You are on page 1of 5

Jose Luis GARCIA TUCCI

Senior Electrical Engineer

Profile & Experience


Over ten years of experience as power Electrical Engineer with broad
knowledge in execution and development of different engineering projects
(HV, MV & LV) for industrial plants, oil & gas, petrochemical, substations
and overhead power line.

Proactive and capable to solve many problems, trained in management


skills and knowledge of planning and executing engineering projects.
At a glance …
I enjoy solving technical problems and carry out innovative solutions.

Strategic Positions
Project Engineer
Career Highlights
Participation in major EPC projects related to Oil & Gas and Petrochemical Special Competences
plants being able to be part of top quality Basic & Detailed engineering.
 Detailed & Basic Engineer
design.
Advance skills in designing stages related to HV, MV and LV power systems
 Power System Simulations &
according to IEEE & American Standards as well as a broad experience
Studies.
with IEC Standards. Education in Renewable energies Solar and Wind
 Industrial Lighting Design.
Power Certificates.
 Lightning Protection.
 Substation grounding grid
Experienced command of:
design.
 Microsoft Office™ tools
 IEEE & IEC Standards.
 ETAP Power Station for Load Flows, Protection
 3D modelling and drafting
Coordination, Arc Flash Studies, Grounding Design
skills in different software.
 AutoCad ™ 2D&3D
 Excel Languages
 DIALux
 MS Project  Spanish, Mother Tongue
 English, Advance (spoken
and written)
Intermediate command of:  French (Basic)
 DigSilent
 PLS-Cadd Relevant Strengths
 Microstation  Proactive, results oriented
 Autocad MEP 2014 Qualifications
- Postgraduate Studies (Diseño y
Cálculo de Instalaciones Eléctricas y
Main projects involved Especiales, Universitat Politécnica de
Catalunya)
YAMAL – LNG Project -Degree in Electrical Engineering
Petrochemical Plant in Europe EPCm Services (Ingeniero Electricista Mención
El Palito Refinery Expansion Project EPsCm Stage PEQUIVEN “Sulfuric Potencia, Universidad Central de
Acid plant III” EPC Venezuela) (2011)
400 kV and 115 kV Transmission Lines associated to FMO Iron and
Steel Industries, Venezuela Nationality
Study of the Protective Coordination Devices -Spanish
Wind Energy - Wind Turbine Design

Page 1 of 5
Jose Luis GARCIA TUCCI
Senior Electrical Engineer

Detailed Background
GE RENEWABLE ENERGY

Lead Engineer - Electrical Component -Tower Internals Design


August 2017-Present Electrical Lead Engineer
Responsible for the design of electrical systems into Tower Internals department for
Wind Turbines.
TechnipFMC (Former Technip)

Lead Electrical Engineer (Technip Iberia)


August 2016-August 2017 Electrical Lead Engineer

Electrical accountabilities:
 Detailed Engineering.
 Consumer Lists.
 Cable Schedules.
 Manage and design follow up for:
Single & Three line diagrams.
Pump Motors Data-sheets.
Lightning Protection.
Lighting Design.
Lighting Layouts.
Lightning & Grounding Layouts.
Electric Raceways.
 Vendor & Subcontractor follow up
 Planning Follow up
 Technology: ETAP, Dialux, Autocad, Office, Microstation
Lead Electrical Engineer (Paris Headquarters)
November 2015-August 2016 Yamal LNG Project – Electrical Lead Engineer P2/P3 Installation Team

Electrical accountabilities:
 Substation Interfaces.
 110kV Power Network Installation Reviews
 Remote Field Engineering Coordination between Yards
 Vendors and Subcontractors meetings coordination
 Modules completion reports follow up
 Coordination of installation deliverables with other operating centers.
 Price Schedules.
 Review and follow up of installation design of Different Yards
 Weight Control Reports.
 Review of Lighting Design.
 Review of Lighting Layouts.
 3D Model Review meetings.
 Electric Raceways.
 Technology: ETAP, Dialux, Autocad, Office, Microstation, AVEVA PDMS

Deputy Lead Electrical Engineer (Paris Headquarters)


June 2014-November 2015 Yamal LNG Project – Electrical Installation Team

Electrical accountabilities:
 Substation Interfaces.
 Coordination of installation deliverables with other operating centers.
 Price Schedules.
 Material Requisitions.
 Review and follow up of installation design.

Page 2 of 5
Jose Luis GARCIA TUCCI
Senior Electrical Engineer

 Weight Control Reports.


