PRE-COMMISSIONING TEST REPORT FOR

FUNCTIONAL& SIMULATION CHECK


Date:

Client
Project
Feeder Detail

SL.NO. CHECK DESCRIPTION REMARK


1 OPERATION CHECK
BREAKER CLOSE IN TEST POSITION
BREAKER TRIP IN TEST POSITION
BREAKER CLOSE IN SERVICE POSITION
BREAKER TRIP IN SERVICE POSITION
BREAKER TRIP THROUGH MATSER RELAY
SPRING CHARGE THROUGH MOTOR
OPEN OPERATION FROM RELAY
TRIP OPERATION FROM RELAY
2 INDICATION CIRCUIT
SPRING CHARGE
BREAKER ON
BREAKER OFF
TRIP CKT-1 HEALTHY
TRIP CKT-2 HEALTHY
AUTO TRIP
BREAKER IN SERVICE
BREAKER IN TEST
BREAKER SEMAPHORE CLOSE STATUS
BREAKER SEMAPHORE OPEN STATUS
PANEL SPACE HEATER SUPPLY ON
LAMP TEST
3 ANNUNCIATION CIRCUIT
DC SUPPLIES TRIPPED
AC SUPPLIES TRIPPED
OVERCURRENT TRIP
EARTH FAULT TRIP
50BF OPERATED
NUMERICAL RELAY WATCHDOG OPERATED

TCS-1 UNHEALTHY
TCS-2 UNHEALTHY

TESTED BY: WITNESS BY: WITNESS BY


( ) ( )
NAME
:
SIGN:

Page 1 of 2
PRE-COMMISSIONING TEST REPORT FOR
FUNCTIONAL& SIMULATION CHECK
Date:

4 METERING CIRCUIT
AMMETER
VOLTMETER
NUMREICAL RELAY

4 AC & DC CIRCUIT
LAMP
SPACE HEATER
SOCKET SUPPLY
DC SUPPLY

Remarks: The Functional and simulation checked and found as per the As Built Drawing.

TESTED BY: WITNESS BY: WITNESS BY


( ) ( )
NAME
:
SIGN:

Page 2 of 2