Rbi 150531182513 Lva1 App6892 PDF
Rbi 150531182513 Lva1 App6892 PDF
RBI
RISK BASED INSPECTION
Presented by:
Mohammad Javad Ranjbar
5 May 2014
Outline
Introduction to RBI
•what is RBI
•what are the key elements of RBI
•how to implement an RBI program
•how to sustain an RBI program
RBI Softwares
• TWI - RISKWISE
• ReliaSoft – RBI
1
5/30/2015
What is RBI?
Risk-based Inspection (RBI) is a methodology for
identification of high-risk equipment by review of
active/potential damage mechanisms and the suitability of
mitigation methods
RBI allows inspection/maintenance RBI systematical
evaluated both the probability of failure and the
associated consequence of failure.
Risk is the combination of the probability of some event
occurring during a time period of interest and the
consequences,(generally negative) associated with the
event. In mathematical terms, risk can be calculated by
the equation:
Risk = Probability × Consequence
2
5/30/2015
Objectives of RBI
Increase Availability
1 (reducing unplanned outages )
CATASROPHIC
FAILURE OF Improve Safety
STEAMLINE 2 )Ensure Safe Operation)
(JAPAN 2004)
Optimise Inspection
3 Costs
3
5/30/2015
Outcome of an RBI?
• Types of • Appropriate
damage Inspection
expected Technique
What? How?
When? Where?
• Inspection • Hotspot
Frequency locations
4
5/30/2015
International Standards
5
5/30/2015
1. Data Collection
design and construction records/drawings:
— P&IDs, process flow diagrams, material selection diagrams (MSDs), etc.,
— piping isometric drawings,
— engineering specification sheets,
— materials of construction records,
— construction QA/QC records,
— codes and standards used,
— protective instrument systems,
— leak detection and monitoring systems,
— isolation systems,
— inventory records
— emergency depressurizing and relief systems,
— safety systems,
— fire-proofing and fire-fighting systems,
— layout;
6
5/30/2015
1. Data Collection
inspection records
— schedules and frequency,
— amount and types of inspection,
— repairs and alterations
— inspection results
process data
— fluid composition analysis including contaminants or trace
components,
— distributed control system data,
— operating procedures,
— start-up and shutdown procedures,
— emergency procedures,
— operating logs and process records,
1. Data Collection
Off-site data and information
— if consequence may affect off-site areas;
Failure data
— generic failure frequency data
— industry specific failure data,
— plant and equipment specific failure data,
— reliability and condition monitoring records,
— leak data;
Site conditions
— climate/weather records,
— seismic activity records;
Equipment replacement costs
— project cost reports,
— industry databases;
7
5/30/2015
2. Probability of Failure
Probability Information
1. Number of units and type of plant: 6. Material of construction: steel,
pressure vessel, tank, column, stainless steel, cast steel, aluminium
pipework, heat exchanger etc. etc, any coatings
2. Plant function: distillation unit, cat 7. Damage mechanisms: what damage
cracker, storage etc mechanisms are known to occur or
3. Plant processes: gas, hydrocarbon, have the potential to occur in the
steam etc, number of planned and plant. eg stress corrosion, brittle
unplanned interruptions per year failure, temper embrittlement, fatigue,
4. Process stability: rate stability from localised or general corrosion, creep,
a) very stable no known upset others,
conditions known to exist to b) loss of 8. Inspection: dates, type (visual,
control is inherent in process thickness, MPI, UT etc) and extent of
5. Plant maintenance history: repairs, inspection, inspectability, inspection
modifications, quality of maintenance, results, corrosion allowance.
painting & insulation maintenance Effectiveness and management of the
inspection programme.
8
5/30/2015
2. Consequence of Failure
Consequence Information
1. Fire: are external fire fighting 3. Chemical data: relates to the
resources required for the most chemical’s tendency to ignite. What is
serious event the flash point of the material, rate its
2. Incident mitigation: which one: stability when unconfined.
i) gas detection systems, 4. Quantity: how much material could
ii) plant operated under inert atmosphere, be released in a single event
iii) secure fire fighting system, 5. Chemical state: what is the process
iv) automatic or manual isolation systems temperature,what is the boiling point?
v) blast walls around high pressure 6. Commercial damage potential: what
equipment, is the value of plant within a 30m
vi) drain, dump or blowdown systems that radius, within 150m?
will deinventory plant 7. Toxicity: rate the toxicity from: a) no
vii) fire proofing of plant strct. and cables hazard to b) death or major injury on
viii) available supply of fire water, hour? very short exposure
ix) foam system or water curtain 8. Population: number of people, on site
and off site, within 500m of release
point
3. Risk Analysis
9
5/30/2015
4. Inspection Planning
When or before the risk target is reached, an inspection of the
equipment is recommended based on a ranking of the
component damage mechanisms that have the highest
calculated damage factors.
