA NA X X NA NA NA
(Davit with Crab) PWT Xylem US 0.6
Thern Winches &
PWT 0.9
Cranes
Pipe Rack Excel Lift 1.2
4 Trolley Hoist Common Excel Lift 1.2 NA NA X NA NA NA X X NA NA X
0.5
1.2
2
5 Trolley Beam Various Contractor X NA NA NA NA NA X X NA X NA
2.2
4
5
Note: For trolley beam Dynamic load test is equal to 100% of SWL
D R A
N
I 06-AU 19
G - 2 0
ED
PRINT
LED WHEN 6/8
TROL
NCON
Attachment-2 (1/2) S-3000-12Z01-001_Rev.A Page 7 of 8
D R A
N
I 06-AUG 19
- 2 0
D
RINTE
HEN P
T ROLL
ED W 7/8
NCON
Attachment-2 (2/2) S-3000-12Z01-001_Rev.A Page 8 of 8
D R A
N
I 06-AUG 19
- 2 0
D
RINTE
HEN P
T ROLL
ED W 8/8
NCON