You are on page 1of 1

TABLE OF CONTENT

CONTENT PAGE

ACKNOWLEDGEMENT 1
ABSTRACT 2

1.0 INTRODUCTION
1.1 Introduction of route survey 3-4
2.0 THEORY
2.1 Definition of Setting Out 5-8
2.2 Detail and Topographic Survey 8
2.3 Reconnaissance and Planning
9
2.4 Station Marking
10
2.5 Horizontal Control
2.6 Vertical Control 10-11

2.7 Datum 12
2.8 Horizontal Curve 12
2.9 Vertical Curve
12-13

13-16

3.0 GROUP MEMBERS AND EQUIPMENT USED


3.1 Personal 17
3.2 Equipment
18-20
4.0 PROCEDURE OF WORK
4.1 Flow Chart of Procedure Work 21
4.2 Reconnaissance survey and planning 22
4.3 Data Calculation
22
4.4 Construction survey (Traversing and Setting out)
22-23
4.5 Pegging and checking (Detailing)
23

5.0 RESULT AND ANALYSIS


5.1 Road Design Calculation 24-25

6.0 CONCLUSION
6.1 Conclusion 26
6.2 Individual Comment 26-29
REFERENCE 30

You might also like