4. Inspection Effectiveness
Lack of coverage of an area subject to deterioration,
Inherent limitations of some inspection methods to detect and
quantify certain types of deterioration,
Selection of inappropriate inspection methods and tools,
Application of methods and tools by inadequately trained
inspection personnel,
Inadequate inspection procedures,
The damage rate under some conditions (e.g. start-up, shut-
down, or process upsets) may increase the likelihood or
probability that failure may occur within a very short time.
Inaccurate analysis of results leading to inaccurate trending of
individual components, and Probability of detection of the applied
NDE technique for a given component type, metallurgy,
temperature and geometry .
10
5/30/2015
5. Mitigation
Reducing the POF, Primary source of consequence,
magnitude of consequence:
• Equipment Replacement and Repair
• Evaluating Flaws for Fitness-For-Service
• Equipment Modification, Redesign, and Rerating
• Emergency Isolation
• Emergency Depressurizing/Deinventorying
• Modify Process
• Water Spray/Deluge
• Blast-resistant Construction
• spill detector
• Fireproofing
• …….;
6. Reassessment and
Updating RBI Assessments
Why Conduct an RBI Reassessment?
• Damage Mechanisms and Inspection Activities
• Process and Hardware Changes
• RBI Assessment Premise Change
• The Effect of Mitigation Strategies
When to Conduct an RBI Reassessment?
• After Significant Changes
• After a Set Time Period
• After Implementation of Risk Mitigation Strategies
• Before and After Maintenance Turnarounds
11
5/30/2015
RBI Softwares
RBI™ ORBIT™ S.RBI
RiskWISE™ RB.Eye
RB.QEye
FAME+
RISKWISE™
Risk Based Inspection / Risk Based
Maintenance software
12
5/30/2015
Demonstrator Contents
TWI Ltd is the sole owner of this software
demonstration show and may change this System Overview
demonstration without issuing notice. No Introduction
person or entity may reproduce or transmit Ease of Use
Access Controls
any part of the demonstration without written
Knowledge-base
permission from TWI Ltd.
Options and Settings
Fluid Properties
Nameplate Information
Inspection History
Damage Mechanisms
Risk Factors
Risk Summary
Risk Profile
Record Data Tables
Record Properties
Risk Mitigation
Risk Comparison
Inspection Plans
Management Reporting
Contact TWI
Folder
Tree
Drag „n Drop
Table Sorting
Intuitive
Interface
Graphical
Navigation
13
5/30/2015
14
5/30/2015
15
5/30/2015
16
5/30/2015
17
5/30/2015
18
5/30/2015
19
5/30/2015
20
5/30/2015
$900k
$700k
$500k
$300k
$100k
Inspection
Savings
Production
Cost Savings
RBI
21
5/30/2015
22
5/30/2015
NEW
Released
Feature
RISKWISE 2014
RBI EXAMPLE
Quantitative Assessment of a Boiler
23
5/30/2015
Application
Selection
Chosse boilers as
Oil,Gas and
Process Plant
Suite
Current Table
A table of current
revision records or a
table of all proposal
records can be
displayed by
navigating to these
screens via the
shortcut bar.
These lengthy tables
can be organised
and sorted by
dragging the column
titles to the top of the
screen, into any
ordered display
hierarchy:
24
5/30/2015
Item Proposal
Once you have
specified the
equipment class,
(for example,
specify that a
particular pipe is a
Hot Reheat Pipe),
the list of expected
damage
mechanisms is
shortened
automatically to
display the types of
damage that might
be expected.
Item Properties
The entries on the
unit properties
screen determine
the risk associated
with various items
in boilers.
25
5/30/2015
Item Properties
Enlarge the picture
to see the detailes
you have to enter.
Risk Factors
All of the items on
the Risk Factors
screen will be read-
only if the item
properties, damage
mechanisms and
inspection methods
screens are fully
completed. If you
need to change any
of these values you
will need to change
back to manual
mode
26
5/30/2015
RISK Analysis
The assessment
points for each of the
three risk analysis
periods can be
toggled on or hidden
via the buttons on the
toolbar. For example,
if you wish to display
the assessment
points for the first
analysis period (1AP)
only, select the
buttons to HIDE 2AP
and HIDE 3AP. The
risk plot will then only
display 1AP ( )
assessments points.
Level 1
Assessment
The level 1
assessment is a
unit level
assessment to
assess a boiler as a
whole. To switch to
the level 1 view,
click on the
assessment level
toggle at the top of
the main screen.
When switching to
the level 1
assessment, the list
of items now only
shows units.
27
5/30/2015
Home
You can right-click
on an existing unit
to create a
proposal, or create
a new unit or
proposal
from the links on
the home screen.
Unit
Proposal
Each unit has a set
of properties
associated with it
in a similar way
that other (level 2)
components have
an item properties
list. The proposal
record can be
viewed by double
clicking on it in the
items list.
28
5/30/2015
Unit
Analysis
The analysis
screen shows the
business
consequence of
the major
components of the
boiler failure.
mj.ranjbar@gmail.com
29