 Review of Lighting Design.
 Review of Lighting Layouts.
 3D Model Review meetings.
 Electric Raceways.
 Technology: ETAP, Dialux, Autocad, Office, Microstation, AVEVA PDMS

Project Engineer Electrical Department (Technip Iberia)


July 2013- June 2014 International Client – Petrochemical Plant in Europe EPCm Services

Electrical accountabilities:
 Detailed Engineering.
 Consumer Lists.
 Cable Schedules.
 Single & Three line diagrams.
 Pump Motors Data-sheets.
 Lightning Protection.
 Lighting Design.
 Lighting Layouts.
 Lightning & Grounding Layouts.
 Electric Raceways.
 Technology: ETAP, Dialux, Autocad, Office, Microstation

EMPRESAS Y&V (INGENIERÍA Y CONSTRUCCIÓN) (VENEZUELA)

Project Engineer Electrical Department


February 2013– July 2013 PDVSA – El Palito Refinery Expansion Project EPsCm Stage

- Detailed Engineering.
- Lighting Design Unit Product Storage 9300 ULS/Diesel/DVGO (DIALux).
- Detailed Engineering.
- Lighting Layout plans Unit 9300 ULS/Diesel/DVGO.
- Pump Motors Data-sheets.
- Lightning Protection Design According to NFPA 780-2008.
- Hazardous Area Classification Unit 9300 ULS/Diesel/DVGO.
- Grounding Layout plans Unit 9300 ULS/Diesl/DVGO
- Electric Raceways.
- Technology: ETAP, Dialux, Autocad, Office

PEQUIVEN “Sulfuric Acid plant III” located in Morón, Estado


Carabobo, Región Central de Venezuela

- Lightning Protection Design According to NFPA 780-2008 (Process Area).


- Lighting Design Boilers Area (DIALux).
- Study of the Protective Coordination Devices due to changes in the cable gauge of
Transformers TR5 and TR6 neutral conductor (ETAP).
- Technology: ETAP, Dialux, Autocad, Office

Page 3 of 5
Jose Luis GARCIA TUCCI
Senior Electrical Engineer
GEOHIDRA CONSULTORES C.A. (VENEZUELA)

Electrical Engineer
March 2012– January 2013 Development of contingencies plans for the thermoelectric power plants: EDC Sur, La
Raisa, El Sitio, Barcazas, Picure, Tacoa and Ampliacion Tacoas of CORPOELEC

- Assessment on Electric risk identification in all of the thermoelectric power plant.


- Assessment on the development of contingencies plans.
- Identification of Fire protection Facilities.
- Layout plans of contingencies plans and affectation areas.
- Technology: Autocad, DMV PHAST, Office

UNIVERSIDAD CENTRAL DE VENEZUELA (VENEZUELA)


Associate Professor
May 2012–July 2013 Teaching 8th Semester Subject: Power Plants and Substations
- High Voltage Substations Topologies
- OPF Factor
- Minimum Clearance Distances, Dimensioning a typical high voltage Substation.
- Surge Arresters Selection.
- Current and voltage transformer selection
- Auxiliary systems design.
- Substation grounding design according to IEC and IEEE standards

PROYECTOS E INVERSIONES MV C.A. (VENEZUELA)

Field Electrical Engineer


February 2012–March 2012 Cable Vision, Expansion of Movistar Antenna Site Los Campitos Caracas, PCmS.

- Field work supervisor.


- Electric Installations Supervising
- Weekly reports (work quantities, materials requirements, etc.).
- Technology: Autocad, Office
EPICE C.A.(VENZUELA)

Assistant Engineer
October 2008–August 2011 230 kV Interconnecting Transmission Line, Paraguana-Isiro. Venezuela. (Engineering)

- Field work on route survey.


- Maps a GIS work (Autocad, Globalmapper).
- PLS-CADD Assessment on structures localization.
- Layout drawings.

400 kV and 115 kV Transmission Lines associated to FMO Iron and Steel Industries,
Guayana. Venezuela. (Engineering)

- Field work survey LIDAR Data processing and managing into PLS-CADD.
- Maps a GIS work (Autocad, Globalmapper).
- PLS-CADD Assessment on structures localization.
- Layout plans.
- Autocad, Globalmapper, PLS-CADD, Office

Page 4 of 5
Jose Luis GARCIA TUCCI
Senior Electrical Engineer

FORMATION

 Smart Grids Integration and Modeling, Delft University of Technology. (Starting February 2020)
 Become a Python Developer & Advance Python (October 2019)
 EPLAN Electric P8 FB1 & FB2, EPLAN Software & Services S.A. (November 2017)
 Wind Energy, Technical University of Denmark (DTU). (April 2016)
 Excel for Data Analysis and Visualization, Microsoft Excel, Microsoft.
(October 2015)
 Solar Energy Technology, Delft University of Technology. (December
2015)
 Introducción para la Certificación PMP-PMI de la UCAM, Universidad
Católica San Antonio de Murcia. (March 2014)
 ETAP PowerStation 7.5 Modelado y Simulación de Sistemas Eléctricos,
CENTECPRO, Maracaibo. (February 2013)
 HITACHI Gas Turbine Seminar (2012)
 MS Project: Definición y Planificación de Proyectos, Universidad Central
de Venezuela, Facultad de Ciencias, CENEAC, (2011)
 Alumbrado Público, Universidad Central de Venezuela, Facultad de
Ingeniería, Prof. Miguel Ereu, (2008)
 Sistemas de Puesta a Tierra, Universidad Central de Venezuela, Facultad
de Ingeniería, Prof. Nerio Ojeda, (2008).
 Autocad 3D, Universidad Central de Venezuela, Facultad de Ingeniería,
(2005)
 English as a second language Ottawa Board of Education, Lisgar
Collegiate Institute. Canada, (1993)

Page 5 of 5

You might also like